IR 05000220/2019003

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000220/2019003 and 05000410/2019003 and Independent Spent Fuel Storage Installation Inspection Report 07201036/2019001
ML19312A053
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 11/06/2019
From: Erin Carfang
Reactor Projects Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Carfang E
References
IR 2019003, ISFSI IR 2019001
Download: ML19312A053 (23)


Text

November 6, 2019

SUBJECT:

NINE MILE POINT NUCLEAR STATION - INTEGRATED INSPECTION REPORT 05000220/2019003 AND 05000410/2019003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07201036/2019001

Dear Mr. Hanson:

On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station. On October 23, 2019, the NRC inspectors discussed the results of this inspection with Mr. Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC Resident Inspector at Nine Mile Point.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC Resident Inspector at Nine Mile Point. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Erin E. Carfang, Chief Reactor Projects Branch 1 Division of Reactor Projects

Docket Nos. 05000220, 05000410,

and 07201036 License Nos. DPR-63 and NPF-69

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000220, 05000410, and 07201036

License Numbers:

DPR-63 and NPF-69

Report Numbers:

05000220/2019003, 05000410/2019003, and 07201036/2019001

Enterprise Identifier: I-2019-003-0036

I-2019-001-0074

Licensee:

Exelon Generation Company, LLC

Facility:

Nine Mile Point Nuclear Station

Location:

Oswego, NY

Inspection Dates:

July 1, 2019 to September 30, 2019

Inspectors:

G. Stock, Senior Resident Inspector

J. Dolecki, Resident Inspector

B. Sienel, Resident Inspector

E. Burket, Senior Reactor Inspector

O. Masnyk Bailey, Health Physicist

J. Nicholson, Senior Health Physicist

R. Rolph, Health Physicist

J. Steward, Acting Senior Resident Inspector

Approved By:

Erin E. Carfang, Chief

Reactor Projects Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Nine Mile Point Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Obtain Station ALARA Committee Approval for a Dose Estimate Change Which Resulted in Collective Dose Greater Than 5 Person-Rem and Exceeding the Estimate by More Than 50 Percent Cornerstone Significance Cross-Cutting Aspect Report Section Occupational Radiation Safety Green NCV 05000220/2019003-01 Open/Closed

[H.4] -

Teamwork 71124.02 The inspectors identified a finding and Green NCV of Technical Specification 6.4.1,

"Administrative Controls, Procedures," for Exelon's failure to follow its procedure to maintain doses as low as reasonably achievable (ALARA) during the most recent Unit 1 refueling outage. Specifically, Exelon did not follow procedure RP-AA-401, "ALARA Planning and Controls," and did not obtain Station ALARA Committee review when raising the dose estimate for drywell main steam isolation valve activities. This resulted in the dose estimate changing from a Category 1 to a Category 2 work activity which required approval by the Station ALARA Committee in accordance with Exelon procedure RR-AA-401, ALARA Program, step 4.2.7(3). The site had additional exposure estimate increases which resulted in the accumulated dose exceeding 5 person-rem and exceeding the original estimate by greater than 50 percent.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at 100 percent power. On August 4, 2019, Unit 1 experienced a trip of the reactor recirculation motor-generator 11 resulting in power decreasing to approximately 87 percent. Later that day, operators raised power using the four remaining reactor recirculation motor-generators and reached 100 percent. On August 6, 2019, following repairs to the reactor recirculation motor-generator 11, operators performed a planned power reduction to approximately 85 percent to place the component in service. Later that day, Unit 1 was restored to 100 percent power. Unit 1 remained at or near 100 percent power for the remainder of the inspection period.

Unit 2 began the inspection period at 100 percent power. On September 20, 2019, operators performed a planned power reduction to approximately 70 percent to conduct quarterly turbine valve reactor protection system testing, control rod sequence exchange, and scram time testing. On September 22, 2019, Unit 2 was restored to 100 percent power. Unit 2 remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Summer Readiness Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated summer readiness of alternating current offsite and alternate power systems on August 14, 2019.

External Flooding Sample (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated readiness to cope with external flooding on September 30, 2019.

