| | Start date | Site | Title | Topic |
|---|
| ML25329A335 | 19 November 2025 | 11006647 | Letter to Eb Requesting Eb Views for XSOU8872 | |
| ML25204A128 | 6 August 2025 | 07109288 | Enclosure 1: CoC No. 9288, Revision No. 13 | |
| ML25216A055 | 4 August 2025 | 07109309 | Enclosure 2: 11x11 RAJ-II Letter Authorization Request and Technical Basis - Non-Proprietary Information | Finite Element Analysis Commercial Grade Fuel cladding GNF3 Water rod |
| ML25161A001 | 17 June 2025 | | EAF-OIP-2025-0064 - Eckert Ziegler Isotopes Products - USNRC Review Related to Export of Source Material and Notice of Violation | Notice of Violation |
| ML25161A138 | 6 June 2025 | | NRC-NEA Concrete Harvesting Workshop Report | Boric Acid Aging Management Stress corrosion cracking |
| ML25041A137 | 4 June 2025 | Idaho State University | Examination Report Letter No. 50-284/OL-25-01, Idaho State University | Shutdown Margin High Radiation Area Gas accumulation |
| NUREG-1379, Rev. 4, NRC Editorial Style Guide | 30 April 2025 | | NUREG-1379, Rev. 4, NRC Editorial Style Guide | Boric Acid Cyber Security Earthquake Chernobyl Fire Protection Program Potassium iodide |
| ML25092A065 | 16 April 2025 | | EAF-OIP-2025-0064 - Choice Letter to Eckert and Ziegler | Notice of Violation |
| ML25105A047 | 14 April 2025 | 11006629 | Revised Letter to Eb Requesting Eb Views for XSOU8871- Hong Kong | |
| ML25099A336 | 9 April 2025 | 11006629 | Letter to the Eb Requesting Eb Views for XSOU8871 | |
| ML25094A058 | 3 April 2025 | 07109294 | Global Nuclear Fuel - Americas, LLC - Proposed Npc CoC Revision Mark-ups | |
| ML25071A359 | 19 March 2025 | 07109294 | Enclosure 2: Certificate of Compliance No. 9294 for Model No. New Power Container Package Rev 10 | |
| ML24347A075 | 6 March 2025 | University of California - Irvine | Examination Report Letter No. 50-326/OL-25-01, University of California - Irvine | Shutdown Margin Earthquake Fuel cladding |
| ML25032A026 | 1 February 2025 | Palisades | Attachment 2: Evaluation of Nuclear Power as a Proposed Solution to Global Warming, Air Pollution, and Energy Security | Fukushima Dai-Ichi Earthquake Chernobyl Uranium Hexafluoride Fatality |
| ML25015A113 | 2 January 2025 | 07007004 | Supplement to License Amendment Request: Proposed Changes to the American Centrifuge Operating LLCs License Application and Supporting Documents | Time of Discovery High Radiation Area Authorized possession limits Exemption Request Uranium Hexafluoride Affidavit Depleted uranium |
| ML22266A068 | 30 October 2024 | | Draft Interim Staff Guidance DRO-ISG-2023-02, ISG Augmenting NUREG-1791, Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m), for Licensing Plants Under | Shift Technical Advisor Exemption Request Backfit |
| ML24291A201 | 14 October 2024 | Saint Lucie | Updated Final Safety Analysis Report, Amendment No. 33 - Chapter 11, Radioactive Waste Management System | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report Fuel cladding GOTHIC Power Uprate |
| ML24240A067 | 27 August 2024 | | Research Information Letter 2024-10, Regulatory Significance of Halden Hto Project Research Activities for 2021-2023 | Probabilistic Risk Assessment Cyber Security FLEX Shift Technical Advisor Severe Accident Management Guideline Exemption Request Nuclear Energy Innovation and Modernization Act Minimum staff Machine learning |
| ML24159A227 | 30 May 2024 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 9, Auxiliary and Emergency Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Time to boil Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Design basis earthquake Earthquake Control of Heavy Loads Fire Protection Program Tritium Power change Spent fuel rack |
| ML24159A233 | 30 May 2024 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.A-G, Radiation Sources (Appendix 14A) (Unit 1) | Safe Shutdown Design basis earthquake Earthquake Fuel cladding |
| ML24159A165 | 30 May 2024 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Tables 14.3.1-1 to 14.3.9-23, 14.A.1-1 to 14.G-3 (Unit 1) | Boric Acid Loop seal Fire Barrier Coatings |
| ML24137A055 | 14 May 2024 | | Review of Advanced Manufacturing Technologies for Fusion Reactor Materials | Thermal fatigue |
| ML24135A293 | 9 May 2024 | 07007004 | American Centrifuge Plant; License Amendment Request Re Proposed Changes to the American Centrifuge Operating, LLCs License Application and Supporting Documents | Time of Discovery High Radiation Area Decommissioning Funding Plan Authorized possession limits Exemption Request Earthquake Uranium Hexafluoride Affidavit Depleted uranium |
| ML24128A107 | 30 April 2024 | Prairie Island | Updated Safety Analysis Report (Usar), Revision 38, Appendix D, Radioactive Source Bases | Boric Acid Power Uprate Measurement Uncertainty Recapture |
| ML24130A066 | 25 April 2024 | South Texas | Updated Final Safety Analysis Report, Revision 22, Chapter 11, Radioactive Waste Management | Boric Acid Packing leak High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Process Control Program Fuel cladding Scaffolding Unidentified leakage |
