ML25338A079

From kanterella
Jump to navigation Jump to search

SNC Slides - Vogtle 3 and 4 - TSYF-490 LAR - Pre-Submittal Meeting December 4, 2025
ML25338A079
Person / Time
Site: Vogtle  
Issue date: 12/04/2025
From:
Southern Nuclear Operating Co
To: John Lamb
NRC/NRR/DORL/LPL2-1
References
EPID L-2025-LRM-0142
Download: ML25338A079 (0)


Text

Vogtle Electric Generating Plant Units 3 & 4 Proposed License Amendment Request Adopt Changes based on TSTF-490, Rev. 0, RCS Specific Activity Pre-submittal Meeting

Agenda Introductions & Meeting Purpose Background Information Applicability of TSTF-490 Variations from TSTF-490 Specific Changes Proposed Schedule / Q&A

Vogtle 3&4 Adoption of changes based on TSTF-490 Introductions Southern Nuclear Operating Company (SNC)

Nuclear Regulatory Commission (NRC)

Meeting Purpose SNC intends to submit an application to modify the Combined Licenses (COLs) for Vogtle Electric Generating Plant, Units 3 and 4 (Vogtle 3&4). The proposed amendment would revise the Completion Time for Required Action B.1 in Technical Specification 3.4.10 from 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> based on TSTF-490, Rev. 0, RCS Specific Activity The purpose of this meeting is to discuss background information, the licensing approach, the proposed change, contents of the submittal, and a preliminary timeline.

3

Vogtle 3&4 Adoption of Changes Based on TSTF-490 Background Information

  • The proposed change revises TS 3.4.10 Required Action B.1 from shutdown in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to restore in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Variations to TSTF-490 are described later.

  • The new Completion Time provides additional time to correct or evaluate the condition in lieu of a plant shutdown.

4

Vogtle 3&4 Adoption of Changes Based on TSTF-490 Applicability of TSTF-490 to AP1000 TSTF-490 was issued prior to issuance of the STS for the AP1000 The proposed change will establish the appropriate requirements for VEGP Units 3&4 that are consistent with current PWR STS as modified by TSTF-490 Since TSTF-490 does not directly address the AP1000 design, the request for VEGP 3&4 will be submitted as a normal LAR 5

Vogtle 3&4 Adoption of changes based on TSTF-490 TS Changes Based on TSTF-490 The STS changes identified in TSTF-490 have been reviewed for applicability to AP1000 and specifically the Vogtle Units 3 and 4 TS A significant difference between the Completion Time for TS 3.4.10 Required Action B.1 was identified Specifically, Required Action B.1, with DOSE EQUIVALENT XE-133 > 280 Ci/gm, is 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to be in MODE 3 with Tavg < 500°F The STS Required Action for the same condition, based on TSTF-490, is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to restore DOSE EQUIVALENT XE-133 to within the allowed limit The 48-hour Completion Time for Required Action B.1, as provided in TSTF-490, is less restrictive and would be beneficial for operation of Vogtle Units 3 and 4 6

Vogtle 3&4 Adoption of changes based on TSTF-490 Discussion of Variations from TSTF-490

- TS 1.1, Definitions already include changes consistent with the TSTF

- TS 3.4.10, RCS Specific Activity

  • LCO Description change is not necessary since the LCO requirements are not changed
  • Applicability change is not proposed to be revised
  • Condition A and B changes are editorial when replacing the Dose Equivalent I-131 and XE-133 numerical limits, which are already in the SRs
  • Condition C change is limited to that needed to adopt the Required Action B.1 change replacing the shutdown action with Restore
  • SR changes are already included in the VEGP 3&4 TS with the exception of adding a NOTE to SR 3.4.10.1, which is proposed
  • Required Action C is not included since Applicability changes are not included as discussed above 7

Vogtle 3&4 Adoption of changes based on TSTF-490 Specific changes proposed for TS 3.4.10:

Conditions A and B editorially changed to remove the Dose Equivalent I-131 and XE-133 limits which are already in the SRs and replace them with not within limit Required Action B.1, which is for XE-133 > 280 Ci/gm, revised to allow restore DOSE EQUIVALENT XE-133 to within limit with a Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Change the Required Action B.1 to state, "Restore DOSE EQUIVALENT XE-133 to within limit" Add a Note prior to Required Action B.1 that states, "LCO 3.0.4 is not applicable" Add reference to Condition B in Condition C, to state, "Required Action and associated Completion Time of Condition A or B not met" Add a Note prior to SR 3.4.10.1 to allow entry into MODE 3 with RCS average temperature (Tavg) 500°F and MODE 2 prior to performance of the SR TS Bases 3.4.10 are provided for information consistent with these changes being made to TS 3.4.10 8

Vogtle 3&4 Adoption of changes based on TSTF-490 9

Vogtle 3&4 Adoption of changes based on TSTF-490 10

Vogtle 3&4 Adoption of changes based on TSTF-490 Remaining Actions and Schedule

  • Submit LAR to NRC - Q4 2025
  • Approval requested - Q3 2026
  • Implementation - within 90 days following issuance of the amendment Discussion / Q&A 11