IE Insp Rept 50-369/81-08 on 810309-12.No Noncompliance Noted.Major Areas Inspected:Surveillance Testing & IE Bulletin & Circular Followup
ML19347E460
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/24/1981
From: Bryant J, Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19347E456 List:
References
50-369-81-08, 50-369-81-8, NUDOCS 8104270412
Download: ML19347E460 (3)


Text

-

,

'

.

nc 4(D o

UNITED STATES

"d.

o',,

8" NUCLEAR REGULATORY COMMISSION o

L'

$

REGION 11 k

101 MARIETTA ST N.W.. SUITE 3100 ATLANTA, GEORGIA 30303

%

o Q

+...*

'

Report No. 50-369/81-08 Licensee: Duke Power Company 422 South Church Street

-

Charlotte, NC 28242 Facility Name: McGuire Nuclear Station Docket No. 50-369 License No. NPF-9 i

Inspection at McGuire site near Lake Norman, North Carolina b

I)7/TT Inspector:

~

Date Signed

,

T. A. Peebles

/

Approved by:

L,m y ~~

3/z#3/

J. C. Bry p't,*SectioPChief, RRPI Section Date Signed

,

SUMMARY Inspection on March 9-13, 1981

_

Areas Inspected This routine announced inspection involved 32 inspector-hours on site in the areas of surveillance testing and Bulletin and Circular followup.

Results Of the two areas inspected, no violations or deviations were identified.

,

l I.

l l

l l

8104270N

l l

-

..

-

._

.

..

..

.

.

.,

.

e DETAILS 1.

Persons Contacted Licensee Employees W. M. Sample, Projects and Licensing

"D. G. Lampke, Projects and Licensing

  • D. Bradshaw, Operations Engineer G. A. Copp, Nuclear Engineer Other licensee employees contacted included engineers, technicians, operators, security force members, and office personnel.

Other Organizations J. Foland, Engineer; Westinghouse NRC Resident Inspector

  • T. J. Donat
  • M. J. Graham
  • Attended exit interview 2.

Exit Interview

-

The inspection scope and findings were summarized on March 13, 1981 with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

>

5.

Followup on IE Bulletins (Closed) IEB 80-11 - The licensee's response of. March 9, 1981, stated that all of the concrete block walls had been analyzed and that seventeen of the walls required modification and that the modifications had been completed.

The inspector reviewed the drawings for the modifications and visually verified that the modifications for Unit I had been properly completed.

This bulletin is considered closed.

However, NRR review may generate additional questions, which could re-open this bulletin.

(Closed) IEB 80-21 - The licensee documented, for all of the applicable valve manufacturers, that no valve yokes from Malcolm Foundry were used.

This bulletin is considered closed.

)

a s

%

.

(Closed) IEB 80-23 - This bulletin is considered closed, based on the verification of the licensee's replacement of the solenoids, which was documented in IE Inspection Report 50-369/81-04.

(0 pen) IEB 80-24 - This bulletin was reviewed but remains open until the licensee has established periodic surveillance and calibration procedures for the primary containment sump level switches.

6.

Followup on IE Circulars (Closed) IEC 80-05 - The licensee has a 1000 gallon lube oil tank piped to the diesel generators. The tank level is monitored in the monthly diesel generator operability test. The licensee agreed to place the same priority on the lube oil reserve supply as that of the fuel oil reserve supply.

(0 pen) IEC 80-04 - This circular was reviewed but remains open until a method of tracking problems with the securing of threaded locking devices is

established.

(Closed) IEC 80-09 - The licensee satisfactorily completed the pre-opera-tional test on Internal Communications (TP/1/B/1350/01) on 1/16/81.

The

'

audibility of the public address system was verified by walkthrough by the inspector.

The licensee is preparing a periodic test to assure the

continuing functioning of the internal communication system.

The circular is closed.

(Closed) IEC 80-10 - The inspector looked at maintenance procedures and they adequately cover the continued environmental qualifications of equipment.

,

This circular is closed.

(Closed) IEC 80-12 - The licensee has reviewed valve operators for lower than horizontal orientation and documented there were none. The inspectors i

walkdown of various systems also verified that there were none.

This circular is closed.

(Closed) IEC 80-23 - The licensee's diesel generator's electrical system is not manufactured by Beloit Power Systems and this circular is closed.

7.

Monthly Operational Surveillance The inspector observed surveillance testing required by the technical specifications; specifically, the monthly operability testing of the

'B'

Auxiliary feedwater pump per FT/1A/4252/01B. Tne testing was performed and evaluated satisfactorily. No violations were found in this area.

l

,

i s