May 08, 2025

SUBJECT:

WOLF CREEK GENERATING STATION - INTEGRATED INSPECTION REPORT 05000482/2025001

Dear Cleve Reasoner:

On March 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On April 1, 2025, the NRC inspectors discussed the results of this inspection with Jaime McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ami N. Agrawal, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2025001

Enterprise Identifier:

I-2025-001-0010

Licensee:

Wolf Creek Nuclear Operating Corp.

Facility:

Wolf Creek Generating Station

Location:

Burlington, KS

Inspection Dates:

January 1, 2025, to March 31, 2025

Inspectors:

C. Henderson, Senior Resident Inspector

C. Sigel, Resident Inspector

Approved By:

Ami N. Agrawal, Chief

Reactor Projects Branch B

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Wolf Creek Generating Station began the inspection period at full power. On January 16, 2025, the licensee reduced power to 85 percent for main turbine valve testing and returned to full power on January 17, 2025. The unit remained at full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness on January 8, 2025, for seasonal extreme weather conditions prior to the onset of cold weather preparations for the following systems:
  • condensate storage tank
  • diesel-and motor-driven fire pumps

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending high winds with gusts up to 70 miles per hour on March 4, 2025.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)restoration of component cooling water service loop following a safety-related bus lockout/loss during a design basis accident on February 4, 2025 (2)station blackout diesel generators and aligning the non-safety auxiliary feedwater pump on February 11, 2025 (3)non-safety-related charging pump out of service and emergency core cooling system centrifugal charging system alignment on February 13, 2025

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the emergency core cooling system centrifugal charging subsystem system on February 11, 2025.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)temporary diesel fire pump installation and removal during pump C circulating water bay work on January 15, 2025 (2)train A essential service water room, fire area essential service water A, on February 10, 2025 (3)diesel fire pump deficiencies on February 20, 2025 (4)communication corridor 2000 elevation, fire area CC-1, on March 24, 2025 (5)room 3402 of communication corridor 2016 elevation, fire area CC-1, on March 24, 2025

Fire Brigade Drill Performance Sample (IP Section 03.02) (2 Samples)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill in the fuel building electrical equipment room, fire area F-5, on January 31, 2025.
(2) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill in the turbine building 2033 elevation, fire area T-7, room 4401, on March 21, 2025.

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the auxiliary feedwater water pipe chase room on February 23, 2024.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during main turbine valve surveillance testing on January 17, 2025.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a bus lockout followed by a loss of the unit transformer leading to a loss of all AC on January 21, 2025.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)paragraph 50.65(a)(3) of 10 CFR assessment on February 21, 2025 (2)centrifugal charging pump system maintenance effectiveness on March 17, 2025 (3)station blackout diesel generator maintenance effectiveness on March 24, 2025

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)emergent work for troubleshooting and repair of power range nuclear instrument 41 failure on January 16, 2025 (2)emergent work protection set 2 fuse troubleshoot/repair on January 24, 2025 (3)emergency work for train A motor-driven auxiliary feedwater pump discharge header to steam generator B motor-operated isolation valve, ALHV009, troubleshooting and repair on March 20, 2025 (4)train B emergency diesel generator 14-day equipment outage during the week of March 24, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)reactor coolant pump seal cooling single failure requirements during design basis accidents with containment isolation signal B operability determination on February 6, 2025 (2)condensate storage tank minimum tank level due to seal leakage operability determination on February 7, 2025 (3)train A control room air conditioning system blown fuse past operability determination on February 23, 2025 (4)train B residual heat removal room cooler failure to start and degraded airflow operability determination on March 3, 2025 (5)480-volt load center and motor control centers breaker coordination operability determination on March 12, 2025

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1)permanent modification for changing breaker location for main steam and feedwater isolation control cabinet, SA075A, on March 4, 2025

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (5 Samples)

