Forwards IE Insp Repts 50-369/81-19 & 50-370/81-08 on 810615-18.No Noncompliance Noted
ML20009G568
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20009G569 List:
References
NUDOCS 8108040432
Download: ML20009G568 (2)


See also: IR 05000369/1981019

Text

____ . - _ _ _ -

_

OFFICIAL COPY

,

,

ff[ , 3o

g

UNITED STATES

'

g

NUCLEAR REGULATORY COMMISSION

g

y

g

g-

c

REGION ll

,, #

o

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA. GEORGIA 30303

jQ

~

Jut. t 01981

g ((

f,

Duke Power Company

4

-

ATTN: Mr. W. O. Parker, Jr.

-

Vice President, Steam Production

_ $b.

QN ,#

I

P. O. Box 2178

L-

, N #h

-

Charlotte, NC 28242

'

f$Y

g

4'

o'

N

s

Gentlemen:

O

(h &

'

Subject: Report Nos. 50-369/81-19 and 50-370/81-08

This refers to the routine inspection conducted by Mr. L. D. Zajac of this office

on June 15-18, 1981, of activities authorized by NRC Construction Permit Nos.

CPPR-83 and CPPR-84 for the McGuire facility and to the discussion of our

findings held with Mr. M. Starnes, Senicr Construction Engineer, at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taker with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy cf this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the consideraticns listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in :.he Public Document Room.

26c/

S

.

//

-

8108040432 810710

PDR ADOCK 05000

G

.

'

'

JUL i 01981

.

Duke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Since

ly,

'

ewi// Actind rector

Division 'of Resident and

Reactor Project Inspection

Enclosure: Inspection Report

Nos. 50-369/81-19 and 50-370/81-08

cc w/ encl:

M. D. McIntosh, Plant Manager

D. G. Beam, Project Manager