WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme
ML17123A201 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/26/2017 |
From: | Reasoner C Wolf Creek |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17123A291 | List: |
References | |
WO 17-0042 | |
Download: ML17123A201 (2) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Letter type:WO
MONTHYEARWO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023
[Table view]Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations WO 23-0009, Financial Protection Levels2023-03-31031 March 2023 Financial Protection Levels WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 22-0015, Generation Station - Guarantee of Payment of Deferred Premiums2022-05-0606 May 2022 Generation Station - Guarantee of Payment of Deferred Premiums WO 22-0011, Operating Corp., Financial Protection Levels2022-03-29029 March 2022 Operating Corp., Financial Protection Levels WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-0909 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082021-12-29029 December 2021 Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness2021-08-12012 August 2021 (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness2021-07-29029 July 2021 One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums2021-05-0707 May 2021 Operating Corp - Guarantee of Payment of Deferred Premiums WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-14014 April 2021 Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0014, Financial Protection Levels2021-03-30030 March 2021 Financial Protection Levels WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report2021-03-11011 March 2021 Submittal of Revision 34 to Updated Safety Analysis Report WO 21-0002, Notification of Readiness for Supplemental Inspection 927232021-01-28028 January 2021 Notification of Readiness for Supplemental Inspection 92723 WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082020-12-23023 December 2020 Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report2020-07-23023 July 2020 Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0047, Guarantee of Payment of Deferred Premiums2020-05-0707 May 2020 Guarantee of Payment of Deferred Premiums WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies WO 20-0024, Financial Protection Levels2020-03-31031 March 2020 Financial Protection Levels WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082019-12-23023 December 2019 Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System2019-08-29029 August 2019 License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-08-0808 August 2019 Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 19-0011, Financial Protection Levels2019-03-27027 March 2019 Financial Protection Levels WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan2018-11-19019 November 2018 Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection2018-08-15015 August 2018 Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12018-07-23023 July 2018 Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2018-04-0505 April 2018 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan2017-12-19019 December 2017 License Amendment Request (LAR) for Revision to the Emergency Plan WO 17-0092, Request for Regulatory Conference (EA-17-149)2017-11-0808 November 2017 Request for Regulatory Conference (EA-17-149) WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary2017-10-10010 October 2017 Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme2017-04-26026 April 2017 Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-04-20020 April 2017 Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-04-17017 April 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-03-27027 March 2017 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme2017-03-16016 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme WO 17-0009, Revision 30 to Updated Safety Analysis Report2017-03-0909 March 2017 Revision 30 to Updated Safety Analysis Report WO 16-0068, Docket No. 50-482: Request for Regulatory Conference2016-12-21021 December 2016 Docket No. 50-482: Request for Regulatory Conference 2023-05-17 Category:Response to Request for Additional Information (RAI) MONTHYEARET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023
[Table view]Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ML21168A1102021-06-0707 June 2021 4, Response to Request for Additional Information (RAI) ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19092A0932019-03-11011 March 2019 Revision 32 to Updated Safety Analysis Report. Responses to NRC Questions 005.1 Through 031.20 ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18331A2562018-11-19019 November 2018 Operating Corporation (Wcnoc), Unit 1 - Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ML18114A1162018-04-19019 April 2018 SAP-18-34, Supplemental 30 Day Responses to NRC Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies. ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ET 17-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-10-18018 October 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ET 17-0016, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses2017-07-13013 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses ML17171A2332017-06-12012 June 2017 Response to Request for FLEX Audit Documentation ET 17-0011, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses2017-05-0404 May 2017 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme2017-04-26026 April 2017 Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme ML17123A2022017-04-26026 April 2017 Enclosure to WO 17-0042 - WCNOC EAL Technical Basis Document WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme2017-03-16016 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme ET 17-0003, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan2017-01-19019 