IE Safeguards Insp Rept 50-361/81-29 on 811013-23.No Noncompliance Noted.Major Areas Inspected:Security Plan, Organization Mgt,Personnel,Response & Program Audit.Details Withheld (Ref 10CFR2.790)
ML20032E188
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/13/1981
From: Ivey L, Mcqueen A, Mortensen W, Norderhaug L, Schaefer D, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20032E183 List:
References
50-361-81-29, NUDOCS 8111190780
Download: ML20032E188 (2)


Text

MATERIAL 1R?EMiriED HEREW!TH CONTAINS

l-2.790 INf0RMA110N

,

-

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT 50-361/81-29(IE-V-466)

Report-No.

None Docket No.

50-361 License No.

Licensee:

Southern California Edison Company

-

,

,

P. O. Box 800 2244 Walnut Grove Avenue, Rosemead, California' 91770 San Onofre Nuclear Generating Station, Unit-22

'

Facility Name:

Inspection at:

Camp Pendleton, California Inspection conducted:

October 13-23, 1981 Date of Last Physical Security Inspection Visit:

None Type of Inspection:

Announced, Preoperational, Physical Security Inspectors:onS)

oNy.d

////g/rt-/

M. D. Schuster, Chief, Physical Security Section and Date Signed Inspection-Team eader bwfM SNi

-

////3/8/

W. /.' horte'nsen, Physical Security Inspector Da'te Signed blr! 13,91 Nu U)-

r rf

~

D. W. Schaefef, Physic'al Security Inspector Date Sig'ned

$

//f/WdP/

Q )w A L;. W.

fey, Physical Security Inspector Date Signed Ob

. [L t 4';h D//3[f/

A. D. Mc Physical Security In ector Date Signed

  1. // 3/ V/

Approved by:

A Date Signed

.)

dgaug), 'ChQ

.

Inspection Summary Areas Inspected:

Security Plan; Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protectc1 Area; Physical

.

Barriers - Vital Areas; Security System Power Supply: Lighting; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protection Area; Detection Aids -

Vital Areas; Alarm Stations; Communications; and Independent Effort.

MATER!AL TRAN3MtfTED HEREW!1B CONTAINS 2R N0mm 8111190700 811113 PDR ADOCK 05000361 O

PDR

'*

i MATERIAL TRMisMITTED liEREW!TN CONTA915

.'

2.790 ItWORMA110N

'

A

' ~

Summary (cont.)

-2-The inspection involved 590 hours0.00683 days <br />0.164 hours <br />9.755291e-4 weeks <br />2.24495e-4 months <br /> by the' inspection team.~ The inspection was begun during regular hours; of the. total inspection hours, 230 were accomplished during off-shift periods.

,

Findings: There were no items of noncompliance identified during the Inspection.

.

'

,

-

^