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 emergency cooling system 11 on July 12, 2019
(2) Unit 2 Division III diesel generator on August 22, 2019
(3) Unit 2 high pressure core spray system on September 4, 2019
(4) Unit 1 emergency service water system 11 on September 12, 2019
(5) Unit 1 emergency diesel generator 103 on September 24, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (8 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 1 reactor building 237', emergency escape hatch room, fire area 1, on June 14, 2019
(2) Unit 1 reactor building 281', spent fuel pool cooling pump room, fire area 1, on June 14, 2019
(3) Unit 1 reactor building 237', north instrument room, fire area 1, on June 14, 2019
(4) Unit 1 reactor building 340', refuel floor, fire area 1, on June 14, 2019
(5) Unit 2 reactor building 215', 'A' reactor water cleanup pump room, fire area 34, on June 14, 2019
(6) Unit 2 reactor building 215', 'B' reactor water cleanup pump room, fire area 35, on June 14, 2019
(7) Unit 1 261' emergency diesel generator 103 room, fire area 19, on September 24, 2019
(8) Unit 1 261' power board 103 room, fire area 24, on September 24, 2019

71111.07T - Heat Sink Performance Triennial Review (IP Section 02.02)

The inspectors evaluated heat exchanger/sink performance on the following:

(1) Unit 1 reactor building closed loop 11 cooling heat exchanger
(2) Unit 1 ultimate heat sink
(3) Unit 2 'A' residual heat removal heat exchanger
(4) Unit 2 'B' low pressure core spray room cooler

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated Unit 1 operator performance during response to an oil leak on the feedwater pump 13 clutch actuator package on July 18, 2019.
(2) The inspectors observed and evaluated a Unit 2 downpower to 70 percent for a rod pattern adjustment and scram time testing on September 20, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)

(1) The inspectors observed and evaluated a Unit 1 simulator evaluation which included the inadvertent opening and failure to close of an electromatic relief valve, a high-power failure to scram, and a steam leak into primary containment on August 20, 2019.
(2) The inspectors observed and evaluated a Unit 2 simulator evaluation which included reactor power oscillations, a failure to scram, and an un-isolable steam line break in the turbine building on September 5, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Maintenance Rule Periodic Assessment - October 1, 2015 to September 30, 2017; completed on July 12, 2019
(2) Unit 2 instrument air system on August 2, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 1 emergent work associated with feedwater pump 13 actuator package oil leak on July 18, 2019
(2) Unit 1 emergent work associated with reactor recirculation pump 11 trip on August 6, 2019
(3) Unit 2 elevated risk condition during a severe thunderstorm warning followed by planned maintenance on the Division III diesel generator on August 21, 2019
(4) Unit 2 elevated risk condition during planned Division III diesel fuel injector replacements on September 4, 2019
(5) Unit 1 elevated risk during a 345-kilovolt Line 8 outage to support a grid repair on September 20, 2019
(6) Unit 1 elevated risk during planned emergency diesel generator 102 maintenance on September 25, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (6 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 2 service water system and supported systems following chemical evacuation treatment on July 16, 2019
(2) Unit 1 intermediate range monitors following trend in downscale indications on July 16, 2019
(3) Unit 1 high pressure coolant injection system during a 115-kilovolt grid disturbance on July 17, 2019
(4) Unit 1 containment spray raw water intertie valve 93-72 failure to fully open on July 25, 2019
(5) Unit 2 residual heat removal system during replacement of relief valve 2RHS*RV57A on August 27, 2019
(6) Unit 1 spent fuel pool Boraflex rack without one cell blocker installed on September 23, 2019

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post-maintenance tests:

(1) Unit 1 containment spray raw water pump strainer 93-06 maintenance on August 6, 2019
(2) Unit 2 Division III diesel generator crankcase pressure switch replacement on August 21, 2019
(3) Unit 1 conductivity monitor replacement on September 3, 2019
(4) Unit 2 Division III diesel generator fuel injector replacements on September 6, 2019
(5) Unit 1 emergency service water pump 12 replacement on September 12, 2019
(6) Unit 1 emergency condenser vent to torus block valve preventive maintenance on September 17, 2019
(7) Unit 1 emergency diesel generator 102 four-year preventive maintenance on September 27, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Inservice Testing (IP Section 03.01)

