IR 05000369/1981012

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-369/81-12 on 810420-24.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Program Audit,Lighting & Access Control.Details Withheld (Ref 10CFR2.790)
ML19345H540
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/08/1981
From: Hall B, Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19106A121 List:
References
50-369-81-12, NUDOCS 8105210223
Download: ML19345H540 (1)


Text

fMTElfl.T r!GITTT.D EUM C 0lliA1:!S 2.7 3 U E U I M E O

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION II

Report No. 50-369/81-12 Docket No. 50-369 License No. NFP-9 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name McGuir Nuclear Station Inspection at McGuire Nuclear Station near Charlotte, North Carolina Inspection conducted: April 20-24, 1981 Date of Last Physical Security Inspection Visit: January 27-29, 1981 Type of Inspection: Unannounced Physical Security Inspectors:

( hN

\\6 9

.

D4te ' Signed W. J. Tobin,}Qenior Physical Security Inspector M-Mm ds/n B.' L. Hall, P ysical Security Inspector Date' Signed f[F/8/

Approved by:~D. R. McGuire, Chief, Physical Security Section, ID/te Signed c,

~ -

Division of Engineering & Technical Inspection Inspection Summary Areas Inspected:

Included review of Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Area); Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; Records and Reports.

The inspection involved 80 inspector hours on site by two NRC inspectors. The inspection was begun during an offshift period; six inspection hours were accomplished during off shif t periods.

Results:

The licensee was found to be in compliance with NRC require-ments within the 20 areas examined during the inspection.

s-72 El

-. M

-

cf Co * s CepY _

tiiATE!Al.TRAliUES..I S[~ I'

N+$ net to to cc t 2

~ C0iliTdliS 2. 3 W..

-[pyccu:c,eiMtneutspecific 8105 21 u)2 3 Q

approval cf IE:II