Insp Rept 50-425/87-39 on 870914-1022.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Containment & safety-related Structures & Components, Auxiliary Sys,Electrical Equipment & Raceways
ML20236M756
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/02/1987
From: Livermore H, Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20236M634 List:
References
50-425-87-39, NUDOCS 8711130272
Download: ML20236M756 (10)


Text

,

.

.

-

-,_.

. _.

_ _, -.

,,

.i :. s

,1

>',.3-

'

h Rfof

..

.

,, UNITEQ. STATES '

'

D I WUCLEAR REGULATORY COMMISSION;

>

".

.-

o

.- p '

n 3-

~ REGION ll-1

"

.,

g-rj~

,101 MARIETTA STREET, N.W.

.

, * ' -

.e 9 <1

. ATLANTA, GEORGI A 30323

'

/

%, y. _

'

c f)

Report flo.: 50-425/87-39-

.,

,

,

Licensee:. Georgia-Pow & Company P. 0.: Box 4 45

  1. -

Atlant.a. GIO 30302 l

Docket Noh 50-425.

Construction Permit No.:

CPPR-109 Facility Name: Vogtle Unit 2

,

.

Inspection Conducted: September 14;- October 22, l'987

..

Inspector:

ML /) NaMM

/6/24[# 7 " '

g. H. Livermore, Senior.R sident.

Date Signed, e

,

Inspector, Con truction

,

Approved by:

'lof1-h

__

_

M. V. SinkuTe, Section Chief

'

.Dalte Signed:

Division of Reactor. Projects j

SUMMARY-

'

Scope:

This routine, unannounced! inspection entailed residdnt inspectionfin'-

j the following areas:

fire protection, containment and safety related a

structures, safety related c'omponents, auxiliary systems, and' electrical equipment, raceways and instrumentation..

Results: No> violations or deviations were identifieil.

,

h a

-

l

e

'

%

.

8711130272 871102 PDR ADDCK 05000425

.PDR

<

g m

-

3.j

,

i

,f

.;o

,

,.

'?q

'

' '

(

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • P. D. Rice, Vice-President, Vogtle Project Director R. H. Pinson, Vice-President, Project Construction C. W. Whitney, General Manager, Project Support
  • C. W. Hayes, Vogtle Quality Assurance Manager
  • E. D. Groover, Quality Assurance Site Manager - Construction D. M. Fiquett, Project Construction Manager - Unit 2
  • G. A. McCarley, Project Compliance Coordinator H. M. Handfinger, Project Start-up Support Manager F. D. Kuester, Project Field Engineering

..

!

J. A. Bailey, Project Licensing Manager A. W. Harrelson, Construction Electrical Manager C. W. Rau, Construction Mechanical Manager L. N. Brooks, Construction Civil Manager L. B. Glenn, QC Manager R. W. McManus, Readiness Review Manager J, E. Sanders, Asst. Project Manager W. C. Ramsey, Project Engineering Manager L. D. Harless, Manager, Quality Concerns R. Folker, Quality Assurance Engineer Other licensee employees contacted included craftsmen, technicians, supervision, engineers, inspectors, and office personnel.

Other Organizations

'

D. L. Kinnsch, Project Engineering - Bechtel B. Edwards, Site Manager, PPP

  • Attended Exit Interview 2.

Exit Interviews - Unit 2(30703C)

The inspection scope and findings were summarized on October 22, 1987 with those persons indicated in paragraph 1 above. The inspector described-the areas inspected and discussed in detail the inspection results.

No dissenting comments were received from the licensee.

The licensee did not identify as proprietary any of the materials. provided to or reviewed-by the-inspector during this inspection.

Region based NRC exit interviews were attended during the inspection period by a resident inspector.

3.

Licensee Action on Previous Enforcement Matters - Unit 2 (92702)

Not inspected.

_-

- - _ _ _ _ - _ _ _

_ _ _ -

j

.

s i

d 4.

Unresolved Items - Unit 2 (92701)

Unresolved items are matters about which more information is required to j

!

determine whether they are acceptable or may involve violations or deviations.

No unresolved items were identified during this inspection period.

5.

General Construction Inspection - Unit 2 (92706)

j i

Periodic random surveillance inspections were made throughout this j

reporting period in the form of genera', type inspections in different

]

areas of the facility.

