IR 05000338/1979024
| ML19242C754 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/30/1979 |
| From: | Fuchko J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19242C748 | List: |
| References | |
| 50-338-79-24, NUDOCS 7908130331 | |
| Download: ML19242C754 (5) | |
Text
.
-
_
-
,1,4',T 7,$ 7,*."?"'ITl PIdM
'
'
. C:r: 31"' -
,6 M
- "' *%'o, UNITED STATES
8 "
3,
~j NUCLEAR REGULATORY COMMISSION
.
'.
REGION 11
, - [r 101 MARIETT A sT., N.W., sUtTE 3100
0, ATLANTA, GEORGIA 303o3
% * be /
MAY 311979
""*
Report No. 50-338/79-24 I.icensee: Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 Facility Name: North Anna 1 Docket No. 50-338 L'. cense No. hPF-4 Safeguards Group No. IV Inspection at North Anna Site near Mineral, Virginia 5 [30 b$
h
J, Inspector:
J. If. Fuchko Date Signed 30[99.
'
k (
Approved by:. J. Tobin,'A Qing Section Chief, D' ate Signed
,
Safeguards Bran 6'a SUMMARY Inspection on May 9-10, 1979 Areas Inspected This special announced inspection involved 16 inspector-hours on site in the area of fuel security.
Results Of the one area inspected, one apparent item of noncompliance was found (ljeficiency - Vital areas authorization paragraph 4 (50-338/79-24-01).
5-72 79 6 b?
-
Cc;7 ef I O Ccpies i
F:-::
- hi; N:ct:
ir.ct to be rcproduecd -it'=: I;ccifio approvni cf !::II
-
.Ti; OT[
r>T..". m"..T".~~333f 7 9 0 813 0 3 3I Ot c
......
_
-
_.
.__.
-.
..
EXEMPT FROM DISCLOSURE
.
10 CFR 2.790 INTOr.;iATICN
.
DETAILS 1.
Persons Conte: ted Licensee Employees
- W. R. Cartwright, Station Manager
- E. W. Harrell, Superintendent, Maintenance
- C. F. Winecoif, Station Security Supervisor
- C. W. Smith, Jr., Security Operations Supervisor
- B. L. Lockemer, Security Shift f Servisor T. Clune, Nuclear Instrument Technician A. Neufer, Operations Shif t Supervisor J. Horton, Chemistry Supervisor Other licensee employees contacted include technicians, operators, mechanics, security force members and office personnel.
NRC Resident Inspector M. S. Kidd
- Attended exit interview.
,
2.
Exit Interview The inspection scope and findings were sum:narized on May 10, 1979, with those persons indicated in Paragraph I above.
3.
Unruolved Items Unresolved items were not identified during this inspection.
4.
During the course of this special inspection, the Inspector examined the additional security measures taken by the licensee to upgrade the security being provided the fuel storage area at the sice.
The Inspector verified that the following actions were being taken:
A guard was continually stationed in the fuel storage area to maintain a.
the fuel under his observation. This post was created mid-morning on May 8, 1979. Prior to that, the licensee had initiated hourly patrols of the area, which comenced on May 7,1979, at 2301 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.755305e-4 months <br />. Upon discovery of a shaft which led to the bottom of the new fuel pool, the location of the guard was changed to maintain this possible approach to the fuel under his observation.
b.
Access to the area was being controlled as if it were a vital area.
'
-
551042 EXDtPT FRDt1012:LO URE 10 CFR 2.79C INi C. '-1 AliO N
_.
EXEMPT FEC!t C CCLD:URE 10 CFR 2.793 INFDi.r; ATION
-2-
.
The doors leading to the area were locked and " alarmed".
c.
The alarms were functionally tested during the period 2300 -0700 on May 8-9, 1979.
The licensee increased security on the Unit 2 construction side by posting a contract watch person to control access to Unit 2 containment.
An inspection of the new fuel located in the fuel storage area was conducted on May 8, 1979, with no damage discovered. At present there are 125 fuel elements in the new fuel pit and 32 fuel elements in the dry spent fuel pit.
During the course of inspecting the area and reviewing various blueprints, the inspector observed that there are threc doors equipped with card readers.
The following areas were discussed with licensee management:
1.
How does the guard stationed at the fuel storage area determine if individuals working in the vicinity of or with the fuel is conducting a legitimate activity?
2.
How is it determined if any security devices on the various levels have been defeated or tampered with and if any suspicious items have been introduced?
e 3.
The weakness in hardware installation for several locking devices utilized to secure the perimeter portals.
4.
How will " tailgating" (multiple entries to a vital area on one cardkey) be discouraged in the future?
5.
Do all the individuals authorized access to the fuel area require access? Following is the distribution of active cardkeys on May 9, 1979.
Fuel Access Total Keys
.
Plant Operations 346 390 Construction / Systems
164 Contractors
580 Total 396 1154 Discussions with licensee management resulted in the following SCtions; (a) A written instructica was issued on May 9, 1979, to the security organization to verify the " legitimacy" of any activities performed in the vicinity of and to the fuel.
551043-EXEMPT FR:!! t;;;Lg3ung 10 CFR 2.7C !.rc. MilDN
-
. - -
EXE!iPT FECM DI2CLCIURE
.
.
10 CFR 2.790 I;,7L,,,,;7;gy
,
-3-This would be done by contacting the Operations Shift super-visor on duty.
(b) An additional patrol would be conducted e"ery four hours to check the fuel storage area (all three levels) for any damage done to the security devices or any suspicious items.
(c) A work order number was initiated on May 9, 1979, to correct the lock weakness.
(d) Oc May 10, 1979, Plant Management issued a memorandum stressing the importance of avoiding " tailgating".
'
(e) Plant management will conduct a review of all individuals authorized access to the fuel building to reduce the number from its present level.
Licensee management personnel indicated that any alarms in the responded to as personnel perm.t, since required security area are actions take priority. They also indicated that the mechanical keys to the fuel storage building doors are controlled by security.
The last key card inventory was conducted on May 4,1979. The previous one was completed on March 2,1979.
The following key cards were lost and not recovered.
Badge Number Date Lost 2142 Unknown 1295 April 3, 1979 1297 April 29, 1979 Paragraph 1.6.1 of the licensee's security plan requires, in part, that the need for access to vital areas and authorization for unescorted access to vital areas is revalidated at least once each calendar month, by the station manager or his designated representative.
As of May 9,1979, the following badge series vital area authori-zations were last validated on the date indicated:
Series Date Validated 1000 March 23, 1979 2000 March 23, 1979 3000 March 29, 1979 This item is categorized as a deficiency and is identified as 50-338/79-24-01.
GGLG'M EXEMPT FECM O': ' 2 UE 10 CTR 2.790 iM CM'iANN
.. _ _
._
.
_
...
_.
.-
.-
EXEMPT FCGM CISCLDEURE 10 CFR 2.750 1:4 FORM /. TION
~
-4-
The station manager issued a memorandum dated May 10, 1979, revalidating the access list until revision of personnel allowed access to the fuel building was completed.
.
e5UlO k3 EXEMFT FRCM CIC LG U E 10 CFR 2.7901;iFORMATION
,
_ __.