CPSES-200600154, Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 2

From kanterella
(Redirected from CPSES-200600154)
Jump to navigation Jump to search
Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 2
ML062200508
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/02/2006
From: Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-2006001541, TXX-06128
Download: ML062200508 (246)


Text

'TxU

  • A*'7Power TXU Power Mike Blevins Comanche Peak Steam Senior Vice President &

Electric Station Chief Nuclear Officer P. O. Box 1002 (EO1)

Glen Rose. TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com Ref: 10 CFR 50.55a(g)

CPSES-2006001541 Log # TXX-06128 August 2, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-446

-TRANSMITTAL OF UNIT 2 INSERVICE INSPECTION PROGRAM PLAN, REVISION 2 (UNIT 2: ASME CODE SECTION XI 1998 EDITION, 1999 AND 2000 ADDENDA, INTERVAL START DATE - AUGUST 3,2004, SECOND INTERVAL)

Gentlemen:

Enclosed is ofie copy of Revision 2 to the Unit 2 Inservice Inspection (ISI) Program Plan for updating your manual. The attached Plan Revision 2 replaces the Plan Revision I in its entirety. This transmittal does not contain a request for relief from ASME Code requirements.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak. Diablo Canyon
  • Palo Verde
  • South Texas Project - Wolf Creek

TXX-06128 Page 2 of 2 If you have any questions or need additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.

Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC, Its General Partner Mike Blevins By: _______

/F'red W. Madden Director, Regulatory Affairs JCH Enclosure C- B. S. Mallett, Region IV (clo)

M. C. Thadani, NRR (clo)

Resident Inspectors, CPSES (clo)

T. Parks, Chief Inspector, TDLR

ENCLOSURE to TXX-06128

~TXU TXU POWER COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 6322 NORTH FM 56 GLEN ROSE, TEXAS 76043 UNIT 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN REVISION 2- EFFECTIVE DATE: July 14,2006 COMMERCIAL OPERATION: AUGUST 3,1993 SECOND INTERVAL START DATE: AUGUST 3, 2004 Prepared By: f4 j~drKiJ3i- -

ISI Engineer Reviewed By: *4*;7 7i16, I ecflnical Reviewer Approved By:7///

Shaw Site Director, Engineering and Technical Set *ces

<//IA16 -7114&1ý-

Approved By:

TXU Power Engineering Manager

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN TABLE OF CONTENTS 1.0 Introduction 1.1 General Plant Descriptions 1.2 Purpose 1.3 Responsibility 1.4 Scope 1.5 Acronyms 1.6 Exemptions 1.7 Weld Reference System 1.8 Relief Requests 1.9 Records Retention 1.10 Authorized Inspection Agency 2.0 Examination Boundaries 2.1 ASME Code Boundaries 2.2 ISI Isometric Drawings 2.3 ISI Examination Boundary Drawings 3.0 Non-Destructive Examination Methods 3.1 Visual Examination 3.2 Surface Examination 3.3 Volumetric Examination 4.0 Examination Tables 4.1 Class 1 NDE 4.2 Class 2 NDE 4.3 Component Supports 4.4 Eddy Current 5.0 Pressure Test Plan 5.1 Purpose 5.2 Test Description 5.3 Pressure Test Requirements 6.0 Program Changes 4.0, 4.1, 4.2, 4.3 plus examination item sheets (202 pages)

Appendix A Relief Requests Appendix B Open Appendix C Applicable Code Cases Appendix D Ultrasonic Calibration Blocks Appendix E List of ISI Sketches Appendix F Record of Revision Page 2 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN

1.0 INTRODUCTION

1.1 GENERAL PLANT DESCRIPTION The Comanche Peak Steam Electric Station (CPSES) is a two unit plant containing pressurized water reactors, each with an electrical output of approximately 1150 MWe. CPSES was constructed to the ASME Boiler and Pressure Vessel Code,Section III, 1974 Edition, including Summer 1974 Addenda for piping and Winter 1974 Addenda for component supports.

