Text
.
'
urn,q'q,
,
+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
,
o g,
c REGION 11 e'[
101 MARIETTA ST., N.W., SUITE 3100 o,
ATLANTA, GEORGIA 30303
'
Report Nos. 50-369/81-19 and 50-370/81-08 Licensee:
Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: McGuire Docket Nos. 50-369 and 50-370 License Nos. CPPR-83 and CPPR-84 Inspecti;n at M e ite ear Charlotte, North Carolina
,
Inspecto 2
[
/
7 [' 8/
L. D. Za ' c 04te/ Signed
!
8!
7/8/8/
Approved by:
A. R. Herdt, Section Chief
'
Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on June 15 - 18, 1981'
Areas Inspected This routine, unannounced inspection involved 32 inspector-hours onsite in the areas of QA records for reactor coolant pressure boundary piping welds (Unit 2);
and safety-relcted piping components (Unit 2); Review of radiographic films for reactor coolant pressure boundary piping welds (Unit 2); Followup of previous inspector identified items (Unit 2); and Followup of' licensee identified items (Unit 1).
Results Of the five areas inspected, no violations or deviations were identified.
.
,
.
9108040437 810710 DR ADOCK 05000
-
-
-
.
.
.
..
.
..
REPORT DETAILS 1.
Persons Contacted f
Licensee Employees
- J. R. Wells, Corporate QA Manager
- M. Starnes, Senior Construction Engineer
- J Willis, Project QA Engineer
.
- G. B. Robinson, QA Engineer
- W. R. Gillespie, Senior QA Technician J. E. Cavender, Level III NDE Examiner S. S. Lefler, Design Engineer r!6[
Other licensee employees contacted included three technicians and three
>
'i
- craftsmen.
,
,
Other Organizations R. J. Patterson, Supervisor NDE, Babcock & Wilcox Construction Co. (B&W)
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on June 18, 1981 with those persons indicated in paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings (Unit 2)
(Closed) Deficiency (370/80-08-03) Failure of Ultrasonic procedures to provide adequate instructions for performing and recording examinations.
Duke Power Company's letter dated August 7, 1980, advised Region II of corrective actions taken. The response is satisfactory and actions have been taken. The inspector reviewed the revised procedures and considers the corrective actions taken to be satisfactory.
(Closed) Unresolved Item (370/80-12-02) Potential inadequate magnetic particle examination.
The individual involved in the unsatisfactory exam-ination was disqualified and re-trained.
The welds involved were. rein-spected by qualified examiners.
In addition, several previous welds, examined by the disqualified individual, were re-examined and found to be satisfactory.
The corrective actions taken are considered to be satisfac-tory.
.
e i
-
,
-
er,..---__.m
-.-,__.-,...--.e,,,
,
, - _.., -,. _..,.
_... - ~.
_
.
-
.
-
-
.
. -
l
--
.
.
.
.
I
!
(Closed) Violation (370/81-02-01) Failure to establish adequate controls for storage of installed equipment. Duke Power Company's letter dated May 12, 1981, advised Region II of corrective actions taken.
The responsa is satisfactory and actions have been taken.
Construction Procedure 861 was i
issued to provide controls concerning installed equipment.
The inspector reviewed this procedure and toured the plant for evidence of enforcement.
No violations were noted. Corrective actions taken are considered to be satisfactory.
(Closed) Unresolved Item (370/81-02-03) Temperature Control of Baking Oven.
The rebaking ovens, that operate at 725 F, now have two independent thermom-eters which provide redundant measurements. All of the portable thermome-
!
ters used in the holding ovens were placed inside one oven and checked for equal measurements.
One thermometer was discarded, others were satis-factory. Corrective actions taken are considered satisfactory.
(
(Closed) Unresolved Item (370/81-02-04) Extraneous markings on safety-
related stainless steel.
The subject marking materials were tested for contaminants and found to be chemically acceptable. The licensee has also
,
l started a program which is intended to eliminate unnecessary markings.
Corrective actions taken are considered satisfactory.
(Closed) Unresolved Item (370/81-06-01) Base metal and adjacent weld defects
'
on radiographic films were not evaluated. The licensee physically sighted several of the components and found that the subject defects had been removed / repaired. Those that could not be sighted were re-evaluated on the i
films and were determined to not affect the integrity of the component.
Penetration 2M262 was evaluated, assuming cracks may exist, and determined by Design Engineering to be acceptable as is. (See memo to file, MG-81-277, dated 6/18/81).
The radiographic records, in each case, were annotated (
accordingly to address the subject defects.
The corrective actions taken are considered satisfactory.
(Closed), Unresolved Item (370/81-06-02), QA records not available for containment penetration alignment.
The inspector reviewed records 'for l
penetration E103 which verified alignment, however, no QA records could be located for access penetration C-152. ~ The licensee stated that alignment.of
!
this penetration can be established by the fact the closure functions properly. The actions taken are considered satisfactory.
l (Closed) Unresolved Item (370/80-08-02) Inadequate certification of visual l
examiners. The inspector reviewed the revised visual examination procedure (ISI-350 Rev.12) and the training program and considers the corrective actions taken to be satisfactory.
y (Closed) I.nfraction (370/80-12-01) Inadequate training / qualification of visual examiners. Part of this infraction was reviewed during a previous i
'
inspection (See report 81-06).
The inspector reviewed the test specimens used for training and qualification and also the practical examination requirements. Corrective actions taken are considered to be satisfactory.
.
L
_ _ _ _.
-. -. _
.
-
- -.
.. -
.
.
.
.
4 4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Review of QA Records (Unit 2)
h
.
l a.