(1)power range detector NI44 card replacement post-maintenance testing on March 7, 2025 (2)engineered safety feature actuation system channel logic cabinet power supply replacement post-maintenance testing on March 7, 2025 (3)turbine-driven auxiliary feedwater pump steam strainer repair post-maintenance testing on March 19, 2025 (4)solid state protection set 2 fuse replacement post-maintenance testing on March 26, 2025 (5)train B emergency diesel generator excitation system and coupling maintenance post-maintenance testing on March 27, 2025

Surveillance Testing (IP Section 03.01) (3 Samples)

(1)seal water Injection flow path during accident conditions surveillance testing on February 26, 2025 (2)station blackout diesel generator and non-safety-related auxiliary feedwater pump quarterly and check valve surveillance testing on March 5, 2025 (3)charging system safety-related check valve surveillance testing on March 27, 2025

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1)charging pump flow balance and comprehensive test on February 26,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) January 1, 2024, through December 31, 2024 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
(1) January 1, 2024, through December 31, 2024

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) January 1, 2024, through December 31, 2024

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)updated safety analysis report and inservice testing basis document differences

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 1, 2025, the inspectors presented the integrated inspection results to Jaime McCoy, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AI 14-006

Severe Weather

STN EF-020A

ESW Train A Warming Line Verification

2A

SYS EC-121

Recirc of the RWST through the Fuel Pool Cleanup System

SYS EF-200

Operation of the ESW System

71111.01

Procedures

SYS OPS-008

Cold Weather Operations

13A

69466-M-002

Non-Safety Auxiliary Feedwater Pump Net Positive Suction

Head

EF-M-080

UHS Inventory Losses from ESW through the AFW System

Calculations

SA-91-016-000-

CN001

Seal Injection Flow Change Notice Calculation

Corrective Action

Documents

Condition Report

(CR)

10038387, 10039231, 10039238

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR)

10040131

2-EM02

Piping & Instrumentation Diagram High Pressure Coolant

Injection System

M-12AD01

Piping and Instrumentation Diagram Condensate System

M-12AK03

Piping and Instrumentation Diagram Condensate

Demineralizer System

M-12AL01

Piping and Instrumentation Diagram Auxiliary Feedwater

System

M-12AP01

Piping and Instrumentation Diagram Condensate Storage

and Transfer System

M-12BG01

Piping & Instrumentation Diagram Chemical and Volume

Control System

M-12BG03

Piping and Instrumentation Diagram Chemical & Volume

Control System

71111.04

Drawings

M-12EG02

Piping and Instrumentation Diagram Component Cooling

Water System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

M-12EG03

Piping and Instrumentation Diagram Component Cooling

Water System

M-12FB02

Piping and Instrumentation Diagram Auxiliary Steam System

Engineering

Changes

DCP 020085

Replace ALV0187 with Check Valve

Miscellaneous

WCRE-34

Fourth 10-Year Interval Inservice Testing Basis Document

AI 21-016

Operator Time Critical Actions Validation

ALR 00-018A

NB01 Bus Lockout

ALR 00-018B

NB01 Bus UV

16A

ALR 00-021A

NB02 Bus Lockout

ALR 00-051D

CCW SRG TK A Lev HILO

ALR 00-053D

CCW SRG TK B Lev HILO

ALR 00-21B

NB02 Bus UV

18A

ALR-00-041A

Seal Inj to RCP Flow Lo

BD-EMG E-0

Reactor Trip or Safety Injection

EMG E-0

Reactor Trip or Safety Injection

OFN EG-004

CCW System Malfunctions

OFN NB-030

Loss of AC Emergency Bus NB01 (NB02)

STS BG-004

CVCS Seal Injection and Return Flow Balance

STS BG-210

CVCS Inservice Check Valve Test

STS EM-003A

ECCS (CCP) Flow Balance and CCP Comprehensive Test

SYS AP-122

Non-Safety Aux Feed Pump Operation

Procedures

SYS BG-201

Shifting Charging Pumps

Calculations

DC-FP-01-WC

Design Criteria for Fire Protection System

Corrective Action

Documents

Condition Report

(CR)

10039015, 10039033, 10039623, 10039264, 10039625

M-0023

Piping and Instrumentation Diagram Fire Protection System

(FP)

