| Start date | Site | Title | Topic |
---|
ML23292A171 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 11, Section 11.2, Liquid Waste Management Systems | Grab sample Anticipated operational occurrence |
ML23292A149 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 11, Section 11.5, Process and Effluent Radiological Monitoring and Sampling Systems | Grab sample Anticipated operational occurrence Control Room Habitability |
ML23270A956 | 29 September 2023 | | Full Materials License Signature Authority for Laura B. Cender for All Categories of Materials Licenses Including But Not Limited to: Broad Scope Use (Academic, Research and Development, Veterinary and In-Vitro - Testing, Nuclear Pharmacies | License Renewal Brachytherapy |
ML23241A914 | 23 August 2023 | | T180-13 Effective 2021-04-05 Highlighted | Incorporated by reference Condition Adverse to Quality Exclusive Use Depleted uranium |
ML23241A917 | 23 August 2023 | | T180-13 Effective 2022-11-02 Highlighted | Incorporated by reference Condition Adverse to Quality Exclusive Use Depleted uranium |
ML21230A318 | 30 April 2023 | | DG 8061 (RG 8.39 Rev 2) Release of Patients Administered Radioactive Material | Brachytherapy Eye plaque |
ML23110A202 | 10 April 2023 | Peach Bottom | 9 to Updated Final Safety Analysis Report, Chapter 9, Radioactive Waste Systems, Sections 1 Thru 4 | Loop seal Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Earthquake Fuel cladding |
ML22249A138 | 31 August 2022 | SHINE Medical Technologies | Shine Technologies, LLC Final Safety Analysis Report, Chapter 11, Rev. 5, Radiation Protection Program and Waste Management | High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Unidentified leakage |
ML22243A213 | 30 August 2022 | | New Mexico Regulations Title 20 Chapter 3 Part 3 (Amended) | Incorporated by reference Decommissioning Funding Plan Authorized possession limits License Renewal Static Eliminator Depleted uranium |
ENS 55927 | 3 June 2022 04:00:00 | Hackensack University Medical Center | Lost COPPER-64 Radiopharmaceutical | Moisture Density Gauge |
ML22067A196 | 8 March 2022 | | Washington Regulations Ch 246-232 | License Renewal Depleted uranium |
ML22066A310 | 4 March 2022 | | CRCPD Part T | Exclusive Use Depleted uranium |
ML22034A625 | 26 January 2022 | SHINE Medical Technologies | Shine Technologies, LLC, Application for Operating License Supplement 14, Revision to Final Safety Analysis Report, Chapter 11, Radiation Protection Program and Waste Management | High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Unidentified leakage |
ENS 55702 | 10 December 2021 06:00:00 | Curium Us Llc | NON-AGREEMENT State Report - Lost Packages in Transit | Moisture Density Gauge |
ML21326A168 | 22 November 2021 | | Draft Revision 2 of Regulatory Guide 8.39, Release of Patients Administered Radioactive Material, for ACMUI Review | B.5.b Eye plaque |
ML21294A261 | 12 October 2021 | Susquehanna | 0 to Updated Final Safety Analysis Report, Section 11.2, Liquid Waste Management Systems | Grab sample Anticipated operational occurrence |
ML21294A246 | 12 October 2021 | Susquehanna | 0 to Updated Final Safety Analysis Report, Section 11.5, Process and Effluent Radiological Monitoring and Sampling Systems | Grab sample Anticipated operational occurrence Control Room Habitability |
ML21222A220 | 9 August 2021 | Nuclear Energy Institute | Comment (1) of Kati R. Austgen on Use of Plant Parameter Envelope in Early Site Permit Applications for Nuclear Power Plants | Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Incorporated by reference License Renewal Earthquake Pre-application |
ML21195A033 | 14 July 2021 | Calvert Cliffs | Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Pandemic COVID-19 Tritium Power change Siren |
ML21193A320 | 7 July 2021 | | Nd Chapter 33.1-10-13.1 | Incorporated by reference Condition Adverse to Quality Uranium Hexafluoride Exclusive Use Depleted uranium |
ML21182A357 | 29 June 2021 | | 2021 Consolidated NRC Impep Review Response to Questionnaire | License Renewal Exemption Request Coronavirus COVID-19 Generic Issues Program Moisture Density Gauge Troxler Depleted uranium Reactive Inspection |
ML21179A041 | 21 June 2021 | Dresden | 4 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Safe Shutdown Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Tornado Generated Missile Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Code Reconciliation Fuel cladding Accidental discharge Loss of condenser vacuum |
ML21132A286 | 12 May 2021 | Pilgrim | Annual Radioactive Effluent Release Report (January-December 2020) | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
NL-21-029, Offsite Dose Calculation Manual (Odcm), Revision 5 | 30 April 2021 | Indian Point | Offsite Dose Calculation Manual (Odcm), Revision 5 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
JAFP-21-0033, Submittal of 2020 Annual Radioactive Effluent Release Report | 30 April 2021 | FitzPatrick | Submittal of 2020 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program COVID-19 Power change |
ML21133A108 | 29 April 2021 | Limerick | 0 to Updated Final Safety Analysis Report, Chapter 11, Sections 11.1 Through 11.5 | Safe Shutdown Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Met Tower Process Control Program Stress corrosion cracking Excess Flow Check Valve Main Steam Line Radiation Monitor Fuel cladding Accidental discharge |
ML21119A293 | 29 April 2021 | Wolf Creek | 2020 Annual Radioactive Effluent Release Report - Report 44 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Commercial Grade Power change |