Reactor coolant pressure boundary piping welds The inspector reviewed QA records for the reactor coolant piping welds, listed below, to determine if applicable requirements were met.
Weld Ident Pioe Size & Material NC2FW22-10 10" Stainless Steel NC2FW22-11 10" Stainless Steel NC2FW22-26 6" Stainless Steel NC2FW22-17 14" Stainless Steel
.
NC2F1-2 36" Stainless Steel l
NC2F1-5 31" Stainless Steel The following type records were reviewed:
(1) visual and dimensional inspections (2) weld history (3) nondestructive examinations (4) weld repairs (5) welding materials (6) weld material ce5rtifications
!
(7) welder qualifications (8)
inspector qualifications In addition, curren+ controls for issuing and storing welding materials were reviewed.
No violations or deviations were noted.
i b.
Safety-related piping conponents The inspector reviewed QA records for safety related piping components,
listed below, to determine if applicable requirements were met.
Component Ident.
System Pipe Size & Material
!
Globe Valve DY11-23 Boron Recycle 1" Stainless Steel Globe Valve EE2-6 Reactor Coolant 2" Stainless Steel Globe. Valve CQ3-5 Heat Removal 3/4" Stainless Steel Spool Piece 2 NIP 100 Safety Injection 8" Stainless Steel
'
Elbow Heat #31454 Safety Injection 6" Stainless Steel j
Elbow Heat #ZJ3Y Auxiliary Feedwater 8" Carbon Steel
.
--
_,,e
.c,- - - - - -..,
a-m,.
,, _ _
.-_~,._,._-----._,-,,,,_,c.-,
. -. -
. __ -.,,,
._
_.
._
_.
-
. _. _
...
_ - -
t
.
.
-
.
l l
Elbow Heat #W2854 Auxiliary Feedwater 8" Carbon Steel Elbow Heat #U4FLH1 Containment Spray 8" Stainless Steel Elbow Heat #RW9-41835 Heat Removal 8" Stainless Steel Spool Piece Heat #L01782 Component Cooling 16" Stainless Steel The following type records were reviewed:
i (1) chemical & physical test reports I
(2) nondestructive tests I
(3) vendor certifications
!
(4) QA release forms (5) receipt inspection reports (6) nonconforming material reports (7)
installation records for cleanliness, fitup, welding and nonde-
!
structive examinations (8) qualifications for welders and nondestructive examiners No violations or deviations were noted.
c.
QA Audits The inspector reviewed QA audit and surveillance reports related to reactor coolant piping welds and safety-related components.
.
No violations or deviations were noted.
d.
Nonconformance Reports
!
j The inspector reviewed several noncon.formance reports related to reactor coolant piping welds and safety-related piping components.
'
i No violations or deviations were noted.
6.
Review of Radiolgraphic Films (Unit 2)
l The inspector reviewed radiographic films for reactor coolant piping welds,
,
listed below, to determine if the applicable ASME Code requirements were met.
-
I Weld Ident Pipe Size and Material i
'
NC2FW22-10 10" Stainless Steel i
NC2FW22-11 10" Stainless Steel NC2FW22-17 14" Stainless Steel NC2F1-2 36" Stainless St. eel
NC2F1-5 31" Stainless Steel i
Ne violations or deviations were noted.
'
I
- -.-
-.-,
.-
-
-- -
- - -
.
-
-.
. -.
.. -,. -..
.
___
_
_
_
__.
.
_.
.
.
,
.
i
- ..
!
i
,
7.
Preservice Inspection-Observation of Liquid Penetrant Examination (Unit 2)
i No preservice inspections were performed at McGuire, Unit 2, during this inspection.
The inspector reauested the B&W baseline coordinator to schedule a liquid penetrant examination at the Catawba site on June 19, 1981, during the inspector's visit there. This was done and the inspector observed a baseline liquid penetrant examination of a 4-inch diameter safety-related pipe weld. (See Catawba report 81-13).
No violations or deviations were noted.
8.
Inspector Followup Items (Unit 2)
(Closed) Inspector Followup Item 370/81-02-05, Non-Retrievable NDE Personnel j
Records.
The licensee presented the inspector with appropriate personnel records for review. The records were satisfactory.
l (Closed) Inspector Followup Item 370/81-06-03, Records for administering and for limitations concerning visual acuity are incomplete.
The licensee
modified their reporting form which now requires annotation as to whether corrective lens are required or not. Also, all NDE personnel are being re-examined for visual acuity by a registered nurse. About one-half of the re examinations were complete during this inspection.
Corrective actions
taken are considered to be satisfactory.
9.
Licensee Identified Items [50.55(e)] (Unit 1)
'
(Closed) Item 369/80-10-01, Socket welds do not meet applicable quality
,
standards.
On April 3, 1980, Duke notified Region II of a 50.55(e) item concerning under size socket welds.
The final Construction Deficiency i
Report was submitted on May 2, 1980. The report was reviewed by Region II in February 1981 (See report 81-02) and determined to be unsatisfactory.
The licensee has subsequently conducted a deeper investigation of Unit 1 socket welds and concluded that the small percentage (less than 2%) of under size socke ts in Unit 1 does not warrant any furthe rwork. All under size sockets were in pipe less than 2-inch diameter and were re-welded to provide sufficient weld size. The licensee also advised that the same weld proce-dure was used on all Unit I socket welds, thus supporting their position that the percentage of under size sockets not measured would be less that 2 percent, and those would only be very slightly under size based on the ones detemrined to be under size. Ths corrective actions taken are considered to be satisfactory.
.
'