Insp Rept 50-458/87-19 on 870803-07.No Violations or Deviations Noted.Major Areas Inspected:Actions Re IE Bulletin 85-003,IE Info Notice 86-029 & Previously Identified Findings in Insp Rept 50-458/86-19
ML20238D693
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/03/1987
From: Ireland R, Norman D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20238D685 List:
References
50-458-87-19, IEB-85-003, IEB-85-3, IEIN-86-029, IEIN-86-29, NUDOCS 8709110333
Download: ML20238D693 (5)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ - _ _ _ _ -_-__-___ ____

.....-

APPENDIX-U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-458/87-19 License: NPF-47 Docket: 50-458 Licensee:

GulfStatesUtilities(GSU)

P. O. Box 220 St. Francisville, Louisiana 77704 Facility Name: RiverBendStation(RBS), Unit 1 Inspection At: St. Francisville, Louisiana Inspection Conducted: August 3-7, 1987 Inspector:

[g, Mww_

9/2//7-D. E. Norman, E_ actor I.nspector, Engineering Section Date'

Reactor Safety Branch Approved:

Ib [,4,,/

_

Date '

9/$d/

R. E. Ireland, Chief. Engineering Section, Reactor Safety Branch Inspection Summary n

Inspection Conducted August 3-7, 1987 (Report 50-458/87-19)

Areas Inspected:

Routine, unannounced inspection of actions related to IE ETTetin (IEB) 85-03, IE Notice (IEN) 86-29, and previously identified findings identified in NRC Inspection Report 50-458/86-19.

Results: Within the areas inspected, no violations or deviations were identiTied.

,

I l

8709110333 070909 PDR ADOCK 05000459 G

PDR

_ - _ _ - _ _.

e.

  1. .

..

,

l g

i DETAILS

'.1.

Persons Contacted Gulf States Utilities (GSU)

  • R. J. King, Supervisor, Nuclear Licensing
  • J. H. McQuirter, Licensing Engineer
  • H. F. Roark, Supervisor,' Electrical Maintenance
  • J. Hamilton, Director, Design Engineering

!

  • A. S. Soni, Supervisor, EQ and Specifications
  • J. Mead,. Senior Electrical Engineer
  • P. E. Freehill, Outage Manager A. Kugler,' Process Systems B. E. Hey, Nuclear Engineer M. Henkel, Corporate Licensing Engineer NRC l
  • D. D. Chamberlain, Senior Resident Inspector W. B. Jones, Resident Inspector
  • Denotes those present during the exit interview on August 7,1987.

-2.

Inspection Summary a.

IEB85-03(0 pen)

IEB 85-03, " Motor Operated Valve Common Mode Failure During Plant Transients Due to Improper Switch Settings," was issued as a result of several events during which motor operated valves (MOVs) failed on demand due to improper switch settings. The Bulletin requested that MOVs in certain systems be tested for operational readiness, and that licensees develop and implement a program to ensure that valve operator switches are selected, set, and maintained properly to accommodate maximum differential pressure expected during both opening and closing of the valve for both normal and abnormal events within the design basis.

The licensee made submittals requested by the Bulletin to the NRC on May 14 and October 2,1986.

l This inspection was performed to followup on the licensee's j

activities taken in response to IEB 85-03 and commitments made by the licensee in submittals regarding the Bulletin. The status of the-licensee's program was as follows:

(1) Item e, of the Bulletin, which required a report of the design basis review of applicable valves and a program and schedule for completion of the program, was presented by the licensee in i

+

. _ _ _ _ _ _ - - _ _ -

g; w-

't

,

,

, Sam.;

.

<

,

m

,

,

,,

'E

-

h >!

'

t

, '.'

43'

ii

,

'

')

d

,

,

V e

'

u the May '14 and October; 2,1986, submittals.. Program completion

'

'is scheduled for November 15e1987, and docume'ntation:of final,

results is to be presented within 60 days'~after program

~

/

completion.

,

,

,

(2) ' Establishment of Lswitch settings ~ required by item b. of.the

,

.-Bulletin, is' presently being done based on.the-revised Delta P

'

>

>

values presented in the October 2, 1986, submittal.

The: settings will be incorporated into work packages to be used s

'

while adjusting valve operator switches in accordance with item c. of the Bulletin. 'It presently appears that operability

_j of all valves cannot be demonstrated at the design' basis Delta P; therefore, the licensee must justify an alternate.

>

method of meeting that requirement, y

'

_ 3). Item d. of the Bulletin requires that the' licensee prepare (

procedures wh.ich incorporate details of initial switch settings and to ensure maintenance of correct switch settings throughout -

plarit life. The licensee has just recently selected a

'

,

contractor to perform ' valve testing; therefore, testing procedures had not been completed at_the time of the NRC

'

inspection.

Several maintenance-related valve operator procedures were reviewed by 'the NRC inspector.. Station

'

operating' Procedure CMP-1253, "Limitorque Motor 0perated Valves"-

presented instructions for the inspection and setting of switches for all Limitorque valve operators at RBS'and was being revisedLat the time of this insaection..The procedure will be utilized,-in conjunction with t1e testing procedure, for settingt valve operator switches at RBS.