M-12EF01

Piping Instrumentation Diagram Essential SVC Water

System

M-12KC02

Piping & Instrumentation Diagram Fire Protection System

71111.05

Drawings

M-K2EF01

Piping & Instrumentation Diagram Essential Service Water

System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

A-3838

Specification for Equipment Erection and Miscellaneous

Indoor Piping and Instrumentation

Miscellaneous

Permit

PT 115453

ALR-00-08F

CWSH HVAC Trouble

ALR-027

Diesel Fire Pump Room HVAC Control Panel 1PL39E

3A

AP 10-100

Fire Protection Program

26A

AP 10-100

Fire Protection Program

AP 10-104

Fire Protection Impairment Control

AP 10-105

Fire Protection Training and Drills

AP 10-106

Fire preplans

AP 21B-003

Control of Non-Plant Items Inside or Near Plant Systems,

Structures, and Components

013A

AP 22C-003

On-Line Nuclear Safety and Generation Risk Assessment

STN FP-209

Fire Pump Performance and Sequential Start Test

SYS FP-280

Temporary Diesel Fire Pump Installation and Removal

Procedures

WCRE-35

Boundary Matrix

EF-M-046

UHS Analysis with Initial Lake Temperatures Up to 94 F

EF-M-080

UHS Inventory Losses form ESW through the AFW System

FL-13

Auxiliary Building Area 5 Flooding

Calculations

LE-M-002

Flood Level in Auxiliary Building Rooms 1206 and 1207 due

to Pipe Break

Corrective Action

Documents

Condition Report

(CR)

137491, 10013710

M-12AL01

Piping and Instrumentation Diagram Auxiliary Feedwater

System

M-12AP01

Piping and Instrumentation Diagram Condensate Storage

and Transfer System

Drawings

M-1G022

Equipment Locations Reactor and Auxiliary Buildings Plan

Ground Floor El. 2000-00

Miscellaneous

MS-02

Pipe Class Sheets

ALR 00-095C

AFP RM Sump LEV HI

Procedures

AP 10-106

Fire Preplans

71111.06

Work Orders

WO

04-263475-000, 21-475848-000, 21-475848-001

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ALR 00-042E

Charging PMP Trouble

EMG CS-01

Loss of All AC Power Recovery Without SI Required

30A

EMG E-0

Reactor Trip or Safety Injection

OFN NB-030

Loss of AC Emergency bus NB01 (NB02)

71111.11Q

Procedures

STS AC-001

Main Turbine Valve Cycle Test

Corrective Action

Documents

Condition Report

(CR)

10015381, 10017585, 10017596, 10018059, 10019061,

10021247, 10032355, 10033145, 10036229, 10036230,

10036231, 10036232, 10036236, 10036237, 10036327,

10036361, 10039073, 10039746, 10038438, 10037160,

10036506, 10036110, 10034825, 10032541, 10031270,

10030225, 10029678, 10026582, 10025520, 10023792,

10023593, 10023591, 10013439, 10012341, 10038246,

10038369, 10038387, 10038819, 10038892, 10010238,

10010613, 10011637, 10039469, 10040022

Drawings

M-12AL01

Piping and Instrumentation Diagram Auxiliary Feedwater

System

M-022-00001

Station Blackout Diesel Generator Kohler Instruction Manual

W03

M-022-00002

Kohler Station Blackout Diesel Generator

W07

M-022-00009

Kohler Station Blackout Diesel Generator, Wolf Creek Key

Drawings

W04

M-022-00012

SBO Diesel Generator Battery and 125 VDC Support

Equipment

W01

M-022-00014

Instruction Manual for the SBO Diesel Fuel Tank

W03

M-022-00018

Station Blackout Diesel Operations and Maintenance Manual

W01

Miscellaneous

WCRE-34

Fourth 10-Year Interval Inservice Testing Basis Document

AI 16B-002

Preventive Maintenance Change Process

AP 16B-003

Planning and Scheduling Preventive Maintenance

AP 26C-004

Operability Determinations and Functionality Assessments

AP 28-011

Resolving Degraded or Nonconforming Conditions Impacting

SSCS

008

CKL ZL-001

Auxiliary Building Reading Sheets

118

EDI 23M-060

Performing Maintenance Rule Periodic Assessment

71111.12

Procedures

STS AL-106A

Motor Driven AFW Pump A Discharge Check Valve Closed

Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Work Orders

WO 2601, 40081, 98452, 98672, 105063, 21-476112-000,

2-477912-000

Corrective Action

Documents

Condition Report

(CR)

