Report No.:
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, ATLANTA, GEORGIA 30303 50-280/79-5 and 50-281/79-5 Licensee:
Virginia Electric and Power Company P. 0. Box 26666 Richmond, Virginia 23261 Facility Name:
Surry 1 and 2 Docket No.:
50-280 and 50-281 License No.:
DPR-32 and DPR-37 Inspection at Inspector:=----=-~=-~~::::;i~~~~~~____,.----=---,-~~~~~~~~~
S. C. Ewald, Radiatio Specialist Accompanying Personnel: ~
f-A.~SS, FFMS Branch Approved by: ~:z:;
.
~ A.F. Gibson, Sec,,;on Chief RSS, FFMS Branch SUMMARY Inspection on January 18, 1979 Areas Inspected Date Signed 2. /1:{ /7'
Date Signed This special, announced inspection involved 12 inspector-hours onsite in the areas of radiation protection programs and facilities associated with the steam generator replacement projec Results No items of nonc~mpliance or deviations were identified.
7903 2so1\\1
(
DETAILS Persons Contacted Licensee Employees.
W. L. Stewart, Station Manager
- P. P. Nottingham, Health Physics Coordinator - SGRP
- R. M. Smith, Health Physics Supervisor NRC Resident Inspector D. J. Burke
- Attended exit interview Exit Interview The inspection scope and findings were summarized on January 18, 1979 with those persons indicated in Paragraph 1 abov Licensee Action on Previous Inspection Findings Not inspecte.
Unresolved Items No unresolved items were identified during this inspectio.
Steam Generator Replacement Project (SGRP) Briefing The inspectors participated in a SGRP overview briefing with licensee representatives on January 18. Presentations by licensee representatives included brief descriptions of various phases of the project and a discussion of VEPCO plans and committments to maintain occupational radiation exposures resulting from the project as low as reasonably achievable (ALARA).
SGRP Facility Tours The inspectors met with the Health Physics Supervisor and the SGRP Health Physics Coordinator and toured several facilities associated with the SGRP as discussed below. The inspectors examined a training makeup of reactor coolant pipe with a contamination tent and pipe cutting equipmen The inspectors toured the clean change building
.),,.
I I
I-2-constructed for the SGRP and discussed worker traffic flow for personnel entering containment, exiting containment, contamination frisking, and decontaminatio The inspectors were shown facilities in use for fabrication of various gloveboxes, contamination tents and lead-wool blanket All tents and gloveboxes will be designed and fabricated on-sit The inspectors discussed the use of gloveboxes for contaminated pipe cuts with licensee representative The SGRP Health Physics Coordinator stated current plans are to construct tents for large pipe cuts and gloveboxes for all small pipe cuts. Estimates call for approximately 15 glovebox type cuts per steam generator.