The areas were selected on the basis of the j

scheduled activities and were varied to provide wide coverage.

j Observations were made of activities in progress to note defective items

or items of noncompliance with the required codes and regulatory requirements. On these inspections, particular note was made of the i

presence of quality control inspectors, supervisors, and quality control i

evidence. in the form of available process sheets, drawings, material

identification, material protection, performance of tests, and

,

'l housekeeping. Interviews were conducted with craft personnel, supervisors, coordinators, qua'lity control inspectors, and others.as they_ were available in the work areas.

The inspector reviewed numerous construction.

deviation reports to determine if requirements were met in the areas of

,

documentation, action to resolve, justification, and approval signatures in accordance with GPC Field Procedure No GD-T-01.

,

No violations or deviations were identified, j

6.

Fire Prevention / Protection and Housekeeping Measures - Unit 2(42051C)

The inspector observed fire pievention/ protection measures throughout the inspection period.

Welders were using welding nermits with fire watches and extinguishers.

Fire fighting equipment was in its designated areas.

throughout the plant.

The inspector reviewed and examined portions of procedures pertaining to the fire prevention / protection measures and housekeeping measures to determine whether they comply with applicable codes,. standards, NRC Regulatory Guides and licensee commitments.

The inspector observed fire prevention / protection measures in work areas

containing safety related equipment during the inspection period to verify the following:

-

Combustible waste material and rubbish was removed ' from the work

areas as rapidly as practicable to avoid unnecessary accumulation of

'

combustibles.

Flammable liquids were stored in appropriate containers and in

-

designated areas throughout the plant.

l w___________

_ _ _ _ _ _ _ _ _ _ -.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ -. - -

__a

__

.

.

,

...

4]

.

a f

,

3l

.

,

-(

Cutting and welding' operations in progress have been authorized byjan~

j

-

appropriate permit, combustibles have been. moved = away ~or ' safely:

'

covered, and a fire watch and extinguisher was posted astrequired.

Fire protection / suppression equipment was provided and ' controlled in

-

accordance with applicable requirements.

a No violations:or deviations were identified.

7.

Containment (Steel' Structures and Supports)'

Unit 2'(48053C)-

-

Periodic inspections were conducted to' observe' containment' steeliand -

support installation activities in progress, to verify the following:-

Components were being properly. handled (included ' bendin'g' or -

j

-

i straightening).

_

,.

Specified clearances were being maintained.

O

-

,

Edge finishes and hole sizes were within tolerances.

-

Control, marking, protection and segregation were maintained during i

-

storage.

Fit-up/ alignment meets the tolerances in the specifications and -

.1

-

drawings.

'

l l 'l No violations or deviations were identified.

j

8.

Safety-Related Structures (Structural Steel and Supports). - Unit 2 j

(48063C)

j i

L Periodic inspections were conducted to observe construction activities of l

safety-related structures / equipment supports for major equipment outside.

the containment to-verify that:-

<

b Materials and components were being properly-handled to, prevent

-

damage.

Fit-up/ alignment were within tolerances;in specifications and drawing-

-

requirements.

Bolting was in accordance with specifications.and procedures.

-

Specified clearances from adjacent components were being met.

-

No-violations or deviations were identified.

I I

l

_

.

,

4

,

?

9.

Reactor Vessel, Integrated Head Package, and Internals - Unit 2 (50053C)

(50063C)

The inspection consisted of examinations of the Reactor Vessel installed in containment, the Reactor Vessel head with the installed control rod drive mechanisms that are located on the refueling floor, and -the upper internals in their designated laydown area.

Inspections ~also determined that proper storage protection practices were in place and that entry of foreign objects and debris was prevented. During this inspection period, the inspector also monitored a fit check installation of the reactor vessel head and the reactor vessel.

No violations or deviations were identified.

10.

Safety Related Components - Unit 2 (50073C)

.

The inspection consisted of plant tours to observe storage, handling, and

,

protection; installation; and preventive maintenance of safety-related components to determine that work is being performed in.accordance with applicable codes, NRC Regulatory Guides, and licensee commitments.

During the inspection the below listed areas were randomly inspected at various times during the inspection period to verify the following as applicable:

Storage, environment, and protection of components were in accordance

-

with manufacturer's instructions and/or established procedures.

-

Implementation of special storage and maintenance requirements such as:

rotation of motors, pumps, lubrication, insulation testing (electrical), cleanliness,etc.

-

Performance of licensee / contractor surveillance activities and documentation thereof was being accomplished.

