UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Report Nos. 50-280/79-41 and 50-281/79-61 Licensee: Virginia Electric and Power Company Richmond, Virginia 23261 Facility Name:
Surry Nuclear Plant, Units 1 and 2, Docket Nos. 50-280 and 50-281 Licensee Nos. DPR-32 and DPR-37 Inspection SUMMARY Inspection on July 17-20, 1979 Areas Inspected Virginia Chief, RCES Branch
~A/Jct Date Signed
~fo/?f'
Dfu Signed This special, unannounced inspection involved 25 inspector-hours onsite in the areas of feedwater piping inspection per IEB 79-13; steam generator replacement; inservice inspection progra Results Of the three areas inspected, no items of noncompliance or deviations were identifie.
Persons Contacted Licensee Employees DETAILS W. L. Stewart, Station Manager
- J. L. Wilson, Superintendent Operations
- D. A. Christian, Engineering Supervisor
- D. L. Hahn, Maintenance Coordinator
- T. J. Kenny, Outage Coordinator
- J. Goodson, SGRP-Quality Control
- J. Maciejewski, NDT Supervisor
- D. Kildoo, Surry-QC
- R. Baldwin, Admin. Supervisor
- W. Skelley, Admin. Asst. SGRP
- O. J. Costello, Admin. Asst. Surry Other licensee employees contacted included several construction craftsmen, technicians, security force members, and office personne NRC Resident Inspector
- D. Burke
- Attended exit interview Exit Interview The inspection scope and findings were summarized on July 20, 1979, with those persons indicated in Paragraph 1 abov The inspector reviewed the status of the feedwater piping inspectio.
Licensee Action on Previous Inspection Findings Not inspecte.
Unresolved Items Unresolved items were not identified during this inspectio Feedwater System Piping Inspection Per IE Bulletin (IEB) No. 79-13 (Unit 1)
At the time of this inspection the licensee was in the process of radiographing the Unit 1 feedwater piping as required by IEB 79-1 This inspection involved 17 welds for A generator, 11 welds for B generator and 14 welds for C generator (excluding the nozzle to reducer and reducer to piping welds).
-2-The inspector reviewed the new radiographs with particular emphasis on the radiographs which contained indications in the weld are The indications which the licensee was finding in these piping welds were fabrication related indications such as porosity, slag, incomplete fusion rather than service related indications such as the cracking found in the reducer The inspector reviewed the following radiographs:
Feedwater to "A" Generator Welds Nos. 1, 2, 3, 4, S, 6, 8, 9, 13 and 14 were reviewed Welds Nos.3, 4, 5 and 13 contained rejectable indications Feedwater to "B" Generator Welds No~.l, 2, 3, 4 and 5 were reviewed Weld No. 1 contained rejectable indications Feedwater to "C" Generator Welds Nos.l, 2, 3, 4, S, 6, 9 and 11 were reviewed Welds Nos.S, 6, 9 and 11 contained rejectable indications As of July 20, 1979, the licensee still had six welds to radiograph and two to ultrasonically inspect to complete the !EB No. 79-13 required inspection of the main feedwater pipin There were no items of noncompliance or deviations in this area of the inspectio.
Steam Generator Replacement (Unit 2) The inspector observed the CB&! welding activities in the Unit 2 containment. Particular attention was paid to the control of welding materials within the containmen There were no items of noncompliance or deviations in this area of inspectio Inservice Inspection Program (Unit 2)
The inspector reviewed the status of the Unit 2 inservice inspection with the license The inservice inspection was being conducted in accordance with the plant technical Specification Section 4.2, 4.15, 6.5 and B(7) to the requirements of ASME Section XI, 1971 Edition through through Summer 1972 addend The inspection was
!
-3-partially completed prior to the start of the steam generator replacement and will be completed when unit 2 is turned back over to VEPCO operation There were no items of noncompliance or deviations in this area of inspection.