IR 05000454-04-003(DRS), IR 05000455-04-003(DRS); on 01/26/2004 - 01/30/2004; Byron Station, Units 1 and 2; Routine Baseline Inspection Report
ML040480210
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/17/2004
From: Julio Lara
NRC/RGN-III/DRS/EEB
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-04-003
Download: ML040480210 (16)


Text

ary 17, 2004

SUBJECT:

BYRON STATION, UNITS 1 AND 2 NRC EVALUATIONS OF CHANGES, EXPERIMENTS, OR TESTS AND PERMANENT PLANT MODIFICATIONS INSPECTION REPORT 05000454/2004003(DRS); 05000455/2004003(DRS)

Dear Mr. Crane:

On January 30, 2004, the Nuclear Regulatory Commission (NRC) completed a routine baseline inspection at your Byron Station, Units 1 and 2. The enclosed report documents the inspection findings, which were discussed on January 30, 2004, with Mr. S. Kuczynski and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

Specifically, this inspection focused on the baseline biennial inspections for evaluations of changes, tests, or experiments (10 CFR 50.59) and permanent plant modifications. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Enclosure: Inspection Report 05000454/2004003(DRS);

05000455/2004003(DRS)

See Attached Distribution

SUMMARY OF FINDINGS

IR 05000454/2004003(DRS), 05000455/2004003(DRS); on 01/26/2004 - 01/30/2004; Byron

Station, Units 1 and 2; Routine Baseline Inspection Report.

This report covers a five day period of announced baseline inspection on evaluations of changes, tests, or experiments and permanent plant modifications. The inspection was conducted by Region III inspectors. No findings of significance were identified.

A. Inspector-Identified and Self-Revealed Findings Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity No findings of significance were identified.

Licensee-Identified Violations

No findings of significance were identified.

REPORT DETAILS

Summary of Plant Status

Units 1 and 2 were operated at or near full power throughout the inspection period.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R02 Evaluations of Changes, Tests, or Experiments

.1 Review of 10 CFR 50.59 Evaluations and Screenings for Changes, Tests, or

Experiments

a. Inspection Scope

The inspectors reviewed ten evaluations performed pursuant to 10 CFR 50.59. The evaluations related to permanent plant modifications, set-point changes, procedure changes, conditions adverse to quality, and changes to the updated final safety analysis report. The inspectors reviewed the evaluations to verify that the evaluations were thorough and that prior NRC approval was obtained as appropriate. The inspectors also reviewed fifteen screenings where the licensee had determined that a 10 CFR 50.59 evaluation was not necessary. In regard to the changes reviewed where no 10 CFR 50.59 evaluation was performed, the inspectors verified that the changes did not meet the threshold to require a 10 CFR 50.59 evaluation. These evaluations and screenings were chosen based on risk significance of samples from the different cornerstones.

b. Findings

No findings of significance were identified.

1R17 Permanent Plant Modifications

.1 Review of Recent Permanent Plant Modifications

a. Inspection Scope

The inspectors reviewed eleven permanent plant modifications that were installed in the last two years. The modifications were chosen based upon their affecting systems that had high probabilistic risk analysis (PRA) significance in the licensees Individual Plant Evaluation (IPE) or high maintenance rule safety significance. The inspectors reviewed the modifications to verify that the completed design changes were in accordance with the specified design requirements and the licensing bases and to confirm that the changes did not affect any systems safety function. Design and post-modification testing aspects were reviewed to ensure the functionality of the modification, its associated system, and any support systems. The inspectors also reviewed the modifications performed to verify the modification did not place the plant in an increased risk configuration.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES (OA)

4OA2 Identification and Resolution of Problems

.1 Routine Review of Condition Reports

a. Inspection Scope

The inspectors reviewed a selected sample of condition reports associated with Byron Station permanent plant modifications and concerning 10 CFR 50.59 evaluations and screenings. The inspectors reviewed these issues to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions. In addition, condition reports written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the corrective action system. The specific corrective action documents that were sampled and reviewed by the team are listed in the attachment to this report.

b. Findings

No findings of significance were identified.

4OA6 Meetings

.1 Exit Meeting

The inspectors presented the inspection results to Mr. S. Kuczynski and other members of licensee management at the conclusion of the inspection on January 30, 2004. The licensee acknowledged the findings presented. No proprietary information was identified.

.2 Interim Exit Meetings

No interim exits were conducted.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Exelon Nuclear, LLC

S. Kuczynski, Byron Site VP
D. Hoots, Byron Plant Manager
B. Grundmann, Byron Reg. Assurance Manager
D. Thompson, Byron RP
B. Adams, Byron Engineering Manager
S. Stimac, Byron Operations Manager
K. Hansing, Byron Nuclear Oversight Manager
D. Drawbaugh, Byron Reg. Assurance
E. Blondin, Byron Engineering
J. Gluck, Byron Procurement Engineering
V. Naschanski, Byron Engineering
E. Hernandez, Byron Maintenance
D. Spitzer, Byron Engineering
P. Adams, Byron Ops Training Manager

Nuclear Regulatory Commission

R. Skokowski, Senior Resident Inspector
P. Snyder, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None.

Closed

None.

Discussed

None.

Attachment

LIST OF DOCUMENTS REVIEWED