February 12, 2020

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT 1 - POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE 4 REPORT 05000220/2019012

Dear Mr. Hanson:

On December 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station, Unit 1. On January 17, 2020, the NRC inspectors discussed the results of this inspection with Mr. Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety

Docket No. 05000220 License No. DPR-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000220

License Number:

DPR-63

Report Number:

05000220/2019012

Enterprise Identifier: I-2019-012-0003

Licensee:

Exelon Generation Company, LLC

Facility:

Nine Mile Point Nuclear Station, Unit 1

Location:

Oswego, NY

Inspection Dates:

December 16, 2019 to December 20, 2019

Inspectors:

N. Floyd, Senior Reactor Inspector

K. Mangan, Senior Reactor Inspector

A. Turilin, Reactor Inspector

Approved By:

Mel Gray, Chief

Engineering Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Post-Approval Site Inspection for License Renewal - Phase 4 at Nine Mile Point Nuclear Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal

The team conducted a Phase IV license renewal inspection. The team selected seven aging management programs for evaluation based on risk insights and programs that were enhanced or new under the renewed operating license. The team also considered for selection those programs with monitoring results that were performed for the first time or those that identified examination or test results not experienced in the past. For the aging management programs selected, the team reviewed records, interviewed plant staff, and conducted plant walk downs to evaluate whether aging management program elements were being implemented in accordance with NRC requirements. The team evaluated the following elements of the aging management programs: scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.

The following aging management programs were evaluated by the team:

Post-Approval Site Inspection for License Renewal===

(1) Buried Piping and Tanks Inspection Program
(2) Compressed Air Monitoring Program
(3) Fire Water System Program
(4) Flow-Accelerated Corrosion Program
(5) Preventive Maintenance Program
(6) Selective Leaching of Materials Program
(7) Structures Monitoring Program

INSPECTION RESULTS

Observation: Limitations of Selective Leaching Aging Management Program 71003 The team noted that the procedure utilized by Exelon staff for the one-time inspection of selective leaching provided limited guidance on the acceptance criteria for visual examination and hardness testing. These one-time inspections were completed in 2009 before the plant entered its period of extended operation. The procedure stated, any evidence of selective leaching, such as discoloration, validated by a hardness test shall be considered a failure of acceptance criteria. This criterion does not provide the staff with specific quantitative or qualitative criteria. Additionally, the team observed hardness testing was utilized in only a few instances. However, the team acknowledged that this met the standard in place at that time as described in the license renewal application. The licensee stated to the team that there has not been internal operating experience indicating failures due to or the presence of selective leaching in components at Nine Mile Point, Unit

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 17, 2020, the inspectors presented the Post-Approval Site Inspection for License Renewal - Phase 4 results to Peter Orphanos, Site Vice President, and other members of the licensee staff.
  • On December 20, 2019, the inspectors presented the preliminary inspection results to Todd Tierny, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71003

Corrective Action

Documents

2030344

2045808

2048171

2470248

2585113

03989223

03991903

04068720

04081009

04166003

04170930

04172797

218137

259835

288235

297999

2012-010258

CR-2012-003210

Miscellaneous

09-0170-TR-001

Flow Accelerated Corrosion Program CHECWORKS' SFA

Version 3.0 Model Calibration

2/18/2017

EA Project No.

63143.15

Fourth Quarter Groundwater Monitoring Report 2019

10/29/2019

LSL Project ID

1906124

Life Science Laboratories, Laboratory Analysis for NMPNS

05/01/2019

OE-2011-002994

Operating Experience Barrier Analysis for NRC IN 2011-20

related to ASR

Revision 0

Structural

Monitoring

Program

Nine Mile Point Nuclear Station, LLC - Unit 1 2017 Biennial

Report

05/25/2018

Procedures

CC-AA-211

Fire Protection Program

Revision 8

CNG-CM-6.01-

One-time Inspection of Mechanical Systems Aging

Revision 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1000

Management Program

CNG-FES-004

One-Time Inspection Methodology

Revision 0

ER-AA-430

Conduct of Flow Accelerated Corrosion Activities

Revision 8

ER-AA-5400

Underground (Buried) Piping and Raw Water Integrity

Management Programs Guide

Revision 11

GAP-HSC-02

System Aging Inspection and Cleanness Controls

Revision

2000

N1-FST-FPG-

C002

Halon System Functional Test

Revision

01400

N1-FST-FPW-

5A001

Fire Protection Water System Flow Test

Revision

00500

N1-FST-FPW-

A005

Fire System Valve Cycling

00700

N1-FST-FPW-

A011

Fire Hydrant Inspection and System Flush

Revision

00600

N1-FST-FPW-

C004

Fire System Sprinkler Alarm Test

Revision

01500

NDEP-VT-2.01

ASME Section XI Visual Examination

Revision 18

S-MRM-REL-

0102

Structural Monitoring Program

Revision

0100

Self-Assessments AMP

AMP Effectiveness Review for Compressed Air Monitoring

Program

2/15/2019

AMP

AMP Effectiveness Review for Preventive Maintenance

2/08/2019

AMP

AMP Effectiveness Review for Fire Water System Program

2/21/2019

AMP XI.M17

AMP Effectiveness Review for Flow-Accelerated Corrosion

Program

11/22/2019

AMP XI.M34

AMP Effectiveness Review for Buried Piping and Tanks

Inspection Program

11/01/2019

Work Orders

07-01302

07-02203

07-16397

C90974581

C91109609

C92693917

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C93589384

C93589384

C93590061

C93620450

C93644781

C93689298