| ML24116A060 | 23 April 2024 | Point Beach | Periodic Update of the Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (Redacted) | Safe Shutdown Boric Acid Shutdown Margin Loop seal Offsite Dose Calculation Manual Tornado Missile Hydrostatic Probabilistic Risk Assessment Zebra Mussel High Energy Line Break Surveillance Frequency Control Program Design basis earthquake Loss of Offsite Power License Renewal Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Fire Protection Program Power change GOTHIC Power Uprate Overspeed Potassium iodide Spent fuel rack Gas accumulation Operational convenience Leak-Before-Break |
| ML24102A199 | 11 April 2024 | North Anna | Motion by Beyond Nuclear and the Sierra Club to Amend Their Contention 3 Regarding Failure to Consider Environmental Impacts of Climate Change | Safe Shutdown High winds Enforcement Discretion Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Loss of Offsite Power Spent Fuel Pool Instrumentation License Renewal Subsequent License Renewal Earthquake Chernobyl |
| ML24065A435 | 5 March 2024 | Diablo Canyon | Exhibit 3 to Hearing Request | Boric Acid Incorporated by reference Aging Management Stress corrosion cracking License Renewal Chernobyl |
| ML24067A088 | 4 March 2024 | Diablo Canyon | Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group | Boric Acid Probabilistic Risk Assessment Incorporated by reference Aging Management Fukushima Dai-Ichi Stress corrosion cracking License Renewal Earthquake Chernobyl |
| ML23355A172 | 17 January 2024 | | Meeting Transcript - Proposed Rule: Regulatory Framework for Fusion Systems, Teleconference, January 17, 2024, Pages 1-123 | Probabilistic Risk Assessment Decommissioning Funding Plan Exemption Request |
| ML24067A223 | 17 January 2024 | | Proposed Rule: Regulatory Framework for Fusion Systems | Probabilistic Risk Assessment Decommissioning Funding Plan Exemption Request |
| ML24005A259 | 12 January 2024 | 07109330 | Certificate of Compliance No. 9330, Revision No. 17 | |
| ML24011A026 | 11 January 2024 | | Fact Sheet: the Fission Process and Heat Production | Fuel cladding |
| ML23348A348 | 20 December 2023 | | February 2024 ACRS Meeting - Predecisional - Documents to Support SECY-24-XXXX - Draft Proposed Rule Federal Register Notice | License Renewal Earthquake Stolen Backfit Depleted uranium |
| ML23347A144 | 13 December 2023 | | Second Workshop on International Harvesting Cooperation Summary Report | Non-Destructive Examination Weld Overlay Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal Dissimilar Metal Weld |
| ML23335A033 | 30 November 2023 | | Presentation to Health Physics Community on Navigating the Future Oversight of Fusion Systems | Decommissioning Funding Plan Nuclear Energy Innovation and Modernization Act Pre-application |
| ML23320A242 | 16 November 2023 | | Ots Chapter 246-231 Wac Package Transportation (002) | Condition Adverse to Quality Exclusive Use Depleted uranium |
| ML23226A027 | 9 November 2023 | | Response to SRM-M230814 - Rulemaking - Final Rule - Regulatory Analysis - Emergency Preparedness for Small Modular Reactors and Other New Technologies | Probabilistic Risk Assessment License Renewal Exemption Request Backfit Siren |
| ML23319A076 | 31 October 2023 | Farley | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Fuel cladding Pressure Boundary Leakage Power Uprate Gas accumulation |
| ML23217A001 | 26 October 2023 | | U.S. Nuclear Regulatory Commission Export Import of Nuclear Equipment and Material | |
| ML23292A142 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Section 11.1, Source Terms | Stress corrosion cracking Fuel cladding Power Uprate |
| ML24032A010 | 30 September 2023 | | FY2023 University Nuclear Leadership Program (Unlp) Research and Development Award Executive Summaries | Safe Shutdown High winds Probabilistic Risk Assessment Stress corrosion cracking Machine learning |
| ML23258A123 | 15 September 2023 | National Bureau of Standards Reactor | NIST September 11, 2023, Public Meeting Summary | |
| ML23257A302 | 14 September 2023 | Diablo Canyon | San Luis Obispo Mothers for Peace and Friends of the Earth Corrected Request for Hearing on NRC Staff Decision Effectively Amending Diablo Canyon 1 License, Request for Emergency Order Requiring Shutdown, and Errata | Boric Acid Incorporated by reference Stress corrosion cracking License Renewal Earthquake Chernobyl |
| ML23254A174 | 6 September 2023 | Saint Lucie | Amendment 28 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report Fuel cladding Pressure Boundary Leakage GOTHIC Power Uprate |
| ML23235A256 | 23 August 2023 | | NRC Export and Import Training for Nuclear Equipment and Material Final 082323 | |
| ML23241A914 | 23 August 2023 | | T180-13 Effective 2021-04-05 Highlighted | Incorporated by reference Condition Adverse to Quality Exclusive Use Depleted uranium |
| ML23241A917 | 23 August 2023 | | T180-13 Effective 2022-11-02 Highlighted | Incorporated by reference Condition Adverse to Quality Exclusive Use Depleted uranium |
| ML23214A218 | 9 August 2023 | | FRN Suspending General License Authority to Export Special Nuclear Material, Source Material and Deuterium for Nuclear End Use to the PRC | |
| ML23214A243 | 8 August 2023 | | Order Suspending General License Authority to Export Special Nuclear Material, Source Material and Deuterium for Nuclear end-use to the PRC | |