10039073, 10040455, 10040458

E-025-00007,

Sheet 18

AFWP Disch Hdr to SG B ISO

M-12AE-02

Piping & Instrumentation Drawing Feedwater System

Drawings

M-12AL-01-001

Piping & Instrumentation Drawing Auxiliary Feedwater

System

Miscellaneous

M-762-02109-

0001

Power Range Schematic Diagram

01/28/2015

AI 22C-013

Protected Equipment Program

AP 22C-003

On-Line Nuclear Safety and Generation Risk Assessment

AP 22C-008

Qualitative Risk Management

OFN SB-008

Instrument Malfunctions

SYS KJ-124

Post Maintenance Run of Emergency Diesel Generator B

Procedures

TMP 25-001

Deenergizing SB042 for Maintenance

000

71111.13

Work Orders

WO 118544

AL-30-WC

AFW System Setpoints: Pump Suction Pressure; Automatic

ESW Switchover; and CST Low Level

EF-M-046

UHS Analysis With Initial Lake Temperatures Up to 94 F

EF-M-080

UHS Inventory Losses from ESW through the AFW System

GL-M-007

Calculate Cooling Load in SR Pump Rooms Post LOCA

XX-E-004

AC Motor Operated Valve Minimum Terminal Voltage

XX-E-006

AC System Analysis

Calculations

XX-E042

Class 1E 480 VAC and 208/120 VAC System Coordination

Corrective Action

Documents

Condition Report

(CR)

2275, 10000958, 10004624, 10018062, 10037823,

10037832, 10037979, 10038387, 10039369, 10039370,

10039371, 10039372, 10039388, 10039395, 10040139

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR)

10040095

71111.15

Drawings

E-11NG01

Low Voltage System Class 1E 480V Single Line Meter and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Relay Diagram

E-11NG20

Low Voltage Class 1E Motor Control Center Summary

21

E-13GG01

Schematic Diagram Emergency Exhaust Fans

M-12EG03

Piping and Instrumentation Diagram Component Cooling

Water System

M-12LE01

Piping and Instrumentation Diagram Turb. BLDG. and Aux.

Feedwater Pump Rooms Oily Waste System

M-13EG10

Schematic Diagram Containment Isolation Vlv. Return from

Therm. Bar Cooling Coil

M-622.1A-00007

SGK04A and SGK04B Air Conditioner Electrical Schematic

CCP 09879

Replace SGK04A/B and SGK05A/B Air Condition Units

Engineering

Changes

DECP 020350

SGK05A/B Fuse Replacement

M-622.1A-00089

Instruction Manual for SGK04A, SGK04B, SGK05A, and

SGK05B Air Conditioning Condensers

W19

WCNOC-171

Post-Fire Safe Shutdown Associated Circuits Study

Miscellaneous

WCRE-08

WCGS Fuse List

ALR 00-041A

Seal Inj to RCP Flow LO

ALR 00-042E

Charging Pump Trouble

AP 26C-004

Operability Determinations and Functionality Assessments

BD-EMG E-0

Reactor Trip or Safety Injection

EMG E-0

Reactor Trip or Safety Injection

EMG E-2

Faulted Steam Generator Isolation

STS CR-001

Shift Log for Modes 1, 3, and 3

117A

Procedures

SYS GK-123

Control Building A/C Units Startup and Shutdown

Work Orders

WO 109872, 95363

Corrective Action

Documents

Condition Report

(CR)

10036107, 10037794, 10037851, 10039229

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR)