1.2 PURPOSE The purpose of this plan is to provide details pertaining to performance of the Inservice Inspection (ISI) at CPSES, Unit 2 (including common and Unit 1 systems required to support Unit 2 operations). This plan demonstrates compliance with the Code of Federal Regulations, IOCFR50.55a, and CPSES Technical Specifications (TS) 5.5.9. This plan meets the requirements of the 1998 Edition of the ASME Boiler and Pressure Vessel Code, including 1999 and 2000 Addenda of Section XI, and Code Cases as identified in Appendix C of this plan (hereafter referred to as the Code).

1.3 RESPONSIBILITY TXU Power (Owner)/ Designated Agent is responsible for preparation and maintenance of this ten year ISI Program Plan, including any required reference drawings and boundary drawings. The owner prepares each Outage Plan, which defines the scope of the examinations, determines the extent of any of the examinations, and defines the method of each exam. After each outage, this Plan is updated by the Owner/Designated Agent to reflect the completed examinations, and a summary report is prepared and submitted to the Regulatory and Enforcement Authorities. The Owner/Designated Agent is responsible for any associated craft labor required for the examinations, including access provisions, insulation removal; weld preparation, and other aspects. The Owner/Designated Agent is responsible for the evaluation of the ISI examination records, including indication evaluations and associated corrective actions.

A contractor working under the guidance of the Owner/Designated Agent, in most cases, performs the examinations. The contractor submits procedures and personnel certifications for performance of the examinations to the Owner/Designated Agent for review and approval. A contractor ISI Program Manager and a suitable number of examination teams, supplied with the required NDE equipment, are provided to complete the scheduled examinations for the outage. The contractor conducts the examinations, reviews the data, and makes suitable recommendations to the Owner/Designated Agent.

Page 3 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 1.4 SCOPE ISI, as used in this plan, is the program of planned examinations of welds, components and their supports, which is implemented during the service life of a commercial nuclear power plant. This plan addresses those examinations to be performed on ASME Class 1, 2 and 3 systems, and components as stipulated in the Code. ISI examinations will be performed in accordance with the schedule of Inspection Program B of the Code.

A risk-informed inspection (RI-ISI) program for selected ASME Code Class 1 and 2 piping welds(category welds B-F, B-J, C-F-I, and C-F-2) has been developed, submitted, and is presently under review for approval by the NRC as an alternative to the requirements of Section XI of the ASME Code for Inservice Inspection. Relief Request A-I is requested for the second 10-year interval of Unit 2 and is reflected in the Plan and scheduled examinations.

The examination of containment as stipulated in Subsections IWE and IWL of the Code are not within the scope of this plan.

1.5 ACRONYMS ANSI American National Standards Institute ASME American Society of Mechanical Engineers CPSES Comanche Peak Steam Electric Station UFSAR Updated Final Safety Analysis Report ISI Inservice Inspection PSI Pre-Service Inspection PDI Performance Demonstrative Initiative NDE Non-destructive Examination RI-ISI Risk Informed ISI RR Relief Request EVT Enhanced Visual Examination 1.6 EXEMPTIONS 1.6.1 Code Class I The following Code Class I components (or parts of components) are exempted from the volumetric and surface examination requirements of IWB-2500 of the Code by IWB- 1220; (a) components that are connected to the reactor coolant system and part of the reactor coolant pressure boundary, and that are of such a size and Page 4 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of makeup systems which are operable from on-site emergency power. The emergency core cooling systems are excluded from the calculation of makeup capacity.

(b) (1) Piping of NPS I (DN25) and smaller and their supports, except for steam generator tubing.

(2) Components, their supports and their connections in piping of NPS I and smaller.

(c) Reactor vessel head connections and associated piping, and their supports, NPS 2 (DN50) and smaller, made inaccessible by control rod drive penetrations.

(d) Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.

1.6.2 Code Class 2 The following Code Class 2 components or parts of components are exempted from the volumetric and surface examination requirements of Subsection IWC-2500 of the Code by Subsection IWC-1220.

1.6.2.1 Components within Residual Heat Removal (RHR), Emergency Core Cooling (ECC), and Containment Heat Removal (CHR) Systems or Portions of Systems:

(a) For systems, except high pressure safety injection systems in pressurized water reactor plants:

(1) Piping NPS 4 (DN100) and smaller (2) Vessels, pumps, and valves and their connections in piping NPS 4 (DN100) and smaller (b) For high pressure safety injection systems in pressurized water reactor plants:

(1) Piping NPS 11/2 (DN40) and smaller.

