IE Insp Rept 50-369/80-13 on 800610-19.No Noncompliance Noted.Major Areas Inspected:Preoperational Testing,Ie Bulletin 80-50 & Previous Insp Findings
ML19331D556
Person / Time
Site: McGuire 
Issue date: 07/28/1980
From: Andrea Johnson, Upright C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19331D545 List:
References
50-369-80-13, IEB-80-50, NUDOCS 8009030199
Download: ML19331D556 (2)


Text

{{#Wiki_filter:^ e ', [/ %$ UNITED STATES - ?3 $ NUCLEAR REGULATORY COMMISSION 'N A '

E - l REGION 11 k,. [ 101 MARIETTA sT., N.W., sulTE 3100 ATLANTA, GEORGIA 30303

O Report No. 50-36'9/80-13 Licensee: i> uke Power Company - 422 South Church Street Charlotte, NC 28242 'pacility Name: McGuire Unit #1 Docket No. 50-369 License No. CPPR-83 Inspection at McGuire site on Lake Norman Inspector: b

SO e_ = s A. H. Johns ITate Signed p Approved by: [[I'/ MM o 7 28 " . o C. M. Uprigh ', Sect Chief, RONS Branch 'pate signed SUMMARY Inspection on June 10-19, 1980 Areas Inspected This routine, unannounced inspection involved 70 inspector-hours on site in the areas of preoperational test witnessing, review of licensee response to bulletins, and followup on open items from previous reports.

Results Of the 3 areas inspected, no items of noncompliance or deviations were identified.

. 60090D0 ' . . ._ _.

. - ___ _ . _ _ _ _

r , . . i , e DETAILS 1.

Persons Contacted . Licensee Employees

  • M. D. McIntosh, Plant Manager
  • G. W. Cage, Superintendent of Operations W. M. Sample, Licensing and Projects Engineer
  • G. Gilbert, Operations Engineer
  • E. E. Estep, Projects and Licensing Assistant Engineer
  • D. M. Franks, Site Quality Assurance Engineer
  • D. B. Lampke, Assistant Licensing and Projects Associate Engineer Other licensee employees contacted included technicians, operators, mechanics, security force members, and office personnel.
  • Attended exit interview

. 2.

Exit Interview .. The inspection scope and findings were summarized on June 19, 1980 with those persons indicated in Paragraph I above.

3.

Licensee Action On Previous Inspection Findings a.

(Closed) Infraction 369/79-29-01, Failure to follow Containment Inte-grated Leak Rate Test (CILRT) procedure TP-1-A-1200-06, valve KC331 at penetration No. M355 was closed and signed off as being open in the test procedure. The licensee performed a local leak rate test on this penetration and added the results to the CILRT test results.

b.

(Closed) Unresolved Item 369/80-03-01, The licensee committed to add heat tracing to the recirculation and vent lines of the refueling water storage tank and the inspector verified that the heat tracing was added.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

IE Bulletin (Closed) IEB 80-50, VACUUM CONDITION RESULTING IN DAMAGE TO CHEMICAL VOLUME CONTROL SYSTEM (CVCS) HOLDUP TAhTS The licensee's response dated June 5, 1980 advised that the requirements of this bulletin have been met at McGuire. The licensee listed each tank and the design features which protected it against vacuum conditions that could result in tank damage.

.. }}