Text
MATERIAL 1R?EMiriED HEREW!TH CONTAINS
l-2.790 INf0RMA110N
,
- -
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT 50-361/81-29(IE-V-466)
Report-No.
None Docket No.
50-361 License No.
Licensee:
Southern California Edison Company
-
,
,
P. O. Box 800 2244 Walnut Grove Avenue, Rosemead, California' 91770 San Onofre Nuclear Generating Station, Unit-22
'
Facility Name:
Inspection at:
Camp Pendleton, California Inspection conducted:
October 13-23, 1981 Date of Last Physical Security Inspection Visit:
None Type of Inspection:
Announced, Preoperational, Physical Security Inspectors:onS)
oNy.d
////g/rt-/
M. D. Schuster, Chief, Physical Security Section and Date Signed Inspection-Team eader bwfM SNi
-
////3/8/
W. /.' horte'nsen, Physical Security Inspector Da'te Signed blr! 13,91 Nu U)-
r rf
~
D. W. Schaefef, Physic'al Security Inspector Date Sig'ned
$
//f/WdP/
Q )w A L;. W.
fey, Physical Security Inspector Date Signed Ob
. [L t 4';h D//3[f/
A. D. Mc Physical Security In ector Date Signed
- // 3/ V/
Approved by:
A Date Signed
.)
dgaug), 'ChQ
.
Inspection Summary Areas Inspected:
Security Plan; Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protectc1 Area; Physical
.
Barriers - Vital Areas; Security System Power Supply: Lighting; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protection Area; Detection Aids -
Vital Areas; Alarm Stations; Communications; and Independent Effort.
MATER!AL TRAN3MtfTED HEREW!1B CONTAINS 2R N0mm 8111190700 811113 PDR ADOCK 05000361 O
'*
i MATERIAL TRMisMITTED liEREW!TN CONTA915
.'
2.790 ItWORMA110N
'
A
' ~
Summary (cont.)
-2-The inspection involved 590 hours0.00683 days <br />0.164 hours <br />9.755291e-4 weeks <br />2.24495e-4 months <br /> by the' inspection team.~ The inspection was begun during regular hours; of the. total inspection hours, 230 were accomplished during off-shift periods.
,
Findings: There were no items of noncompliance identified during the Inspection.
.
'
,
-
^