(2) Vessels, pumps, and valves and their connections in piping NPS 1 1/2 (DN40) and smaller.

Page 5 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN (c) Vessels, piping, pumps, and valves, other components, and component connections of any size in statically pressurized, passive (i.e.,

no pumps) safety injection systems of pressurized water reactor plants.

(d) Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions.

1.6.2.2 Components within systems or portions of systems other than RHR, ECC, and CHR Systems:

(a) For systems, except auxiliary feedwater systems pressurized water reactor plants:

(1) Piping NPS 4 and smaller (2) Vessels, pumps, and valves and their connections in piping NPS 4 and smaller (b) For auxiliary feedwater systems in pressurized reactor plants:

(1) Piping NPS 1 1/2 and smaller (2) Vessels, pumps, and valves and their connections in piping NPS 1 1/2 and smaller.

(c) Vessels, piping, pumps, valves, other components, component connections of any size in systems or of systems that operate (when the system function is required) at a pressure equal to or less than psig (1900 kPa) and at a temperature equal to or less than 2001F (93°C).

(d) Piping and other components of any size beyond last shutoff valve in open ended portions of systems do not contain water during normal plant operating conditions.

1.6.2.3 Inaccessible Welds Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.

1.6.3 The following components or parts of components are exempted from the VT-I visual examination requirements of IWD-2500 of the Code by IWB-1220:

(a) Piping NPS 4 (DN100) and smaller.

(b) Vessels, pumps, and valves and their connections in piping NPS 4 (DN 100) and smaller.

Page 6 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN (c) Components that operate at a pressure of 275 psig (1900 kPa) or less and at a temperature of 2007F (931C) or less in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling.

(d) Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.

1.7 WELD REFERENCE SYSTEM Weld areas subject to surface or volumetric examination shall be identifiable through a reference system as specified by Subsection IWA-2600 and Appendix III of the Code. This system shall consist of a combination of physical markings and written direction provided in this plan and in site implementing procedures.

Welds within the boundaries of the ISI program are uniquely identified on isometric drawings, which provide weld numbers and locations. In those cases where the physical configuration will not provide positive weld location, dimensional information can be obtained from construction isometric drawings or piping fabrication drawings to allow for such positive identification.

Welds which were inadvertently not marked or whose marks have been removed shall be marked at the time inservice inspection is performed. The method of marking these indications on the pipe will be delineated in the implementing procedures.

1.8 RELIEF REQUESTS Where a particular examination requirement of the Code is determined to be impractical, a request for relief from the requirement shall be submitted pursuant to the requirement of 10CFR50.55a (a)(3).

Each request for relief should contain the following information, as a minimum:

(a) System/Component for which relief is requested; (b) Code requirement; (c) Code requirement from which relief is requested; (d) Proposed alternative; (e) Basis of alternative for providing acceptable level of quality and safety; and, (f) Duration of proposed alternative.

Page 7 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 1.9 RECORDS OF RETENTION Records and documentation of information and examination results, which provide the basis for evaluation and facilitate the comparison of examination results from previous and subsequent examinations, shall be maintained as permanent plant records at CPSES in accordance with Article IWA-6000 of the Code. As a minimum, this documentation shall include the applicable records described in Subsection IWA-6340.

1.10 AUTHORIZED INSPECTION AGENCY In accordance with Subsection IWA-1400, paragraph (f), of the Code, Owner/Designated Agent has maintained a contract with an Authorized Inspection Agency (AIA) for an Authorized Nuclear Inservice Inspector (ANII) to provide inspection services as described in Subsection IWA-21 10 of the Code. The ANII is afforded the opportunity to verify examinations and review the plan, examination procedures, examination records, certification records, and other associated documents.

2.0 EXAMINATION BOUNDARIES 2.1 ASME CODE BOUNDARIES ASME Code classification and system boundaries of the piping and other components subject to examination have been identified as required by Subsection IWA-1400(a) of the Code. Section 3.2 of the CPSES UFSAR defines the various safety classes of piping and components in accordance with Regulatory Guide 1.26 and ANSI Standard N18.2. The plant piping schematic drawings (flow diagrams) show these class interfaces and the ISI examination boundary drawings were developed from these flow diagrams.

