IR 05000458/1987024

From kanterella
Jump to navigation Jump to search
Ack Receipt of Advising NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/87-24
ML20236Y262
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/08/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8712110206
Download: ML20236Y262 (1)


Text

{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ In Reply Refer lo: - Docket: 50-458/87-24 DEC 8198T Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President, (RBNG) Nuclear Licensing P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen: Thank you for your letter of November 16, 1987, in response to our letter and Notice of Violation dated October 15, 1987. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, Original Shned By L.J. CaHan L. J. Callan, Director Division of Reactor Projects cc: Gulf States Utilities ATTN: J. E. Booker, Manager-River Bend Oversight P.O. Box 2951 Beaumont, Texas 77704 Louisiana State University, Government Documents Department Louisiana Radiation Ccntrol Program Director bec to DMB (IE01) - DRS and DRP bcc distrib. by RIV:

  • DRP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (DRP/C)
  • Lisa Shea, RM/ALF
  • MIS System RPSB-DRSS
  • RSTS Operator i
  • Project Engineer, DRP/C
  • RIV File
  • W. Paulson, NRR Project Manager
  • R. Hall
  • DRS
  • TSS D. Powers RIV:DRP/Cgy; DRP '

GLMadsen:gb LJCallan a /7 /87 l'2d?/87 8712110206 071208 /N PDR ADOCK 050

\\ __-

_ _ _ _ _ -. - _ _ _ _ _ _ _ _ _ _ _ _, y - - ,, , GULF STATES UTILITIES COMPANY November 16, 1987 RBG - 26995 File Nos. G9.5, G15.4.1

-- U.S. Nuclear Regulatory Commission . Document Control Desk ' l Washington, D.C. 20555 W 20SW ' , Gentlemen: a y

River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-458/ Report 87-24 This letter responds to the Notice of Violation contained in NRC Inspection Report No. 50-458/87-24. The inspection was performed by Messrs. Chamberlain, Jones, and Jaudon during the period of September 16-30, 1987 on activities authorized by NRC Operating License NPF-47 i for River Bend Station Unit No. 1.

Notice of Violation 458/8724-01 ' l corrective action was fully described in the inspection report and no written response was required.

Gulf States Utilities Company's (GSU) response to Notice of Violation 458/8724-02, " Failure to Utilize Proper Revision of Surveillance Test Procedure," is provided in the enclosed attachment pursuant to 10CFR2.201. This completes GSU's response to this item.

i

Sincerely, J. C. Deddene Senior Vice President River Bend Nuclear Croup JCD/E h cc: U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Resident Inspector , P.O. Box 1051 j St. Francisville, LA 70775 f h - N Y' 0 Y 2 N(p.

- _ _ _ _ __ _ ,

_ _ _ _ _ _ - _ _ - - _ _ _ ,.,,g.

, I l ' t UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION STATE OF LOUISIANA ) PARISH OF WEST FELICIANA ) In the Matter of ) Docket No. 50-458

50-459 GULF STATES UTILITIES COMPANY )

1 (River Dend Station, Unit 1) . i AFFIDAVIT J.

C.

Deddens, being duly sworn, states that he is a l Senior Vice President of Gulf States Utilities Company; that i he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.

. /t / W J. CfDeddens Subscribed and sworn to before me, a Notary Public in and for the State and Parish above named, this [[, N day of O {/ P/M be r-19 h9.

, . M . ht A s.

f,4oan W. Middlebrooks Notary Public in and for West Feliciana Parish, Louisiana My Commission is for Life.

_ _ _ _ _ _ _ _ _ _ _ _ - _ _

. _.

-_____

l f

, I l ATTACHMENT g Response To Notice of Violation 50-458/8724-02 Level IV i REFERENCE: l Notice of Violation - letter from L. J. Callan to J.

C.

Deddens, dated ' October 15, 1987.

VIOLATION: Failure to Utilize Proper Revision of Surveillance Test Procedure - Technical Specification 6.8.1.g requires that written procedures be established, implemented and maintained for activities implementing the fire protection program.

Administrative Procedure (ADM)-0015, " Station Surveillance Test Program," requires than an individual assigned to perform a surveillance test utilize an official work copy of the latest test revision of the surveillance test procedure (STP) and any associated temporary change notices.

Contruy to the above, STP-000-3001, " Daily Fire Door Position Check," performed on September 20, 1987, and September 22, 1987, did not utilize the latest revision of the STP which was available from station document control on August 27, 1987.

REASON FOR THE VIOLATION: In August 1987, Security Compliance personnel picked up several work copies of STP-000-3001, " Daily Fire Door Position Check", from Plant Document Control.

On September 20 and again on September 22, the individuals failed to verify that they had the latest revision to STP-000-3001, Revision 2, dated August 27, 1987 and proceeded to conduct the surveillance tests using the out-of-date August 26, 1987 STP.

Failure to follow procedure was a personnel error which has been isolated and corrected as described.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED: On September 25, 1987, when the use of an incorrect procedure was identified, all work copies of STP-000-3001 maintained at the Security Compliance Section weie immediately destroyed.

Security Compliance personnel are required to obtain an official work copy of the STP from Plant Document Control on the day the surveillance test is to be performed with no exceptions.

Security personnel have been re-instructed, pursuant to ADM-0015, to verify with document control or the Station Operating Manual (SOM) Index maintained in the Control Room that the documents to be used are current prior to performing the work.

_ _ _ _ _ - _ _ _ _ _ _ __

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ __

. ' s '\\,' ' ' % A review was performed of STP documentation completed within the last six months and no. similar occurrences were identified prior to August 27, 1987. GSU has determined this use of an incorrect revision from August 27 to September 24, 1987, to be an isolated case.

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS: In addition to steps taken as listed above, Plant Security has'been placed on Document Control distribution list to receive copies of Temporary Change Notices and Procedure Changes. This along with above mentioned personnel training should prevent recurrence of the oversight.

DATE WHEN FULL' COMPLIANCE WILL BE ACHIEVED: Compliance to Procedure STP-000-3001 has been fully achieved.

I l l ! I

l i ! l l l ~^^ .a }}