IR 05000289/1981005

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-289/81-05 on 810223-27.No Noncompliance Noted.Major Areas Inspected:Work Activities & Records Associated W/Unit 1 Restart Program Including Electrical & Instrumentation Documents
ML20004A150
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/19/1981
From: Ebneter S, Sassani A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20004A149 List:
References
50-289-81-05, 50-289-81-5, NUDOCS 8105120190
Download: ML20004A150 (5)


Text

.-

j l

!

U.S. NUCLEAR REGULATORY COMMISSION

.

W OFFICE OF INSPECTION AND ENFORCEMENT l

Region I

-

,

Report No. 50-289/81-05

,

Docket No. 50-289 License No. DPR-50 Priority Category C

--

Licensee:

Metropolitan Edison Company P. O. Box 480

,

Middletown, Pennsylvania 17057 Facility Name:

Three Mile Island Nuclear Station, Unit I l

Inspection at:

Middletown, Pennsylvania

]

Inspection conducted:

February 23-27, 1981 Inspect'rs:

4 # Se'

b 3 - / */ - 8 /

o

_

A. D. Sassani, Jr.f' Reactor Inspector date signed date signed date s1gned Approved by: MA[-O /.M FBL M 3 - / f - S'/

S. D. Eb' net'er, Chief, Plant Systems date signed

'

Section, Engineering Inspection Branch P

Inspection Summary:

'

Inspection on February 23-27, 1981 (Report No. 50-289/81-05)

Areas Inspected:

Routine, unannounced inspection by a regional-based inspector of work activities and records associated with the Unit 1 Restart Program, i

including: electrical and instrumentation documents, records and equipment installation associated with borated water storage tank (BWST) le"el indication (Task LM-4) and containment isolation on reactor trip (Task RM-50) modifications.

The insp2ction involved 35 inspection hours on site by one NRC regional-based inspector.

,

-

Results:

No item of noncompliance was identified.

I Region I Form 12 (Rev. April 77)

8105120/70

r:

-

,.

<

.

i

,

. i

-

'I

.

t

-

DETAILS

1.

Persons Contacted

-

General Public Utilities Nuclear Corporation (GPUNC)

l

.

.

,

l

  • B. Ballard, QA Modifications / Operations Manager
  • J. Fornicola, Operations QA Manager I
  • J. Fritzen,- Engineering Manager

T.' Graham,= Lead QC, Receiving

!

  • H. Hukill, Vice President and' Director of TMI-1

!

'R. Prabhaker, TMI QA Engineering Manager

'

W. Shumaker, Lead QC, Electrical

Metropolitan Edison Company

"

  • L. Harding, Supervisor of Licensing
  • D. Mitchell, Licensing Engineer L. Zubey, Construction Manager Catalytic Engineering and Constructors D. Grahat, Electrical Superintendent, Unit 1

)

J. Kimmel, Electrical Supervisor, Unit 1 T. Reddington, Field Superintendent, Unit 1

)

U. S. Nuclear Regulatory Commission

]

W. Rekito, Reactor Inspector F. Young, TMI-1 Resident Inspector

  • Denotes personnel present at exit interview.

l 2.

Borated Water Storage Tank (BWST) Level Indication, (Task LM-4)

a.

Tne inspector reviewed quality related documents and records relative

'

to electrical and instrumentation components to a;certain whether applicable requirements have been met in areas relating to receipt

inspection, installation inspection, component certification, and i

purchase order requirements.

Areas inspected for this determination include:

j

!

Engineering Change Memorandum, ECM-5017, Revisions 0, 1, and 2

--

Purchase Order 72856, Instrument Valves

'

--

,

,,e

.. -,.

-

e e

.

.

,

u

-

t

.

L

'

-

.

'

Purchase Order 86529, Indicating Pressure Switch l

---

i i

Purchase Order 65582, Instrument Tubing _

--

I Me?-Ed, Quality Control, Accept Tag for Purchase Order 72866, Item

--

No. 8

'

,

t QC Receipt Deficiency Report, RDR 80-15 l

--

Electrical Inspection Report No. 159, Conduit, Run No. RK837

!

--

!

Electrical Inspection Report No. 160, Cable, Run No. bK837

--

.

Electrical Ins y tion Report No. 179, Cable Terminating, Run No.

l

--

RK837

I During the rc view of the instrument valve purchase order package, no.

l 72866, the inspector observed that the receiviag checklist inspection

!

report indicated that the in:trument valves were "Not For N1, N2, or i

N3 Use".