2.2 ISI ISOMETRIC DRAWINGS ISI isometric drawings have been developed to identify the ISI examination areas for examinations required by ASME Section XI tables IWB-2500, IWC-2500, and IWF-2500 (class I and 2 only). These drawings are maintained current by CPSES. Revisions to these ISI isometric drawings are prepared and approved in accordance with site implementing procedures.

Plant piping drawings (BRP, BRHL, GHH), individual pipe support drawings and vendor drawings for vessels, pumps, and valves are specifically used to identify examination areas for examinations as required by ASME Section XI tables IWD-2500 and IWF-2500 (Code class 3) and also provide references for class I and 2 examinations.

Page 8 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 2.3 ISI EXAMINATION BOUNDARY DRAWINGS The following ISI examination boundary drawings delineate the bounds within which the ISI examination requirements of the Code are applied. The plant systems included in the examination boundary are listed below:

AF - Auxiliary Feedwater CC - Component Cooling Water CH - Chilled Water System CS - Chemical and Volume Control CT - Containment Spray DD - Demineralized & Reactor Make-up Water DO - Diesel Oil FW - Feedwater MS - Main Steam RC - Reactor Coolant RH - Residual Heat Removal SI - Safety Injection SW - Service Water 3.0 NON-DESTRUCTIVE EXAMINATION (NDE) METHODS The method of examination for each weld, component, or support is specified in the examination tables found in subsection 4.1, 4.2, and 4.3 of this plan. These methods, as described below, are in accordance with Article IWA-2000 of the Code.

Page 9 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 3.1 VISUAL EXAMINATION (IWA-2210) 3.1.1 VT-I (IWA-2211)

VT-i examinations are conducted to detect discontinuities and imperfections on the surfaces of components, including such conditions as cracks, wear, corrosion, or erosion.

3.1.2 VT-2 (IWA-2212)

(a) VT-2 examinations are conducted to detect evidence of leakage from pressure retaining components, with or without leakage collection systems, as required during the conduct of system pressure test.

(b) VT-2 examinations shall be conducted in accordance with IWA-5000. For direct examination, the Table IWA-2210-1 maximum examination distance shall apply to the distance from the eye to the surfaces being examined.

3.1.3 VT-3 (IWA-2213)

VT-3 examinations are conducted to determine the general mechanical and structural condition of components and their supports by verifying parameters such as clearances, settings, and physical displacement; and to detect discontinuities and imperfections, such as loss of integrity at bolted or welded connections, loose or missing parts, debris, corrosion, wear, or erosion. VT-3 includes examinations for conditions that could affect operability or functional adequacy of snubbers and constant load and spring type supports.

3.2 SURFACE EXAMINATION (IWA-2220)

(a) A surface examination indicates the presence of surface discontinuities. It may be conducted by a magnetic particle, a liquid penetrant, or an eddy current method.

(b) Any linear indication that exceeds the allowable linear surface flaw standards shall be recorded.

3.2.1 Magnetic Particle Examination (IWA-2221)

The magnetic particle (MT) examination shall be conducted in accordance with Article 7 of Section V of the ASME Boiler and Pressure Vessel Code. MT of coated materials shall be conducted in accordance with Article 7 , Appendix I if Section V.

Page 10 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 3.2.2 Liquid Penetrant Examination (IWA-2222)

The liquid penetrant examination shall be conducted in accordance with Article 6 of Section V of the ASME Boiler and Pressure Vessel Code.

3.2.3 Eddy Current Examination (IWA-2223)

Eddy current examination for detection of surface flaws shall be conducted in accordance with Appendix IV.

3.3 VOLUMETRIC EXAMINATION (IWA-2230)

A volumetric examination indicates the presence of discontinuities throughout the volume of material.

3.3.1 Radiographic Examination (IWA-2231)

This volumetric examination is conducted to detect discontinuities using penetrating radiation with appropriate image-recording devices. This examination shall be conducted in accordance with Article 2 of Section V of the ASME Boiler and Pressure Vessel Code.

