IR 05000369/1981029
| ML20032B549 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 10/15/1981 |
| From: | Hill A, Mcguire D, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20032B544 | List: |
| References | |
| 50-369-81-29, NUDOCS 8111050653 | |
| Download: ML20032B549 (1) | |
Text
UATERR TMr;SV.lTTED HMiM
- M804
.
,!
'n NUbbN
_
Y
!
'
REGION 11
e[
101 MARIETTA ST., N.W., SUITE 3100 o,
ATLANTA, GEORGIA 30303 o
0CT 161981 Report No. 50-369/81-29 Docket No. 50-369 License No. NPF-6 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: McGuire Nuclear Station Inspection at:
Lake Norman, NC Inspection Conducted:
September 28 - October 2,1981 Date of Last Physical Security Inspection Visit: August 1-2, 1981 Type of Inspecgon: Unannounced Physical Security h[
Inspecto s:]T. Moore, Physical Security Ir.spector A+.
/0/N/ 7/
i D.
Dhtd Signed
/O-/V-B/
A. O. Hill, Physical Security Inspector Date Signed Approved by:
(
_jwML D. R McGuire, CQef, Physical Sec rit/ Section Date Signed Technical Inspection Branch Division of Engineering and Techni al Inspection Inspection Summary Areas Inspected-Included review of security pian; security program audit; physical barriers (vital areas); access control (vital areas); lighting; alarm stations; detection aids; assessment aids; communications; testing and mainten-ance; compensatory measures; power supply; locks and keys; material control and accountability (reactor).
i The inspection involved 68 inspector hours on site by two NRC inspectors.
The inspection was begun during an offshift period; four inspection hours were acccmplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the 13 areas examined during the inspection.
>
Cop y,.,------]%en& Cop 1eg
~*#
>