(1) N2-OSP-RHS-Q@005, RHR System Loop B Pump and Valve Operability Test, System Integrity Test and ASME XI Pressure Test, on July 3, 2019
(2) N1-ST-Q6C, Containment Spray System Loop 112 Quarterly Operability Test, on July 31, 2019
(3) N1-ST-Q6B, Containment Spray System Loop 121 Quarterly Operability Test, on August 7, 2019

FLEX Testing (IP Section 03.02) (1 Sample)

(1) S-PM-001, Flex 3419MX Water Pump Test, on August 14, 2019

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the conduct of a routine Exelon emergency preparedness drill on September 5, 2019.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) A Unit 1 simulator training evaluation which included the inadvertent opening and failure to close of an electromatic relief valve, a high-power failure to scram, a steam leak outside primary containment, and ultimately the declaration of a General Emergency on August 20,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Contamination and Radioactive Material Control (IP Section 02.03) (1 Sample)

The inspectors evaluated:

(1) Licensee processes for monitoring and controlling contamination and radioactive material by observing equipment and material leaving the radiologically controlled area, radiation protection technicians surveying equipment, and reviewing release procedures.

71124.02 - Occupational ALARA Planning and Controls

Radiological Work Planning (IP Section 02.01) (1 Sample)

The inspectors evaluated the licensees radiological work planning.

(1) The inspectors reviewed the following activities:

RWP NM-1-19-00506 Drywell Scaffold and ALARA Plan

RWP NM-1-19-00509 Drywell Main Steam Isolation Valve Activities and ALARA Plan

RWP NM-1-19-00518 Drywell In Service Inspection Activities and ALARA plan

RWP NM-1-19-00601 Reactor Building Reactor Water Clean Up System Maintenance Activities and ALARA Plan

RWP NM-1-19-00901 Reactor Disassembly/Reassembly and ALARA Plan

Implementation of ALARA and Radiological Work Controls (IP Section 02.03) (1 Sample)

The inspectors reviewed as low as reasonably achievable practices and radiological work controls.

(1) The inspectors reviewed the following activities:

RWP NM-1-19-00506 Drywell Scaffold and ALARA Plan Work in Progress Reviews and Post Job Review

RWP NM-1-19-00509 Drywell Main Steam Isolation Valve Activities and ALARA Plan Work in Progress Reviews and Post Job Review

RWP NM-1-19-00518 Drywell In Service Inspection Activities and ALARA plan Work in Progress Reviews and Post Job Review

RWP NM-1-19-00601 Reactor Building Reactor Water Clean Up System Maintenance Activities and ALARA Plan Work in Progress Reviews and Post Job Review

RWP NM-1-19-00901 Reactor Disassembly/Reassembly and ALARA Plan Work in Progress Reviews and Post Job Review

71124.04 - Occupational Dose Assessment

External Dosimetry (IP Section 02.02) (1 Sample)

(1) The inspectors evaluated the external dosimetry program implementation.

Special Dosimetric Situations (IP Section 02.04) (1 Sample)

The inspectors evaluated the following special dosimetric situation:

(1) The licensees implementation of requirements to manage radiation protection of declared pregnant workers for four workers, application of NRC-approved external dosimetry methods, and neutron dose assessments.

71124.07 - Radiological Environmental Monitoring Program

Site Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the radiological environmental monitoring program implementation.

(1) The inspectors reviewed the following:

Walkdowns, Calibrations, and Maintenance Record Review

The inspectors observed air sample collection at R1, R2, R3, R4, R5 and observed the thermoluminescent dosimeters (TLDs) at the same locations.

Environmental Sample Collections and Preparation Observation

The inspectors observed the collection of two milk samples and the preparation for shipment.

Licensee Actions in Response to Missed Sample, Inoperable Sampler, Lost TLD or Anomalous Measurement

The inspectors reviewed issue reports for power losses at a couple air monitor stations and a couple of lost environmental TLDs.

Sampling Program for the Potential of Licensed Material Entering Groundwater

The inspectors observed the condition of several monitoring wells to ensure maintenance is being maintained.

Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the Groundwater Protection Program. All tritium (H-3) sample results are less than 500 pCi/l.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1, July 1, 2018 - June 30, 2019
(2) Unit 2, July 1, 2018 - June 30, 2019

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1, July 1, 2018 - June 30, 2019
(2) Unit 2, July 1, 2018 - June 30, 2019

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1, July 1, 2018 - June 30, 2019
(2) Unit 2, July 1, 2018 - June 30, 2019

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (2 Samples)

(1) Unit 1, September 2018-August 2019
(2) Unit 2, September 2018-August 2019

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample.