3.3.2 Ultrasonic Examination (IWA-2232)

This volumetric examination is conducted to detect discontinuities using appropriate ultrasonic instrumentation in accordance with Appendix I of Section XI of the ASME Code.

3.3.3 Eddy Current Examination (IWA-2233)

This volumetric examination is conducted to detect discontinuities in heat exchanger tubing using electromagnetic principles in accordance with the provisions of Section V of the ASME Code, Article 8, Appendix II. For Inspection Program for Steam Generator Tubing refer to ASME Section XI Subsection IWB-2413 and paragraph 4.4 below.

Page 11 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 4.0 EXAMINATION TABLES CPSES ASME Section XI Inservice Inspection Plan tables 4.1 through 4.3 have been developed and contain the following information:

a) System Name.

b) Summary Number - A computer data base assigned sequencing number.

c) Line Number of Component Number - Example: 6-SI-1-089-2501R-1 or TCX-RCPCRV-0l.

d) Weld Number or Pipe Support Number - Example: TCX-1-1 100-8 or CC-1-105-012-E33K.

e) ASME Sec. XI Category and Item Number - Described in ASME Sec.

XI Examination Tables (IWX-2500-1).

f) NDE Method - Identifies the examination method(s) as described in section 3 of this plan.

g) Plan Status - Identifies the inspection interval, period and outage h) Year - Example: 83, the year that PSI was performed.

i) Instructions - Notes applicable to specific inspection requirements.

j) Calibration Block - Example: TBX-18.

k) Notes - Applicable to the results of specific outages preceded by the outage year, "84" refers to the baseline outage.

4.1 CLASS 1 NDE This subsection describes the examination areas and NDE methods for the Class 1 pressure retaining components and associated component integral welded attachments as specified in Article IWB of the Code.

For pressure testing, refer to Section 5 below.

Class I valve bodies exceeding 4" NPS have been grouped according to size, constructional design, manufacturing method, and function in accordance with Table IWB-2500-1, Category B-M-2, and Note 3 of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "*"

These examinations are only required to be performed if the component is disassembled for maintenance, repair or other testing Group I - 6" Forged Pressurizer Relief Valves 2-8010A * (reference TCX-1-4501 for location) 2-8010B 2-8010C Page 12 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Group 2 - .12" Forged Gate Valves Isolating the RC System from the RHR System 2-8701A * (reference TCX-1 -4101 for location) 2-8701B 2-8702A 2-8702B Group 3 - 10" Forged Check Valves Isolating the RC System from the SI System 2-8948A 2-8948B 2-8948C 2-8948D 2-8956A 2-8956B 2-8956C 2-8956D (reference TCX-1 -4402 for location)

Group 4 - 6" Forged Check Valves Isolating the RC System from the SI System 2-8818A 2-8818B 2-8818C 2-8818D (reference TCX-1 -4403 for location) 2-8949A 2-8949B 2-8949C 2-8949D 2-8841A 2-8841B 4.2 CLASS 2 NDE This subsection describes the examination areas and NDE methods for the Class 2 pressure retaining components and associated component integral welded attachments as specified in Article IWC of the Code. For pressure testing, see Section 5.

Class 2 valve body welds have been grouped according to design, size, function and service in a system in accordance with Table IWC-2500-1, Category C-G, Note 1 of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "".

Page 13 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Group I - 8" Forged Gate Valves, MS Safety Isolation 2MS-026 2MS-063 2MS-098 (reference TCX-2-2300 for location) 2MS-134 Group 2 - 18" Forged Gate Valves, Main Feedwater Isolation 2FW-071 2FW-077 * (reference TCX-2-2202 for location) 2FW-083 2FW-089 Group 3 - 6" Forged Check Valves, Feedwater 2FW-191 2FW.-192 2FW-193 (reference TCX-2-2204 for location) 2FW-194 2FW-195 2FW-196 2FW-197 2FW-198 2FW-199 2FW-200 2FW-201 2FW-202 Group 4 - 6" Forged Gate Valves, Auxiliary Feedwater Isolation 2FW-203 (reference TCX-2-2403 for location) 2FW-204 2FW-205 2FW-206 Group 5 - 12" Forged Gate Valves, Containment Spray Isolation 2CT-0026 2CT-0028 * (reference TCX-2-2578 for location) 2CT-0078 2CT-0084 Group 6 - 12" Forged Gate Valve, Safety Injection 2SI-0048 * (reference TCX-2-2582 for location)

Page 14 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 4.3 COMPONENT SUPPORTS This subsection describes the examination areas and requirements for the Class 1, 2 and 3 component supports and Class 3 Integral Welded Attachments as specified in Article IWF and IWD of the Code, respectively. For pressure testing of Class 3 components, see Section 5.

