IR 05000369/1980005
| ML19305E641 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 04/28/1980 |
| From: | Gillespie F, Howell J, Tillman A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19305E637 | List: |
| References | |
| 50-369-80-05, 50-369-80-5, NUDOCS 8005200154 | |
| Download: ML19305E641 (1) | |
Text
___-__
_
____-_ ___ ______ _____
ETERfAlTRANS!.!IITED HERayrTH f***%
%IdSd@]MgMAT13H 8005200 g
-
/~'\\
P ( 3, NUCLEAR REGULATORY COMMISSION
.E REGION il
'*
e o,
101 MARIETTA ST N.W., SUITE 3100 ATLANTA. GEORGIA 30303
Report No. 50-369/80-5 APR 2 91980 Docket No. 50-369 License No. CPPR-83 Licensee: Duke Power Company 422 South Church Street Charlotte, North Carolina 28242 Facility Name: McGuire 1 Inspection at: McGuire Nuclear Plant, Lake Norman, North Carolina Inspection conducted: April 9-11, 1980 Date of Last Physical Security Inspection Visit: February 26-28, 1979 Type of Inspecti A o ced ysical Security Inspectors:
F.-h-#lt:2 e1 ysical pecurity Inspector Date
.
.
' / O/8 h/
Y-PB40 A. Tillm-st 1 7 rity Inspector Date
,
_/
4ML., [
_
4 --J y-g o Approved by: M s
F.P.Gilleispii,"ActinfSectionChief,SafeguardsBranch Date Inspection Summary l
Areas Inspected:
Included review of the licensee's vital and protected area physical barriers, interim protected area barriers, lighting, and alarm system.
The inspection involved 54 inspector-hours on site by three NRC inspectors. The inspection was begun during an off-shift period; 18 inspection hours were accom-plished during off-shift periods.
,
f Results: Within the scope of this inspection, no items of noncompliance were identified.
'
N
=
g S-T2 3'S - Of Cc57
_ _of Copies (
.
J Pcges This Docuront is not to be
,
reproduced without specific approval cf IE:II
.
MATERIALTRANSMITTED HEREMTH
CONTAINS 2.793INFDRMAT10ll
.._ _ _.
..--
-- _.
---
n
.
-