(IP Section 02.16) (2 Samples)

(1) Unit 1, January 1, 2018-June 30, 2019
(2) Unit 2, January 1, 2018-June 30, 2019

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) IR 04234861, Evaluation of Local Leak Rate Type B and C Test Failures Associated with Isolation Valves During the 2019 Unit 1 Refueling Outage

71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)

(1) Unit 1 recirculation pump 11 trip due to degraded tachometer generator on August 4,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants

(1) The inspectors evaluated Nine Mile Point's independent spent fuel storage installation cask loadings on July 8-11, 2019. Specifically, the inspectors observed the following activities:

Fuel selection

Heavy load movement of the transfer cask and dry shielded canister

Decontamination of the transfer cask

Closure welding and non-destructive weld evaluations

Canister drying and helium backfill evolutions

Helium leak testing

Radiological field surveys

INSPECTION RESULTS

Failure to Obtain Station ALARA Committee Approval for a Dose Estimate Change Which Resulted in Collective Dose Greater Than 5 Person-Rem and Exceeding the Estimate by More Than 50 Percent Cornerstone Significance Cross-Cutting Aspect Report Section Occupational Radiation Safety

Green NCV 05000220/2019003-01 Open/Closed

[H.4] -

Teamwork 71124.02 The inspectors identified a finding and Green NCV of Technical Specification 6.4.1, "Administrative Controls, Procedures," for Exelon's failure to follow its procedure to maintain doses As Low As Reasonably Achievable (ALARA) during the most recent Unit 1 refueling outage. Specifically, Exelon did not follow procedure RP-AA-401, "ALARA Planning and Controls," and did not obtain Station ALARA Committee review when raising the dose estimate for drywell main steam isolation valve activities. This resulted in the dose estimate changing from a Category 1 to a Category 2 work activity, which required approval by the Station ALARA Committee in accordance with Exelon procedure RR-AA-401, ALARA Program, step 4.2.7(3). The site had additional exposure estimate increases, which resulted in the accumulated dose exceeding 5 person-Rem and exceeding the original estimate by greater than 50 percent.

Description:

Prior to the most recent refueling outage, Nine Mile Point Unit 1 had been experiencing a rising trend in unidentified leakage. It was determined during the outage that the cause was steam leakage from the main steam isolation valve IV-01-01 packing. A radiation work permit and ALARA plan were written to repair the valve. A work-in-progress (WIP) review was performed at 80 percent of the dose estimate and identified that an increase in the estimate was required due to the increase in work scope. The valve internals required repair by adding a weld overlay, and machining had to be performed to reassemble the valve. Subsequently, the dose estimate was revised from 2.900 person-rem to 3.526 person-rem. This exceeded the 3 person-rem level and raised the task from a Category 1 to a Category 2 per procedure RR-AA-401, step 4.1.3(6). Step 4.2.7(3) of the procedure states, "If a WIP Review results in a change in dose estimate from ALARA Category 1 to Category 2, then SAC [Station ALARA Committee] approval is required." This approval was not obtained when the dose estimate was revised to 3.526 person-rem, and as a result the total actual dose received from the activity was 7.651 person-rem which was greater than 5 person-rem and greater than 50 percent of the dose estimate.

Corrective Actions: Exelons immediate corrective actions included reviewing the lessons learned in the post-job review following the work and entering the issue into its corrective action program.

Corrective Action References: IR 04275201

Performance Assessment:

Performance Deficiency: The inspectors determined that Exelon failed to implement their ALARA procedure to obtain Station ALARA Committee approval when changing the dose estimate for drywell main steam isolation valve activities as required by RR-AA-401, step 4.2.7(3). This was a performance deficiency that was reasonably within Exelons ability to foresee and correct and should have been prevented.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Program & Process attribute of the Occupational Radiation Safety cornerstone and adversely affected the cornerstone objective to ensure the adequate protection of the worker health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation. The inspectors determined the performance deficiency was more than minor because it was associated with the Program & Process attribute of the Occupational Radiation Safety cornerstone.