The inspectur then reviewed the Met-Ed, Quality Control,

'

Accept Tag for this purchase order and ascertained that the Accept Tag

,

contained the same statement "Not For N1, N2, or N3 Use".

!

l The inspector examined the installation of this modification as described

!

in paragraph 2.b of this report and ascertained that three instrument valves from this purchase order were installed. Additionally, the.-

l latest approved-for-coustruction drawing, B-308-856, Revision IA-1

!

indicates that the classification of this installation is Nuclear

.

Class-N3.

l

The inspector examined other items of this purchase order and ascer-i tained that numerous other instrument valve Quality Control, Accept i

Tags contained "Not For N1, N2 or N3 Use".

j i

The inspector requested tha', the 11censee ascertain whether other

'

' instrument valves from tH s purchase order were installed in Nuclear

!

Class N1, N2, or N3 classified installathns, j

The inspector identified this as an unresolved item, which will be the

!

subject of a further review by an NRC inspector during a subaaquent IE q

inspectio: (81-05-01).

b.

The inspector examined completed work on differential pressure switch I

(DPS 914), cable, conduit, instrument tubing and instrument valves to asce?tain whether applicable requirements have been met on the installa-

!

tior of the components r-d materials.

l

,

..

..

.

.

,

r

'

Documentat' ion reviewed for this determination include:

.-

Piping Instrument Diagram, B-308-856, Revision JA-l'

[

---

Field Fabrication and _ Erection of Piping Specification,' SP-5661

[

--

,

Receiving, Storing and Installation of Cable Trays and Conduits

--

. Procedura, ECP-S-:', Revision 12

--

Receiving Storage and Installing Wire and Cable Procedure, ECP3-2, Revision 34

,

--

Field Questionnaire Transmittal, FQ-R49 l

l During the inspection of the installation of DPS-914, located in the borated water storage tank tunnel area, the inspector observed that i

the installation does not agree with the latest approved-l for-construction drawing B-308-856, Revision IA-1.

Although the electrical installation inspection had been completed, the inspector

- ascertained that the mechanical installation inspection had not been performed.

]

,

The inspector identified this as an unresolved item which will be tne subject of a further review by an NRC inspector during a subsequent IE inspection (81-05-02).

3.

Containment Isolation on Reactor Trip (Task RM-5C)

.;

The requirements for this task are detailed in NUREG-0578, Section 2.1.4,

-NUREG-0680, Section 2.1.4, Page C8-21 and GPU TMI-1 Restart Report, Sectirm l

2.1.1.5.

a.

The inspector examined completed work on conduit and conduit supports

to ascertain whether applicable requirements have been met on the

'

installation of the materials ar.d components.

Areas inspected for this determination include:

Receiving, Storage and Installation of Cable Trays and Conduits

--

' Procedure, ECP-8-2, Revision 12

--

Conduit Support Location Drawing, Auxiliary Building EL 305 feet, C-204-140, Revision IA-2 j

Electrical Conduit and Cable Layout Drawing, Control Tower EL 338

--

feet, E-215-045, Revision 10-2

'

Engineering Change Memorandum ECM-5164, Conduit Supports

--

i

',

n

.

,

,

u--

'

I

5.

!

I

.

.i

-

Engineering' Change Memorandum, ECM-S070, Cenduit j

--

.

Electrical Conduit Support Drawings, S-204-166 thru S-204-178 for i

--

Conduit Supports IAXD-C19 tinru 1AXD-C31

,

' Conduit Run Nos. RP-755, RP-735, RP-745, RP-733, RR-731, RP-743,

--

RR-733,.RR-741, RR-743, and RR-753

?

No item: cf.nonccmpliance was identified.

l

!

4.

Unresolved Items l

Unresolved items are matters about which more_information is_ required in.

l order to ascertain whether they are acceptable items, items of noncompliance, l

or deviations. The unresolved items reviewed during this inspection are i

discussed'in paragra.ph 2.a and 2.b.

j

]

S.

Exit Interview The inspector met with the licensee representatives (denoted in paragraph i

1) at the conclusion of the inspection on. February 27, 1981.

In addition, j

- the NRC TMI-1 Resident Inspector, Mr. F. Young, attended the meeting. The

!

inspector summarized the purpose, scope and findings of the inspection and the unresolved items were discussed.

!

[

,