'

Installation requirements were met such as: proper location,.

-

placement, orientation, alignment, mounting (torquing of bolts and expansion anchors), flow direction, tolerances, and expansion clearance.

Appropriate stamps, tags, markings, etc. were -in use to prevent

-

oversight of required inspections, completion of tests, acceptance, and the prevention of inadvertent operation.

Safety-Related piping, valves, pumps, heat exchangers, and instrumentation were inspected on a random samplir.g basis throughout.the plant.

No violations or deviations were identified.

,

i f

- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _._.

a

q l-

,

i.

>

l 5.

.

,

11. - Safety Related Pipe. Support and Restraint' Systems -LUnit 2.(50090C)-

.

.

Periodic random inspections were conducted during the inspection period to observe construction activities during installation of safety-related pipe" supports to determine that the following work was performed'in accordance

'

with applicable codes, NRC Regulatory Guides,' and licensee comitments:

,

Spring hangers were'provided with indicators to show the'.approxim?te

-

" hot" or " cold": position, as appropriate.

,j No deformation or forced bending was, evident.

l

-

Where pipe clamps are'used to support vertical lines,- shear lugs were:

'

-

welded to the pipe (if required by Installation Drawings) to prevent i

'

slippage.

l Sliding or rolling ' supports were provided with-material and/or

-

lubricants suitable for the. environment and compatible.with -sliding?

contact surfaces.

-

Supports are located and installed as specified.

The surface of welds meet-applicable code requirements and. are free

-

from unacceptable grooves, abrupt ridges, valleys, undercuts,' cracks,-

discontinuities,' or other. indications which can be observed'on the; welded surface.

t No violations or deviations were identified.

12.

Electrical and Instrumentation Components and Systems: - Unit 2 - (5105' 3C)

l (52153C)

Periodic inspections were conducted during the inspection period!to.

,1 observe safety-related electrical equipment in order to'. verify that the-storage, installation, and preventive maintenance 'was accomplished _in accordance with applicable codes, NRC Regulatory Guides,. and licensee

.

commitments.

During the inspection period inspections were performed on various pieces of electrical equipment during storage. installation, and cable terminating phase in order to verify.the.following as applicable:

Location and alignment

-

Type and size of anchor bolts

-

Identification'

-

. Segregation and identification of nonconforming items

-

i Location, separation and redundancy rec,uirements

-

..

--a-aua

-,.

..

. _.

.

...

-

'l

,

.

i 6$

,

...

e

,,

Equipment space heating

-

-

Cable identification -

Y

Proper lugs used-

-

Conditionofwire(not' nicked,etc.),.tightnessofconnection

-

Bending radius'not exceeded

!

--

Cable entry to terminal point'

-

S'eparation

.I

-

No violations or deviations'were identified.

13.

Electrical-and Instrumentation Cables and-Terminations '- Unit. 2 [(51063C)'.

i (52063C) (53053C).

.

a.

Raceway / Cable. Installation-The inspector reviewed and-examined p'ortions of-the : following.

i procedures pertaining 'to ; raceway / cable 1 installation 1to ' determine:

..

whether they comply with applicable codes', NRC Regulatory Guides and '

licensee commitments.

'

!

.

-ED-T-02, Raceway Installation-ED-T-07, Cable Installation j

Periodic inspections.were '. conducted. to E observe construction ;

'

'

,

activities of Safety Related Raceway / Cable) Installation.

In reference to the raceway installation, the following areas were inspected to verify compliance with the applicable requirements:

,;j Identification

-

'l

-

Alignment Bushings (Conduit)

-

'

Grounding

-

-.

Supports and Anchorages In' reference t'o the cable -installation the following1a'reas were :

~

inspected to verify. compliance.with thel applicable requirements:-

H

,

Protectionfromadjacentconstructionactivities(welding,etc.)

-

Coilsd cable ends properly secured

-

..

s

-

-._

.-...._-_E._-

_,

,

+.<

!

.,'

7-

.

i

-

i

..i Non-terminated cable ends tapedi j

-

,

Cable trays,; junction' boxes, etc.,. reasonably' free of. debris

-

Conduit capped, i.f no cable' installed.

-

Cable supported

-

Bend radius not exceeded

"

-

,

Separation

-

b.

Cable Terminations

.1

' The inspector reviewed. and examined ' portions 'of. the fol_ lowing..

j procedures pertaining _to cable termination to determine whether. they'

i comply with ' applicable codes, NRC Regulatory Guides andilicensee
i

commitments.