January 2017 Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal ET 16-0036, Response to Request for Additional Information Regarding 10 CFR 50.55a Requests 13R-14 and 13R-152016-12-12012 December 2016 Response to Request for Additional Information Regarding 10 CFR 50.55a Requests 13R-14 and 13R-15 ET 16-0034, Operating Corporation - Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-132016-11-30030 November 2016 Operating Corporation - Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-13 ET 16-0031, Response to Request for Additional Information Related to Relief Request Number 14R-03, Request for Relief from Paragraph-3200(b) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds2016-11-0404 November 2016 Response to Request for Additional Information Related to Relief Request Number 14R-03, Request for Relief from Paragraph-3200(b) of ASME Code Case N-729-1 for Reactor Vessel Head Penetration Nozzle Welds ET 16-0024, Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2016-11-0202 November 2016 Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ET 16-0026, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-11-0101 November 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ET 16-0028, Response to Request for Additional Information Re Relief Request Number I4R-03 for Reactor Vessel Head Penetration Nozzle Welds2016-10-20020 October 2016 Response to Request for Additional Information Re Relief Request Number I4R-03 for Reactor Vessel Head Penetration Nozzle Welds WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Response to NRC Questions2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Response to NRC Questions ML16204A0132016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, Response to NRC Questions ET 16-0016, Response to Request for Additional Information Re License Amendment Request to Allow Use of Optimized Zirlo2016-05-19019 May 2016 Response to Request for Additional Information Re License Amendment Request to Allow Use of Optimized Zirlo ET 16-0009, Response to Request for Additional Information Regarding Flood Hazard Reevaluation Report, Revision 12016-02-23023 February 2016 Response to Request for Additional Information Regarding Flood Hazard Reevaluation Report, Revision 1 WO 16-0003, Responses to Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-01-18018 January 2016 Responses to Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ET 15-0026, Response to Request for Additional Information Regarding the Expedited Seismic Evaluation Process Report2015-11-11011 November 2015 Response to Request for Additional Information Regarding the Expedited Seismic Evaluation Process Report ET 15-0015, Response to Request for Additional Information Regarding Expedited Seismic Evaluation Process (ESEP) Report2015-06-24024 June 2015 Response to Request for Additional Information Regarding Expedited Seismic Evaluation Process (ESEP) Report 2023-01-26 |
Contents
Text
W~LFCREEK 'NUCLEAR OPERATING CORPORATION Cleveland Reasoner Site Vice President April 26, 2017 WO 17-0042 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," dated November 2012
- 2) Letter dated March 28, 2013, from M. Thaggard, USNRC, to S.
Perkins-Grew, NEI, "U.S. Nuclear Regulatory Commission Review and Endorsement of NEI 99-01, Revision 6, Dated November, 2012 (TAC No. D92368)"
- 3) Letter WO 16-0045, dated September 30, 2016, from C. 0. Reasoner, WCNOC, to USNRC
- 5) Letter WO 17-0013, dated March 16, 2017, from C. 0. Reasoner, WCNOC, to USNRC
Subject:
Docket No. 50-482: Supplement to RAI Response Regarding Adopting New EAL Scheme To Whom It May Concern:
Reference 1 provides the Nuclear Energy lnstitute's (NEI) revised Emergency Action Level (EAL) scheme, which was endorsed by the Nuclear Regulatory Commission (NRC) as documented in Reference 2. Wolf Creek Nuclear Operating Corporation (WCNOC) submitted a License Amendment Request (LAR) in Reference 3 to adopt NEl's revised EAL scheme. The NRC provided a request for additional information (RAI) contained in Reference 4 pertaining to this LAR. WCNOC then submitted its response to the RAI in Reference 5.
A phone conference was held on April 11, 2017, between NRC staff and WCNOC personnel regarding the definition of "visible damage" as it relates to hazardous events in certain EALs.
This letter supplements the information provided in Reference 5 in regards to the definition of "visible damage" as applied to EAL bases SA9.1 and CA6.1. The revisions to SA9.1 and CA6.1 provide clarification that an Alert should not be declared if the safety system affected by a P.O. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
WO 17-0042 Page 2 of 2 hazard was not functional prior to the event. In addition, an Alert should also not be declared when the hazardous event has not caused indications of degraded performance or visible damage on a second train of the same safety system. These clarifications help provide better guidance to prevent unnecessary entry into Alert conditions. The Enclosure to this submittal provides WCNOC's EAL Technical Basis Document revised to reflect the changes made to EAL bases SA9.1 and CA6.1.
WCNOC has the following upcoming activities scheduled: Initial Licensed Operator Exam in October 2017, Emergency Plan Evaluated Exercise in November 2017, Refueling Outage 22 in March 2018, and Licensed Operator Requalification Exam in June 2018. Due to the schedule of these activities, and to make sure personnel can be properly trained on the new EAL scheme, WCNOC requests an implementation date of September 30, 2018.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4171, or Cynthia R. Hafenstine (620) 364-4204.
Sincerely, Cleveland Reasoner COR/rlt
Enclosure:
Revised EAL Technical Basis Document cc: K. M. Kennedy (NRC), w/e B. K. Singal (NRC), w/e N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e