| | Start date | Site | Title | Topic |
|---|
| ML26014A182 | 22 December 2025 | 07000113 | Enclosure 5 - Decommissioning Cost Estimate for License SNM-95 (Redacted) | License Renewal |
| ML25345A119 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-014, Rev. 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario | |
| ML25345A151 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-105, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Bfm Dcglw/F Values | |
| ML25345A150 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-103, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Dcgl Values for Surface Soil | |
| ML25345A149 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-102, Rev. 0, Dcglbp Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A145 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-101, Rev. 0, Dcglbp Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A144 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-096, Rev. 0, Bfm Dcglep Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A143 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-093, Rev. 0, Bfm Dcglep Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A142 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-092, Rev. 0, Bfm Dcgl W/F Values Assuming the Residential Scenario with a Drinking Water Pathway | |
| ML25345A141 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-091, Rev. 0, Bfm Dcgl W/F Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A140 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-090, Rev. 0, Soil Dcgl Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A139 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-089, Rev. 0, Soil Dcgl Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A138 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 24-085, Rev. 0, Probabilistic Dose Comparisons: Building Occupancy Scenario Vs. Room Renovation Scenario | |
| ML25345A133 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 24-081, Rev. 2, Groundwater Dose Calculation Methodology to Support the License Termination Plan | |
| ML25345A129 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 24-055, Rev. 0, Basement Fill Model: Probabilistic Analyses for the Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25345A125 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-016, Rev. 0, Calculation of Buried Pipe Dcgl Values | |
| ML25345A124 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-015, Rev. 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values | |
| ML25345A118 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-013, Rev. 1, Basement Fill Model: Calculation of Dcgl W/F Values Assuming Industrial Use of Scenario Exposure Pathways | |
| ML25345A117 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-012, Rev. 0, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25345A116 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-009, Rev. 0, Area Factors for Soil - Industrial Use Scenario | |
| ML25345A115 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-008, Rev. 0, Derived Concentration Guideline Levels Values for Soil - Industrial Use Scenario | |
| ML25345A114 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-007, Rev. 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario | |
| ML25345A113 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-006, Rev. 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures | |
| ML25345A112 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Calculation ENG-OCS-004, Rev. 0, Resrad Building Surface Dcgl Values | |
| ML25345A152 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-107, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Bfm Dcglep Values | |
| ML25345A153 | 11 December 2025 | Oyster Creek | Nuclear Generating Station, Technical Support Document No. 25-108, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Bfm Dcglbp Values | |
| ML25238A082 | 17 September 2025 | WM-00110 | Moab TER 2024 ET Cover Revision | Earthquake |
| ML25212A112 | 31 July 2025 | 11006064 | Export License Public Issued to Baker Hughes Oilfield Operations, LLC, PXB169.05 | |
| ML25170A029 | 18 June 2025 | Crystal River | Attachment 9: TBD - Basis for No Contaminated Water Dose at CR3 | |
| ENS 57781 | 16 June 2025 14:00:00 | Second Street Iron And Metal | Found Radioactive Source | Moisture Density Gauge Static Eliminator |
| ML25169A038 | 16 June 2025 | 11006610 | Export License Issued to Schlumberger Technology Corporation PXB249.00 | |
| ENS 57760 | 3 June 2025 20:50:00 | Non-Licensee | Found Source | |
| L-2025-092, Nuclear Plant, Units 3 and 4, Annual Radiological Environmental Operating Report (2024) | 15 May 2025 | Turkey Point | Nuclear Plant, Units 3 and 4, Annual Radiological Environmental Operating Report (2024) | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Siren |
| BVY 25-015, Nuclear Power Station, 2024 Radiological Environmental Operating Report | 12 May 2025 | Vermont Yankee | Nuclear Power Station, 2024 Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Chernobyl Power Uprate Radiological Environmental Operating Report Spill |
| L-MT-25-019, Nuclear Generating Plant, 2024 Annual Radiological Environmental Operating Report | 10 May 2025 | Monticello | Nuclear Generating Plant, 2024 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Radiological Environmental Operating Report |
| ML25132A129 | 9 May 2025 | Prairie Island | Nuclear Generating Plant, Units 1 and 2, Independent Spent Fuel Storage Installation - 2024 Annual Radiological Environmental Monitoring Program Report | Offsite Dose Calculation Manual FLEX |
| ML25134A037 | 8 May 2025 | Duane Arnold | Annual Radiological Environmental Operating Report January 1, 2024 Through December 31, 2024 | Grab sample Annual Radiological Environmental Operating Report |
| ML25125A131 | 5 May 2025 | Indian Point | Indian Point Energy Center, 2024 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Met Tower Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Chernobyl Radiological Environmental Operating Report |
| L-2025-039, Units 1 and 2, Annual Radiological Environmental Operating Report for Calendar Year 2024 | 5 May 2025 | Saint Lucie | Units 1 and 2, Annual Radiological Environmental Operating Report for Calendar Year 2024 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
| ML25119A278 | 29 April 2025 | Oyster Creek | Enclosure 8, ENG-OCS-004, Revision 0, Resrad Building Surface Dcgl Values Oyster Creek, April 12, 2022 | |
| ML25119A282 | 29 April 2025 | Oyster Creek | Enclosure 12, ENG-OCS-009, Revision: 0, Area Factors for Soil - Industrial Use Scenario, August 4, 2022 | |
| ML25119A279 | 29 April 2025 | Oyster Creek | Enclosure 9, ENG-OCS-006, Revision: 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures, April 14, 2022 | |
| ML25119A292 | 29 April 2025 | Oyster Creek | Enclosure 13, ENG-OCS-012, Revision: 0, Basement Fill Model Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways Oyster Creek, November 1, 2023 | |
| ML25119A301 | 29 April 2025 | Oyster Creek | Enclosure 22, Tsd 24-055, Revision 0, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25119A302 | 29 April 2025 | Oyster Creek | Enclosure 23, Tsd 24-063, Revision 0, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways | |
| ML25119A307 | 29 April 2025 | Oyster Creek | Enclosure 26, Tsd 24-081, Revision 0, Oyster Creek Groundwater Dose Calculation Methodology to Support the License Termination Plan, January 23, 2025 | |
| ML25119A310 | 29 April 2025 | Oyster Creek | Enclosure 29, Tsd 24-085, Revision 0, Probabilistic Dose Comparisons: Building Occupancy Scenario Vs. Room Renovation Scenario, September 17, 2024 | |
| ML25119A280 | 29 April 2025 | Oyster Creek | Enclosure 10, ENG-OCS-007, Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 | |
| ML25119A073 | 29 April 2025 | Surry 07200002 07200055 | Units 1 and 2, 2024 Annual Radiological Environmental Opera Ting Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Spill |
| L-25-096, Beaver Valley Power Station, Unit Nos. 1 and 2 - Submittal of 2024 Annual Radioactive Effluent Release Report, 2024 Annual Radiological Environmental Operating Report, (Non-Radiological) | 29 April 2025 | Beaver Valley | Beaver Valley Power Station, Unit Nos. 1 and 2 - Submittal of 2024 Annual Radioactive Effluent Release Report, 2024 Annual Radiological Environmental Operating Report, (Non-Radiological) | Grab sample Offsite Dose Calculation Manual Zebra Mussel Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Veliger Chernobyl Biofouling Radiological Environmental Operating Report Spill |