IR 05000280/1979043

From kanterella
Jump to navigation Jump to search

IE Insp Repts 50-280/79-43 & 50-281/79-63 on 790718-20.No Noncompliance Noted.Major Areas Inspected:Const Status, Licensee Action on Previous Insp Findings,Nonconformance Rept Review & safety-related Work Activities
ML18136A003
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/01/1979
From: Bryant J, Wilcox J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18135A156 List:
References
50-280-79-43, 50-281-79-63, NUDOCS 7909280539
Download: ML18136A003 (4)


Text

UNITED STATES

"

,

NUCLEAR REGULATORY COMMISSION

REGION II

A 101 MARIETTA ST., N.W., SUITE 311f01(

ATLANTA, GEORGIA 30303

Report Nos. 50-280/79-43 and 5*0*:..281/79-63 Licensee:

Virginia Electric and Power Company Richmond, Virginia 23261 Facility Name:

Surry Power Station Units 1&2 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37

., I

'

Virginia SUMMARY Inspected on July 18-20, 1979 Areas Inspected

'

Branch Date Signed rJhr Dte'Signed This routine unannounced inspection involved 16 inspector-hours onsite in the areas of construction status, licensee action on. previous inspection findings, nonconformance report review, and observation of safety-reiated work activitie Results Of the areas inspected, no items of noncompliance or deviations were identifie '-

..

DETAILS Persons Contacted Licensee Employees

  • J. L. Wilson, Superintendent,Operations
  • D. A. Christian, Engineering Supervisor
  • D. L. Hahn, Maintenance Coordinator
  • J. Maciejewski, NDT Supervisor
  • D. Kildoo, Quality Control
  • R. Baldwin, Administrative Supervisor
  • O. J. Costello, Administrative Assistant A. L. Parrish, III, Project Manager, Steam Generator Project E. J. Rivas, Resident Engineer Construction_ - Outside Containment Other Licensee Employees contacted included four construction craftsmen, two technicians, two security force members, and three office personnel.

NRC Resident Inspector

  • D. K. Burke
  • Attended.exit interview

- Exit Interview*-*

The Inspection scope and findings were summarized on July 20, 1979, with those persons indicated in Paragraph 1 abov.

Licensee Action on Previous Inspection Findings (Closed) Unresolved item (50-281/79-08-04 and S0-281/79-09-04), Gummed labels and tap The licensee has tested gummed labels and tape of the type which are fixed to various stainless steel fitting From this test, it has been determined th~t the labels a~d tape contains less than 0.10 percent by weight of halogen and sulfur. This action is documented in VEPCO's memo from R. F. Sanders to R. F. Kemper dated May 18, 197 No further action is require (Closed) Unresolved item (S0-281/79-22-01), Long-term short-term storage of new steam generator assemblie The term "short-term storage" has been redefined by the licensee as: "the storage condition.

which is implemented on the basis of an inert purge-bleed system rather than a vacuum dehydration with an air-tight seal." In addition

-2-the licensee has committed to the following:

to assure that the cleanliness of the unit is not jeopardized a thorough inspection will be performed after the generator has been set in place in the contain-ment. This criteria complies with the past and present storage conditions of the new steam generator lower assemblies. This action is documented on VEPCO's memo from E. J. Rivas to J. Goodson dated April 14, 197 No further action is require.

Unresolved Items Unresolved items were not identified during this inspectio.

Independent Inspection Effort Construction Status The 'A' and 'C' cubicle steam generator girth welds are being welde The 'B' cubicle steam generator girth weld is in its final stages with the required non-destructive examination being performed. The reactor coolant piping identified as EP-5 to the 'B' steam generator is being installed. The containment crane wall is being repaired.

Nonconformance Reports (NCR)

The inspector examined the following VEPCO noncomformance reports for completeness, description noted and corrective action/disposition assigned:

Report N Description Feedwater ring*bridge support CTMT Floor Modification No items of noncompliance or deviations were identified in the areas inspecte Observation of Safety-Related Work Activities The majority of time spent during this inspection involved the obser-vation of the following safety-related work: Welding of the steam generator girth welds, 'A' and 'C' cubicles -

Engineering Task Assignment (ETA)-4000. Non-destructive examination of the steam generator girth weld,

'B' cubicle - ETA-40006.

Installation of the reactor coolant pipe EPS to 'B' steam generator -

ETA-4000 *

-3-Repair of the containment crane wall - ETA-4001 No items of noncompliance or deviation were identified in the areas inspecte *