ML21118A878 | 29 April 2021 | Peach Bottom | Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report 63 January 1, 2020 Through December 31, 2020 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program COVID-19 Power change |
AEP-NRC-2021-27, Annual Radioactive Effluent Release Report | 28 April 2021 | Cook | Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Pandemic COVID-19 Power change Downpower Unidentified leak |
GNRO-2021/00015, Annual Radioactive Effluent Release Report | 28 April 2021 | Grand Gulf | Annual Radioactive Effluent Release Report | High Radiation Area Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium Power change |
WBL-21-019, 2020 Annual Radioactive Effluent Release Report | 28 April 2021 | Watts Bar | 2020 Annual Radioactive Effluent Release Report | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Tritium Producing Burnable Absorber Rods Grace period Power change |
ML21127A150 | 27 April 2021 | San Onofre | (Songs), Units 1, 2 and 3 - Annual Radioactive Effluent Release Report - 2020 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Chernobyl |
PLA-7927, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 | 26 April 2021 | Susquehanna | Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change Operability Assessment Power Uprate |
L-21-111, Annual Environmental and Effluent Release Report | 26 April 2021 | Perry | Annual Environmental and Effluent Release Report | Time of Discovery Grab sample Offsite Dose Calculation Manual Hydrostatic Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Fuel cladding Power change |
ML21175A239 | 21 April 2021 | Kewaunee | 2020 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML21111A179 | 21 April 2021 | Palisades | 2020 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium Power change |
ML21109A051 | 8 April 2021 | Peach Bottom | 8 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Through 4 | Loop seal Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Earthquake Fuel cladding |
ML21095A223 | 23 March 2021 | SHINE Medical Technologies | Shine Medical Technologies, LLC, Revisions to Final Safety Analysis Report, Chapter 11, Rev. 3, Radiation Protection Program and Waste Management | High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Unidentified leakage |
ML21095A229 | 23 March 2021 | SHINE Medical Technologies | Shine Medical Technologies, LLC, Response to Request for Additional Information and Supplement No. 7 | High Radiation Area Control of Heavy Loads |
ML21055A080 | 2 February 2021 | Fermi 07200071 | 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Main Steam Line Radiation Monitor Earthquake Hardened vent Power Uprate Measurement Uncertainty Recapture |
ML21055A069 | 2 February 2021 | Fermi 07200071 | 3 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Abnormal operational transient Feedwater Heater Intergranular Stress Corrosion Cracking Feedwater Controller Failure Main Steam Line Radiation Monitor Earthquake Fuel cladding Recently irradiated fuel Fire Protection Program Power change Power Uprate Measurement Uncertainty Recapture Failure to Scram Overspeed GNF3 Loss of condenser vacuum |
ML21039A275 | 27 January 2021 | Grand Gulf | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Water Inventory Control Hydrostatic Annual Radioactive Effluent Release Report Feedwater Heater Process Control Program Earthquake Power-Operated Valves Fuel cladding Power Uprate |
ML21039A338 | 27 January 2021 | Grand Gulf | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Water Inventory Control Hydrostatic Annual Radioactive Effluent Release Report Feedwater Heater Process Control Program Earthquake Power-Operated Valves Fuel cladding Power Uprate |
ML20311A657 | 4 November 2020 | Three Mile Island | Supplemental Information Regarding License Amendment Request - Proposed Changes to the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition | Time of Discovery High winds Offsite Dose Calculation Manual Safeguards Contingency Plan License Renewal Exemption Request Earthquake Grace period |
BW210028, CY-BR-170-301, Revision 11, Offsite Dose Calculation Manual (ODCM) | 31 October 2020 | Braidwood | CY-BR-170-301, Revision 11, Offsite Dose Calculation Manual (ODCM) | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent Power change Power Uprate |
ML20281A374 | 1 October 2020 | | Code of Colorado Regulations, Co Final Regulations Part 3 | Safe Shutdown Incorporated by reference Decommissioning Funding Plan Authorized possession limits License Renewal Depleted uranium |
ML20268A133 | 11 September 2020 | Saint Lucie | Amendment 26 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report Fuel cladding Pressure Boundary Leakage GOTHIC Power Uprate |
ML20261H508 | 3 September 2020 | | Nd Regulations 33.1-10-13.1 | Incorporated by reference Condition Adverse to Quality Uranium Hexafluoride Exclusive Use Depleted uranium |
NUREG-0016, Revision 2 Calculation of Release of Radioactive Materials in Gaseous and Liquid Effluents from Boiling-Water Reactors GALE-BWR 3.2 Code | 31 July 2020 | | NUREG-0016, Revision 2 Calculation of Release of Radioactive Materials in Gaseous and Liquid Effluents from Boiling-Water Reactors GALE-BWR 3.2 Code | Anticipated operational occurrence Feedwater Heater Fuel cladding Power Uprate |
L-21-135, ODCM: Liquid Effluents | 17 July 2020 | Beaver Valley | ODCM: Liquid Effluents | Offsite Dose Calculation Manual Power Uprate |