Specifically, it adversely affected the cornerstone objective to ensure the adequate protection of the worker health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation. Additionally, this finding is similar to IMC 0612, Appendix E, Example 6.i. Specifically, the actual collective dose exceeded 5 person-rem and exceeded the planned, intended dose by more than 50 percent.

Significance: The inspectors assessed the significance of the finding using Appendix C, Occupational Radiation Safety SDP. The inspectors determined that this finding was of very low safety significance (Green) because the performance deficiency did not result in Exelons current 3-year rolling average collective dose exceeding 240 person-rem.

Cross-Cutting Aspect: H.4 - Teamwork: Individuals and work groups communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety is maintained. The work process includes the identification and management of risk commensurate with the work and the need for coordination with different groups or job activities. Exelon's ALARA WIP review process and increase in the dose estimate was not reviewed and approved by Station ALARA Committee and caused the accumulated dose to be greater than 50 percent of the revised estimate for the task.

Enforcement:

Violation: Technical Specification 6.4.1, requires, in part, that written procedures be established, implemented, and maintained as required by NRC Regulatory Guide 1.33, Appendix A, November 3, 1972,Section I.5(b), "Factors to be taken into account in preparing the detailed work procedures, including the necessity for minimizing radiation exposure to workmen." Exelon procedure RR-AA-406, "ALARA Planning and Controls," requires Station ALARA Committee approval for work activities with dose estimates greater than or equal to 3 person-rem. Contrary to the above, Exelon failed to follow the procedural requirement to obtain Station ALARA Committee approval for a dose estimate revision greater than 3 person-rem.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Observation: Unit 1 Local Leak Rate Test Failures 71152 A series of primary containment valves and reactor coolant system pressure isolation valves did not meet Exelons local leak rate testing acceptance criteria during the Unit 1 refueling outage in the spring of 2019. Exelon generated issue reports to identify and resolve the issues. IR 04234861, as well as IR 04237553, captured several of the local leak rate test failures.

The inspectors reviewed the issue reports, the results of the local leak rate tests, and associated corrective actions to verify the site was in compliance, adequately identified issues, and initiated corrective actions. Depending on the severity of the leak rate, Exelon took corrective actions to make changes to preventative maintenance frequency, performed engineering evaluations to remove conservatism in the permitted leak late, or repaired the valve.

The inboard steam supply emergency condenser isolation valves, IV 39-09R and IV 39-10R, failed the local leak rate test, as detailed in IRs 04230591 and 04232618, respectively.

Exelon subsequently repaired the condition, which included having to split the valve stem nut, perform post-maintenance testing, and return the valves to operable status. Inspectors challenged the duration of the IV 39-09R and IV 39-10R inoperabilty after identifying that a past operability evaluation was not in the respective IRs and, therefore, a review of reportability was not performed. Exelon performed a past operability evaluation and determined the valves did not have an extended period of inoperability because IV 39-09R and 39-10R passed the most recent surveillance tests on March 14, 2019, and January 30, 2019, respectively. The inspectors determined there was reasonable assurance that these valves were capable of fulfilling their intended functions while the plant was operating.

The inspectors independently evaluated the issues of concern in accordance with the guidance in IMC 0612, Appendix B, "Issue Screening," and Appendix E, "Examples of Minor Violations." As a result, no violations or performance deficiencies were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 23, 2019, the inspectors presented the integrated inspection results to Mr. Peter Orphanos, Site Vice President, and other members of the licensee staff.

On July 11, 2019, the inspectors presented the Independent Spent Fuel Storage Installation inspection results to Mr. Todd Tierney, Plant Manager, and other members of the licensee staff.

On August 8, 2019, the inspectors presented the Triennial Heat Sink Performance inspection results to Mr. Peter Orphanos, Site Vice President, and other members of the licensee staff.