<

<J-ED-T-08, Cable ~ Termination

'

In reference.to cable' terminations the'following areas were inspectedL to verify compliance with the applicable requirements..

-

Cable identification.

.

Proper lugs used

-

Condition of wire (not. nicked, etc.).

-

Tightness of connection-

-

Bending radius not exceeded

-

Cable entry to terminalL point:

-

!

Separation

-

No violations or deviations were identified.

f

,

14.

Containment and Other Safety Related-Structural Steel. Weldingi-Unit 2 (55053C) (55063C)

Periodic inspections' were ' conducted during. daily ~ plant surveillance.on'

safety-related steel welding. at.various ! stages of weld completion.

The' purpose of the inspection was to determine ~whether the requirements of

[

applicable' specifications, codes, standards, work performance procedures

'

}

and'QC' procedures are being met as follows:',

l Work was conducted in accordance with 'aKprocess sheet lo'r ' drawing'

>

-

,

which ' identifies -the weld and 'its clocation - by system, references,;

procedures or'. instructions, and 'provides-for.; production and/or-QC i

.signoffs.

R u

b

- - - - _ _ _ _ - - _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _

-_

'

.

q-8

.

,

.-

Welding procedures, detailed drawings and instructions, were readily.

-

availab1_e in the immediate work area and technically-adequate for the welds being made.

Welding procedure specification _ (WPS) were in accordance' with.the

-

applicable Code requirements and that a Procedure Qualification l --

Record (PQR) is referenced and exists for the type of weld being, made.

Base metals and welding filler materials were-of the specified. type

-

and grade, were properly inspected, tested, and were tra'ceable.

Protection was provided to' shield the welding operation.from adverse-

-

environmental conditions.

L

.

Weld joint geometry including thickness was '.specified. and that l

-

surfaces to be welded were prepared, cleaned and inspected in

_

accordance with. applicable procedures or. instructions.

l A sufficient number of adequately qualified.QA and-QC inspection

-

personnel commensurate with the work in progress were present at.the work site.

Weld area cleanliness was maintained and/that ' alignment and fit-up;

~

-

,

tolerances were within specified limits.

'

j

Weld filler material being used was in. accordance with ' welding-

'

-

specifications, unused filler material was separated from other types-of material. and was stored and controlled properly, and stubs lwere properly removed from the work location.

.j There were no visual signs of cracks,. excessive heat input. o'r'

-

excessive crown on welds.

.

-Welders were qualified to the particular process.and thick'ess; and.

n

-

,

that necessary controls and records were in place.-

!

No violations or deviations were identified,

.]

15.

IE Bulletin Followup (92703)

(Closed) 50-424 & 50-425/86-BU-03 " Potential Failure of Multiple Emergency Core Cooling System- (ECCS) Pumps Due.to Single Failure of Air Operated L.

Valve in Minimum Flow Recirculation 1.ine".

The licensee responded.to this.

L bulletin in a ' letter dated November 11,L1986: and stated that they had'

!

evaluated the bulletin to determine whether'a single-failure vulnerability

'

exists in the minimum. flow recirculation linet of any ECCS pump that;could.-'

cause' a failure of -more than.one ECCS. train. : Their evaluation' has concludedithat the concerns of-the bulletin are not applicable to this

. The only ECCS components. that share. commonEminimum' flow i

facility.

recirculation lines and/or valves are the Safety Injection. System (SIS)'

'

U

,

,

l

l.

'

1-- _. _]

L_____________

_i__ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ - _ _ _ _ _ _ - _ _ _ _

- - _. _ _ - - - -

-

_m-

.

.-

_,

and the Chemical Volume and Control System (CVCS).

The SIS has miniflow-return lines to the Refueling Water 3torage Tank (RWST). The lines become common after the pressure breakdown orifices for each pump.

The-incividual portions of the miniflow lines contain an isolation valve each, and the common portion contains a single valve.

All of these valves are motor operated and as such are fail-as-is upon loss of control circuitry or power.

The CVCS minimum recirculation normal flow paths connect to a common line that contains a single motor operated isolation valve that is also fail-as-is upon loss of power.

On a safety injection signal, the CVCS pump miniflow paths automatically align to alternate miniflow paths which have no common valves.

Based on an in-office review by the Region II inspectors this. item is closed. Closure for unit 1 is via report 50-424/87-56.