10039109, 10040720

71111.18

Drawings

E-13AB30

Schematic Diagram Main Steam and Feedwater Isolation

Valves Miscellaneous Circuit

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Engineering

Changes

CP 020720

Changing Termination for NK05119 Switch

AI 07-002

Plant Design or Operational Change Evaluation

2A

AI 21-017

Time Fire Protection Actions Validation

10C

AP 05-003

Design Document Change Notice

10A

AP 05-005

Design, Implementation, and Configuration Control of

Modifications

AP 26A-003

CFR 50.59 Reviews

BD-EMG C-0

Loss of All AC Power

CKL NK-131

NK Distribution Switchboard Switch Lineup Checklist

EMG C-0

Loss of All AC Power

45, 46, 46A

EMG E-0

Reactor Trip or Safety Injection

IP-ENG-001

Standard Design Process (EB-17-06)

MCE DC-001

DC Ground Location

OFN EC-046

Fuel Pool Cooling and Cleanup Malfunctions

10A

OFN NB-034

Loss of All AC Power - Shutdown Conditions

Procedures

OFN RP-017

Control Room Evacuation

BG-M-055

Establishment of the Centrifugal Charging Pump (CCP)

Comprehensive Test Error Allowance and Minimum

Operability Limit Curve

Calculations

SA-91-016-000-

CN001

Seal Injection Flow Change Notice Calculation

Corrective Action

Documents

Condition Report

(CR)

10039073, 10039160, 10039637, 10040070

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR)

10040243

M-12AL01

Piping & Instrumentation Diagram Auxiliary Feedwater

System

M-12AP01

Piping and Instrumentation Diagram Condensate Storage

and Transfer System

71111.24

Drawings

M-12BG01

Piping & Instrumentation Diagram Chemical and Volume

Control System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

M-12BG03

Piping and Instrumentation Diagram Chemical & Volume

Control System

M-12FC02

Piping & Instrumentation Diagram Auxiliary Turbines

Auxiliary Feedwater Pump Turbine

M-19FC02

Hanger Location DWG. Small Pipe Aux. F.W. Pump Turbine

Drains - Aux. Bldg.

J-104-00563-001

Schematic +48, +15 and +/-15 VDC Power Supplies

D

M-022-00001

Station Blackout Diesel Generator Kohler Instruction Manual

W03

WCOP-02

Inservice Testing Program for Pumps, Valves, and Snubbers

Miscellaneous

WCRE-34

Fourth 10-Year Interval Inservice Testing Basis Document

ALR 00-041A

Seal Inj to RCP Flow LO

ALR 00-042E

Charging Pump Trouble

AP 16E-002

Post Maintenance Testing Development

21D

CWD-1

Control of Welding Documentation

STN KU-010

Station Blackout Diesel and Non-Safety AFW Pump Test

STS AL-103

TDAFW Pump Inservice Pump Test

76A

STS AL-211

TD AFP Comprehensive Pump Testing, Flow Path

Verification and CV Testing

STS BG-004

CVCS Seal Injection and Return Flow Balance

STS BG-210

CVCS Inservice Check Valve Test

STS EM-003A

ECCS (CCP) Flow Balance and CCP Comprehensive Test

STS IC-444

Channel Calibration Nuclear Instrumentation Power Range

Channel N44

18B

STS RE-012

QPRT Determination

Procedures

TMP 25-001

Deenergizing SB042 for Maintenance

000

Work Orders

WO 68112, 102347, 106432, 112452, 20-461937-000,

21-474758-000, 23-486670-000

Corrective Action

Documents

Condition Report

(CR)

10023659, 10035907, 10038184

71152A

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR)

10040723

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

M-12BB02

Piping and Instrumentation Diagram Reactor Coolant

System

Drawings

M-12EJ01

Piping and Instrumentation Diagram Residual Heat Removal

System

Miscellaneous

WCRE-34

Fourth 10-Year Interval Inservice Testing Basis Document

STN EG-205A

Component Cooling Water System Valve Test

3A

STN EG-205B

Component Cooling Water System Valve Test

SYS EG-201

Transferring Supply of CCW Service Loop and CCW Train

Shutdown

Procedures

SYS EM-121

ECCS Check Valve Leak Check

Work Orders

WO 2601, 94412, 22-478078-002