ML19331D549

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/80-13 on 800610-19.No Noncompliance Noted
ML19331D549
Person / Time
Site: McGuire 
Issue date: 07/28/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19331D545 List:
References
NUDOCS 8009030188
Download: ML19331D549 (2)


See also: IR 05000369/1980013

Text

-

.

q

.

,

,

[/>1KtGy

o,,

UNITED STATES

Sg

g

NUCLEAR REGULATORY COMMISSION

i

g

r

REGION 11

pe

101 MARIETTA ST,. N.W., EUITE 3100

\\

ATLANTA, G EORGIA 30303

JUL 2 81980

In Reply Refer To:

RII:AHJ

50-369/80-13

.. .

Duke Power Company

ATTN:

W. O. Parker, Jr.

{

Vice President, Steam Production

i

P. O. Box 2178

,

Charlotte, NC 28242

i

Gentlemen:

i

This refers to the inspection conducted by A. H. Johnson of this office on

June 10 through 19, 1980 of activities authorized by NRC Construction Permit No.

CPPR-83 for the McGuire facility, and to the discussion of our findings held with

M. D. McIntosh at the conclusion of the inspection.

..

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined' actions you have taken with regard to previously identified

enforcement matters and unresolved items.

in the enclosed report.

The status of these items is discussed

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document.

the report will be placed in the Public Document Room.If we do not hear from you

S009030

..

%

.

,

_g

Duke Power Company

-2-

JUL 2 81980

Shot.id you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

'

E.c

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-369/80-13

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

.

O

'

i

4

.

.

,,

p

- . - --- , , , , . - .

---g--

c--.---,

,,-..-.--.,,-,v..,-

, , - , -

, ,

,

, . . , - , . , , , , - ~ , , ,

- - - , -

-