On September 19, 2019, the inspectors presented the Radiological Environmental Monitoring Program inspection results to Mr. Matthew Bush, Maintenance Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

04056415

04056415

264985

Procedures

N1-IPM-110-001

Sample Conductivity Calibration

00500

N1-SOP-33A.3

Major 115 KV Grid Disturbances

201

N2-MSP-GEN-

V001

Revetment Ditch Structure Inspection

00501

N2-OP-70

Station Electric Feed and 115kv Switchyard

2400

N2-SOP-70

Major Grid Disturbances

00400

OP-NM-108-107-

1002

Off-Site Power Operations and Interface

004

WC-NM-8003-

1012

Nine Mile Point Nuclear Station Units 1 and 2 Nuclear Plant

Interface Requirements (NPIRs)

Work Orders

C92770203

71111.04Q Corrective Action

Documents

04107700

236901

258410

258431

Drawings

C-18017-C,

Sheet 1

Emergency Cooling System P&I Diagram

56.01

C-18022-C,

Sheet 1

Service Water, Reactor and Turbine Buildings P&I Diagram

Procedures

N1-OP-13

Emergency Cooling System

04300

N1-OP-18

Service Water System

04400

N1-OP-45

Emergency Diesel Generators

04800

N2-OP-100B

HPCS Diesel Generator

2700

N2-OP-100B-

LINEUPS

HPCS Diesel Generator - LINEUPS

200

N2-OP-33

High Pressure Core Spray System

01700

N2-OP-33-

HPCS System - LINEUPS

00100

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LINEUPS

71111.05Q Procedures

N1-PFP-0101

Unit 1 Pre-Fire Plans

00500

71111.07T

Corrective Action

Documents

4182503

Miscellaneous

673606

Nine Mile Point Unit 2 Forebay Silt Mapping Report

2/28/2018

N2-TTP-RHS-

4Y003

Residual Heat Removal System Heat Exchanger

Performance Monitoring Test

Performed

2/12/2016

Procedures

ER-AA-340-1001

GL 89-13 Program Implementation Instructional Guide

71111.11Q Procedures

N2-OSP-RMC-

@001

Control Rod Drive Scram Insertion Time Testing

2500

N2-SOP-30

Control Rod Drive Failures

00500

NF-AB-720-F-1

Control Rod Sequence Review and Approval Sheet

71111.12

Corrective Action

Documents

04195955

04196529

04196538

200048

214686

223198

226384

Miscellaneous

CFR 50.65

(a)(3)

Maintenance Rule Periodic Assessment

October 1,

2015 to

September 30,

2017

Work Orders

C93536085

C93536250

C93687564

C93695810

C93696635

C93697980

71111.13

Corrective Action

Documents

265049

265299

265764

269525

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Drawings

B-18023-C,

Sheet 1

Shaft Driven Reactor Feedwater Pump #13 Gear and

Clutch Oil P&I Diagram

Procedures

N1-ARP-F2

Control Room Panel F2

200

N1-OP-1

Nuclear Steam Supply System

075T1

N1-OP-16

Feedwater System Booster Pump to Reactor

06700

N1-OP-43B

Normal Power Operations

2500

N1-SOP-1.3

Recirc Pump Trip at Power

00400

N2-OP-102

Meteorological Monitoring

2600

OP-NM-108-117

Protected Equipment Program at Nine Mile Point

00500

WC-AA-101

On-Line Work Control Process

Work Orders

C93710586

C93716460

71111.15

Corrective Action

Documents

255747

262272

262316

263602

263911

264027

264036

264279

264283

264399

264985

265111

266278

271674

274661

278008

Drawings

PID-31A

Piping and Instrumentation Diagram Residual Heat

Removal System

Procedures

N1-OP-16

Feedwater System Booster Pump to Reactor

06700

N1-OP-33A

115 KV System

03300

N1-OP-38B

Intermediate Range Monitor

2100

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

N1-SOP-33A.3

Major 115 KV Grid Disturbances

201

N2-OP-11

Service Water System

01400

N2-PM-@11

SWP Mullusk Biocide Treatment (System Alignment and

Valve Control)

00700

Work Orders

C93576635

C93676790

71111.19

Drawings

C-18012-C,

Sheet 1

Reactor Containment Spray Raw Water System P&I

Diagram

C-18012-C,

Sheet 2

Reactor Containment Spray Raw Water System P&I

Diagram

Procedures

N1-ST-M4A

Emergency Diesel Generator 102 and PB [power board]

