IR 05000498/1977003

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-498/77-03 & 50-499/77-03
ML19331D536
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/14/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19331D537 List:
References
NUDOCS 8009030159
Download: ML19331D536 (1)


Text

[

&

/pm afcoq'o..

NUCLEAR REGULATORY COMMISSION

.

UNITED STATES

'

,

J.

'n REGloN IV fi.i j 611 RY AN PLAZA oRiVE, SUITE 1000 2 i

"n

/, 3 ARLINGTON, TEXAS 76012

,

%,

/ 9

%

M

.....

August 14, 1980 In Reply Refer To:

RIV Docket No. 50-498/Rpt. 77-03 50-499/Rpt. 77-03 Houston Lighting and Power Company ATTN:

Mr. G. W. Oprea, Jr.

Executive Vice President Post Office Box 1700 Houston, Texas 77001 Gentlemen:

Thank you for your letter of July 22, 1980, in which you describe a revision of your previous commitment to e stablish a fomal rotation of Pittsburgh Testing Laboratory (PTL) personnel on a regular basis. Your revised system consisting of reviews and multi-tiered supervision as well as assignment of personnel with higher levels of education and/or background experience, appears to provide an acceptable method of assuring that PTL records accurately reflect test results.

We will review implementation of your revised system during future NRC inspections.

Sincerely,

,D

./

d&.1 W. C. Seidld, Chief Reactor Construction and Engineering Support Branch 8009o30159