This item will.emain open pending NRC review during a future inspection,

'

b.

-IEN86-29(Closed)

'l IEN 86-29, " Effects of Changing Valve Motor Operator Switch Settings," was provided as an alert that setting torque bypass

<

switches to meet requirements of IE8 85-03 could affect valve

,

position indication and signals such as "permissives" to other l

equipment. The problem occurs when the torque bypass switch and valve position indicators share the same limit switch rotor.

~

Therefore, when the-position of the rotor.is changed to adjust the

_

range of the torque bypass switch, the closed position indication is

,

also changed. The licensee has reviewed all valves and, when necessary, changed wiring so that the torqce bypass switch and position. indicators are on separate rotors.

This item is closed.

i i

'I

_ - - _ - _ - _ - - - - _ _ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _. _ _ _ - _ _ _ - -

p 74_

,

,

,

x

.

e s; >. i,

. f il

'

'

,

14.'

-

V

'

'

yg

7

c.

Previously Identified Inspection Findings

,

.

v

.(1)

(Closed) Deviation 458/8619-01 q

.Thisleviation was written as a result of the licensee's failure-

' '

i

^

'to comply with commitments in the RBS! Equipment Qualification -(EQ) Document,in the following areas:

,

(a) iThe master' 11st' and system component evaluation work -(SCEW) 4'

,

sheets listed-12 model SMC-Limitorque v'alve' operators which

had not been qualified for a harsh environment.

.(b) SCEW sheets did not' reference qualification test reports for ' control wiring which had been installed in Limitorque valve operators.

The following corrective action taken by the-licensee was~

verified by the NRC. inspector during this inspection:

l The master list had been revised to show SMB operators,-

..

which.are qualified, in place'of the SMC operators.

.

SCEW sheets had been. updated to show test reports which l

.

supported qualification'of control wiring in Limitorque q

operators.

>

.

Procedures had been revised and were in place to implement.

.

..

E the ons.ite EQ program including review and formal update of SCEW' sheets, master lists', and qualification reports..

]

q

,

This item is closed.

,

(2)

(Closed) Unresolved Item 458/8619-02-During the previous inspection, Franklin Report F-C4033-1, which j

was the licensee's basis for. qualification of Raychem wiring l

'

inside Limitorque valve operators, was reviewed by the NRC inspector. The report did not stand alone in supporting qualification of the wire at the RBS environment;-therefore, additional information was necessary to' support qualification.

J n.

During this inspection, the NRC inspector reviewed

'

' '

calculation EQS-041 which, together with the Franklin report and j

~

other Raychem data, supported qualification of the wiring.

]

!

This item is closed.

(3)

(Closed) Potential Violation 458/8619-03/04 An NRC walkdown inspection of eight Limitorque valve operators i

resulted in identification of unqualified contral wiring in two i

l

'

ot L__ _

-.

_z___._

_

_

_

________u

g

. m-

.,

,

p T

.,

.

3.;

,,

>@

.i (gJE..-

,i

.

&q1

=

<

'

.

-

,

>

,

u

,

It operators..As a result of this finding the licensee performed.

'

L an audit at Limitorque at which time documentation for 72 RBS operators was found adequate but was found tonba inadequate for the. remaining 77 operators. The 77 operators with inadequate.

[

occumentation were subsequently inspected by the licer.see,.and l-unqualified wires were< replaced in 11 operators.

Eighteenkof

- the operators which had adequate 7 documentation were also

'6 inspected and~found acceptable. The remaining 54 operators,

f'

which had ade9wte documentation, were inspected in Octobef 1988,3 and two unqualified wires were replaced in one operator.

-

+

'

<

,,

J#1985, the licensee discovered'urrual'f fed wires in a sp6r,e,1 cperator, and at the the, inspected the 50 operators insida

' containment and 19 outside containment' which were suspecte[,)to

'

have unqualified wires. All Limitorque valve operators at RBS have been inspected and corrected as required.

The actions

taken by GSU indicate that the licensee did take timely and appropriate action to identify and correct the Limitorque wiring problem based on the knowledge of the problem at the time.

.This item is closed.

3. -

Exit 7.nterview An exit interview was conducted on August 7, 1987, during which time results of the inspection were reviewed with members of the GSU staff.

,

!

.

l

,

!

.

.

t

_ _ _ _ _ _

-. -,,, -, - -. - -, -,

W

.1,

'

t i

{., '

i

"t

r

,

c,

. <,

,

.~ w

...

.

ir

!

'

'

)

,;,. s,,

i r'

<-;

s,:y.

)d,a

>

..

'#

I fe 4 '

h-J l

'

!

.i

'}

,

I

h

~hf

't : s r y a

'

';

(/)

.

i g 4

,u,

..

s.

,

i i.

m o

O

-

,

-

f -

g

.Z gn:

'

p. LA

'g

^

I 1-

,.,

,

g== l y q i

.,-

=

_/

,

5-

,

-

,

.

t

,

'

'

' =

~ --

u,

,

,

~

-

,

'

.t I

.r e

'

,g I

, L 'i 3 (

'

t i

i

,

\\

i

\\

r i6

'

,! y

.' h '

'

g l

!

l,

l l

l i

l l

l l

\\