| | Start date | Site | Title | Topic |
|---|
| ML25345A111 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-015, Rev. 0, Building Surface Dcgl Values | |
| ML25345A130 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-063, Rev. 0, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways | |
| ML25345A112 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-004, Rev. 0, Resrad Building Surface Dcgl Values | |
| ML25345A113 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-006, Rev. 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures | |
| ML25345A114 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-007, Rev. 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario | |
| ML25345A115 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-008, Rev. 0, Derived Concentration Guideline Levels Values for Soil - Industrial Use Scenario | |
| ML25345A116 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-009, Rev. 0, Area Factors for Soil - Industrial Use Scenario | |
| ML25345A117 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-012, Rev. 0, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25345A118 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-013, Rev. 1, Basement Fill Model: Calculation of Dcgl W/F Values Assuming Industrial Use of Scenario Exposure Pathways | |
| ML25345A119 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-014, Rev. 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario | |
| ML25345A124 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-015, Rev. 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values | |
| ML25345A125 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-016, Rev. 0, Calculation of Buried Pipe Dcgl Values | |
| ML25345A129 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-055, Rev. 0, Basement Fill Model: Probabilistic Analyses for the Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25345A133 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-081, Rev. 2, Groundwater Dose Calculation Methodology to Support the License Termination Plan | |
| ML25345A138 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-085, Rev. 0, Probabilistic Dose Comparisons: Building Occupancy Scenario Vs. Room Renovation Scenario | |
| ML25345A139 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-089, Rev. 0, Soil Dcgl Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A140 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-090, Rev. 0, Soil Dcgl Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A141 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-091, Rev. 0, Bfm Dcgl W/F Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A142 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-092, Rev. 0, Bfm Dcgl W/F Values Assuming the Residential Scenario with a Drinking Water Pathway | |
| ML25345A143 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-093, Rev. 0, Bfm Dcglep Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A144 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-096, Rev. 0, Bfm Dcglep Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A145 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-101, Rev. 0, Dcglbp Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A149 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-102, Rev. 0, Dcglbp Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A150 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-103, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Dcgl Values for Surface Soil | |
| ML25345A151 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-105, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Bfm Dcglw/F Values | |
| ML25345A152 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-107, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Bfm Dcglep Values | |
| ML25345A153 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-108, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Bfm Dcglbp Values | |
| ML25280A138 | 1 October 2025 | Oregon State University | Forwards Oregon State University Triga Reactor (OSTR) Annual Report for Period July 2024 Through June 30, 2025 | Earthquake |
| ML25260A626 | 26 September 2025 | Erwin | Enclosure 3 NFS Amendment 24 Safety Evaluation Report (Public) | |
| W3F1-2025-0046, Resubmittal of Annual Radiological Environmental Operating Report (AREOR) - 2024 | 25 September 2025 | Waterford | Resubmittal of Annual Radiological Environmental Operating Report (AREOR) - 2024 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Spill |
| ML25153A180 | 10 September 2025 | Washington State University | Examination Report Letter No. 50-027/OL-25-01, Washington State University | Shutdown Margin High Radiation Area Earthquake Fuel cladding Power change |
| ML25246A660 | 27 August 2025 | BWX Technologies | BWXT Nuclear Operations Group, Inc. - Semi-Annual Effluent Monitoring Report | |
| ML25237A035 | 18 August 2025 | Erwin | Nuclear Fuel Services, Inc., Biannual Effluent Monitoring Report January to June 2025 | |
| ML25177A137 | 25 June 2025 | | FOIA-2025-000430 - Released Set | Spill |
| ML25135A008 | 15 May 2025 | Kewaunee | 2024 Annual Radiological Environmental Operating Report | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Spill |
| L-2025-092, Annual Radiological Environmental Operating Report (2024) | 15 May 2025 | Turkey Point | Annual Radiological Environmental Operating Report (2024) | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Siren |
| BW250020, Annual Radiological Environmental Operating Report | 15 May 2025 | Braidwood | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Spill |
| ML25135A067 | 14 May 2025 | Dresden | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Spill |
| ML25133A032 | 12 May 2025 | Byron | 2024 Radiological Environmental Operating Report (AREOR) | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Radiological Environmental Operating Report Spill |
| BVY 25-015, 2024 Radiological Environmental Operating Report | 12 May 2025 | Vermont Yankee | 2024 Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Chernobyl Power Uprate Radiological Environmental Operating Report Spill |
| L-MT-25-019, 2024 Annual Radiological Environmental Operating Report | 10 May 2025 | Monticello | 2024 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Radiological Environmental Operating Report |
| RA25-012, Annual Radiological Environmental Operating Report | 9 May 2025 | LaSalle | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Spill |
| ML25125A131 | 5 May 2025 | Indian Point | 2024 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Met Tower Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Chernobyl Radiological Environmental Operating Report |
| L-2025-039, Annual Radiological Environmental Operating Report for Calendar Year 2024 | 5 May 2025 | Saint Lucie | Annual Radiological Environmental Operating Report for Calendar Year 2024 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
| W3F1-2025-0013, Annual Radiological Environmental Operating Report (AREOR) – 2024 | 30 April 2025 | Waterford | Annual Radiological Environmental Operating Report (AREOR) – 2024 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Spill |
| ML25119A280 | 29 April 2025 | Oyster Creek | Enclosure 10, ENG-OCS-007, Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 | |
| ML25119A073 | 29 April 2025 | Surry 07200002 07200055 | Annual Radiological Environmental Opera Ting Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Spill |
| ML25119A282 | 29 April 2025 | Oyster Creek | Enclosure 12, ENG-OCS-009, Revision: 0, Area Factors for Soil - Industrial Use Scenario, August 4, 2022 | |
| ML25119A294 | 29 April 2025 | Oyster Creek | Enclosure 15, ENG-OCS-014, Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 | |
| ML25119A293 | 29 April 2025 | Oyster Creek | Enclosure 14, ENG-OCS-013, Revision: 1, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways Oyster Creek Station, March 6, 2024 | |