2 Operability Test

2500

N1-ST-Q13

Emergency Service Water Pump and Check Valve

Operability Test

2100

N1-ST-Q5

Primary Containment Isolation Valves Operability Test

03400

N2-OP-100B

HPCS Diesel Generator

2700

N2-OSP-EGS-

M@002

Diesel Generator and Diesel Air Start Valve Operability Test

- Division III

2300

S-EPM-GEN-067

Limitorque MOV Actuator PM

00800

Work Orders

C92535400

C93587063

C93635628

C93667492

C93667768

C93677587

C93703618

C93717108

C93717187

C93721801

71111.22

Procedures

CC-NM-118-101

Beyond Design Basis Administrative Controls

00400

N1-ST-Q6B

Containment Spray System Loop 121 Quarterly Operability

Test

01600

N1-ST-Q6C

Containment Spray System Loop 112 Quarterly Operability

01800

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Test

N2-OSP-RHS-

Q@005

RHR System Loop B Pump and Valve Operability Test,

System Integrity Test and ASME XI Pressure Test

01300

S-PM-001

Flex 3419MX Water Pump Test

200

Work Orders

C93667166

C93670946

71114.06

Procedures

EP-CE-111

Emergency Classification and Protective Action

Recommendations

EP-CE-114-100-

F-05

Part 1 Notification Fact Sheet

G

71124.01

Corrective Action

Documents

249395

254827

265123

267023

Procedures

NISP-RP-002

Radiation and Contamination Surveys

NISP-RP-004

Radiological Posting and Labeling

NISP-RP-005

Access Controls for High Radiation Areas

Radiation Work

Permits (RWPs)

NM-1-19-00506

Dry Well Scaffold

NM-1-19-00509

Drywell MSIV Activities

NM-1-19-00518

Drywell ISI Activities

NM-1-19-00601

Reactor Building RWCU System Maintenance Activities

NM-1-19-00901

Reactor Disassembly/Reassembly

71124.02

Corrective Action

Documents

249516

265156

Procedures

RP-AA-406

Occupational ALARA Planning and Controls

71124.04

Corrective Action

Documents

248516

Procedures

RP-AA-203

Exposure Control and Authorization

RP-AA-210

Dosimetry Issue, Usage, and Control

RP-AA-232

Operation of the Whole Body Counter (WBC) using APEX-

INVIVO

RP-AA-250

External Dose Assessments from Contamination

RP-AA-270

Prenatal Radiation Exposure

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.07

Corrective Action

Documents

Resulting from

Inspection

280602

Groundwater Monitoring Wells

September 19,

2019

280617

R1 Air Station

September 19,

2019

280625

Eberline Radiation Monitor

September 19,

2019

Procedures

CY-AA-170-000

Radioactive Effluent and Environmental Monitoring

Programs

CY-AA-170-100

Radiological Environmental Monitoring Program

CY-NM-170-101

Environmental Air Monitoring Sample Collection

CY-NM-170-102

Radiological Sample Collection, Processing and Shipment,

Land Use Census and Quality Control (Vendor Procedure)

EN-AA-408

Radiological Groundwater Protection Program

S-ENVSP-4.3

Environmental Air Monitoring Station Inspection and

Maintenance

00601

71151

Procedures

ER-AA-2008

Mitigating Systems Performance Index (MSPI) Monitoring

and Margin Evaluation

NEI 99-02

Regulatory Assessment Performance Indicator Guideline

71152

Corrective Action

Documents

230591

230937

231860

231867

232255

232357

232473

232618

232897

234861

235453

235965

236035

237039

Drawings

C-18006-C

Drywell & Torus Isolation & Blocking Valves P & I Diagram

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C-18017-C

Emergency Cooling System P & I Diagram

Miscellaneous

NRC Information Notice 2010-03

Failure of Motor-Operated Valves Due to Degraded Stem

Lubricant

February 3,

2010

Procedures

N1-MMP-068-

251

Maintenance of Containment Vacuum Relief Valves

00701

N1-ST-TYC-001

MSIV Type C Leak Rate Tests

200

N1-ST-TYC-005

Emergency Condenser Type C Leak Rate Tests

00100

N1-ST-TYC-008

Torus Vacuum Relief Valve Type C Leak Rate Tests

00000

N1-ST-TYC-026

Loop 11 and 12 Steam Line Drain 1st and 2nd Isolation

Valves Type C Leak Rate Tests

00000

N1-TSP-201-550

Local Leak Rate Test Summary (Type B and C Tests) For

10CFR50 Appendix J and Secondary Containment Bypass

Leakage

01400

Work Orders

C93321759

C93620060

C93628030

C93701790

C93702441

C93702637

C93703870