Forwards IE Insp Rept 50-328/81-11 on 810318-20.No Noncompliance Noted
ML19350D310
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/08/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19350D311 List:
References
NUDOCS 8104150193
Download: ML19350D310 (2)


See also: IR 05000328/1981011

Text

MTalAL TRuSM'TTFD H3EWITH

CONTAINS 2.E0INf0RMAT10N

7/g

,

ocuy

, %f

'o

UNITED STATES

'y"

N

NUCLEAR REGULATORY COMMISSION

$

.E

REGION ll

  1. n

101 MARlETTA ST., N.W.. SUITE 3100

~f

4-

ATLANTA, GEORGIA 30303

-'****

APR 0 81981

m

7

Tennessee Valley Authority

SS

ATTN:

H. G. Parris

- g

I

Manager of Power

ga

jjpE

3 gOI

l

500A Chestnut Street Tower II

-

Q "' g sD %rA U.

Chattanooga, TN 37401

\\'Cg

Gentlemen:

e,3

p

Subject: Report nom 8/81M

D

l

This refers to the preoperational safeguards inspection conducted by D. E. Moore

of this office on March 18-20, 1981, of activities authorized by NRC Construction

Permit No. CPPR-73 at Sequoyah Unit 2 facility and to the discussions of our

findings held with J. McGriff at the conclusion of the inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Federal Regulations, Part

73, " Physical Protection of Plants and Materials", and the specific requirements

of license conditions and your approved Security Plan. Within these areas, the

inspection consisted of selective examinations of nrocedures and representative

records, interviews with personnel, performance tr ts, and observations by the

inspector.

l

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,

!

Title 10, Code of Federal Regulations, activities involving safeguards and

i

security measures are exempt from public disclosure; therefore, the enclosed

i

inspection report with the exception of the report cover page, which is an

inspection summary, will not be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

E.c.

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosures: (See Page 2)

l

l

8104150 W.>

MATMEM HMH

CONTAlHS 2.E0 INFORMATEN.

-

MATUMALTRANSMITTED HEREWfTH

,

o

CONTAINS 2.7W INFORMAT13N

1

Tennessee Valley Authority

2

Enclosures:

1.

Inspection Report No. 50-328/81-11

(Exempt from Disc 10:;4 e)

2.

Inspection Summary

(NotExempt)

cc w/ encl:

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

,

l

l

MATERIAL T?.ANSMITTED HEEM

!

"NTAINS 2.7N liif0.3MATia.1

l

. _ _ _

-.

. .--

.

- -