February 12, 2020
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 1 - POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE 4 REPORT 05000220/2019012
Dear Mr. Hanson:
On December 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station, Unit 1. On January 17, 2020, the NRC inspectors discussed the results of this inspection with Mr. Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety
Docket No. 05000220 License No. DPR-63
Enclosure:
As stated
Inspection Report
Docket Number:
05000220
License Number:
Report Number:
Enterprise Identifier: I-2019-012-0003
Licensee:
Exelon Generation Company, LLC
Facility:
Nine Mile Point Nuclear Station, Unit 1
Location:
Oswego, NY
Inspection Dates:
December 16, 2019 to December 20, 2019
Inspectors:
N. Floyd, Senior Reactor Inspector
K. Mangan, Senior Reactor Inspector
A. Turilin, Reactor Inspector
Approved By:
Mel Gray, Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Post-Approval Site Inspection for License Renewal - Phase 4 at Nine Mile Point Nuclear Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71003 - Post-Approval Site Inspection for License Renewal
The team conducted a Phase IV license renewal inspection. The team selected seven aging management programs for evaluation based on risk insights and programs that were enhanced or new under the renewed operating license. The team also considered for selection those programs with monitoring results that were performed for the first time or those that identified examination or test results not experienced in the past. For the aging management programs selected, the team reviewed records, interviewed plant staff, and conducted plant walk downs to evaluate whether aging management program elements were being implemented in accordance with NRC requirements. The team evaluated the following elements of the aging management programs: scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.
The following aging management programs were evaluated by the team:
Post-Approval Site Inspection for License Renewal===
- (1) Buried Piping and Tanks Inspection Program
- (2) Compressed Air Monitoring Program
- (3) Fire Water System Program
- (4) Flow-Accelerated Corrosion Program
- (5) Preventive Maintenance Program
- (6) Selective Leaching of Materials Program
- (7) Structures Monitoring Program
INSPECTION RESULTS
Observation: Limitations of Selective Leaching Aging Management Program 71003 The team noted that the procedure utilized by Exelon staff for the one-time inspection of selective leaching provided limited guidance on the acceptance criteria for visual examination and hardness testing. These one-time inspections were completed in 2009 before the plant entered its period of extended operation. The procedure stated, any evidence of selective leaching, such as discoloration, validated by a hardness test shall be considered a failure of acceptance criteria. This criterion does not provide the staff with specific quantitative or qualitative criteria. Additionally, the team observed hardness testing was utilized in only a few instances. However, the team acknowledged that this met the standard in place at that time as described in the license renewal application. The licensee stated to the team that there has not been internal operating experience indicating failures due to or the presence of selective leaching in components at Nine Mile Point, Unit
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 17, 2020, the inspectors presented the Post-Approval Site Inspection for License Renewal - Phase 4 results to Peter Orphanos, Site Vice President, and other members of the licensee staff.
- On December 20, 2019, the inspectors presented the preliminary inspection results to Todd Tierny, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71003
Corrective Action
Documents
2030344
2045808
2048171
2470248
2585113
03989223
03991903
04068720
04081009
04166003
04170930
04172797
218137
259835
288235
297999
2012-010258
CR-2012-003210
Miscellaneous
09-0170-TR-001
Flow Accelerated Corrosion Program CHECWORKS' SFA
Version 3.0 Model Calibration
2/18/2017
EA Project No.
Fourth Quarter Groundwater Monitoring Report 2019
10/29/2019
LSL Project ID
1906124
Life Science Laboratories, Laboratory Analysis for NMPNS
05/01/2019
OE-2011-002994
Operating Experience Barrier Analysis for NRC IN 2011-20
related to ASR
Revision 0
Structural
Monitoring
Program
Nine Mile Point Nuclear Station, LLC - Unit 1 2017 Biennial
Report
05/25/2018
Procedures
Revision 8
CNG-CM-6.01-
One-time Inspection of Mechanical Systems Aging
Revision 0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1000
Management Program
CNG-FES-004
One-Time Inspection Methodology
Revision 0
Conduct of Flow Accelerated Corrosion Activities
Revision 8
Underground (Buried) Piping and Raw Water Integrity
Management Programs Guide
Revision 11
GAP-HSC-02
System Aging Inspection and Cleanness Controls
Revision
2000
N1-FST-FPG-
C002
Halon System Functional Test
Revision
01400
N1-FST-FPW-
5A001
Fire Protection Water System Flow Test
Revision
00500
N1-FST-FPW-
A005
Fire System Valve Cycling
00700
N1-FST-FPW-
A011
Fire Hydrant Inspection and System Flush
Revision
00600
N1-FST-FPW-
C004
Fire System Sprinkler Alarm Test
Revision
01500
NDEP-VT-2.01
ASME Section XI Visual Examination
Revision 18
S-MRM-REL-
0102
Structural Monitoring Program
Revision
0100
Self-Assessments AMP
AMP Effectiveness Review for Compressed Air Monitoring
Program
2/15/2019
AMP Effectiveness Review for Preventive Maintenance
2/08/2019
AMP Effectiveness Review for Fire Water System Program
2/21/2019
AMP XI.M17
AMP Effectiveness Review for Flow-Accelerated Corrosion
Program
11/22/2019
AMP XI.M34
AMP Effectiveness Review for Buried Piping and Tanks
Inspection Program
11/01/2019
Work Orders
07-01302
07-02203
07-16397
C90974581
C91109609
C92693917
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
C93589384
C93589384
C93590061
C93620450
C93644781
C93689298