In lieu of the requirements of Technical Specifications relating to snubbers, specifically those ISI requirements (e.g., plans, schedules, reports, inspector involvement, and Code Data Reports) of ASME Section XI, snubbers shall be demonstrated operable by performance of the augmented inservice inspection program as described in the ASME OM Code, Subsection ISTD.

4.4 EDDY CURRENT Eddy Current testing (ET) of the steam generator tubes, shall be governed by Plant Technical Specifications; results of the examination shall be evaluated against acceptance criteria contained in TS 5.5.9. The need for reporting requirements, the corrective action including expanded examination samples shall also be governed by the Technical Specifications. Other examination parameters shall be in accordance with ASME Section XI. These measures will provide compliance with the inspection requirements of Reg. Guide 1.83.

Procedure NDE 7.10, "Steam Generator Tube Selection and Examination" lists the tubes repaired by steam generator number and the type of plugs installed.

The information in this table is cumulative and is updated after each refueling outage.

The following License Amendment Request (LAR) numbers have been taken for Eddy Current testing:

98-009 Implementation of 1.0 volt repair criteria 98-006 Revision to SG tube plugging criteria 5.0 PRESSURE TESTING 5.1 PURPOSE This section of the ISI Plan identifies pressure test requirements for ASME Code Class 1, 2, and 3 pressure retaining piping and components at CPSES Unit 2 as defined in Subsection IWA-5000 of the Code.

This section defines pressure test boundaries, establishes test frequencies, required tests and test pressures and temperature as required by the Code.

The system pressure test for repair/replacement activities shall be in accordance with Subsection IWA-5120 of the Code.

Page 15 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 5.2 PRESSURE TEST DESCRIPTION Pressure retaining components within each system boundary is subjected to the following applicable system pressure tests as referenced in the ASME Section XI, Table IWA-521 0-1, under which conditions a VT-2 visual examination is performed in accordance with IWA-5240 to detect leakage.

5.2.1 IWA-521 l(a): A system leakage test is conducted while the system is in operation, during a system operability test, or while system is at rest conditions using an external pressurization source; 5.2.2 IWA-521 l(b): A system hydrostatic test conducted during a plant shutdown at an elevated test pressure as specified in IWB-5230, IWC-5230, or IWD-5222; and 5.2.3 IWA-521 1(c): A system pneumatic test conducted in lieu of either of the above system pressure tests for Class 2 or 3 components as permitted by IWC-5000 or IWD-5000, the requirements for system leakage and hydrostatic tests are applicable to pneumatic tests.

5.3 PRESSURE TEST REQUIREMENTS A system pressure test and accompanying VT -2 examination shall be performed in accordance with Articles IWA-5000, IWB-5000, IWC-5000 and IWD-5000 and the related tables, Tables IWA-5210-1, 1WB, IWC and IWD-2500-1 of the Code.

Insulated Bolted Connections:

IWA-5242 states that borated systems controlling reactivity shall have insulation removed from pressure retaining bolted connections during VT -2 visual exams.

In lieu of performing this examination at plant start-up and after removing/

reinstalling the insulation at these bolted connections, an alternate examination was done using approved Code Case N-533-1. This alternate examination allowed for removing the insulation and conducting the bolted joint exams for class I systems during refueling. VT -3 certified personnel having the required VT-2 certifications then perform the exams of the bolted connections looking for evidence of leakage per the list of components provided in Preventative Maintenance (PM) work orders 344682.

Page 16 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 6.0 PROGRAM CHANGES Class 1 NDE, Class 2 NDE, and component support exams that are substituted for other exams are identified in the table below per the requirements of IWA-2420(5). Based on the limitations of the ISI data base program, exams that are no longer conducted do not appear on the Class I NDE, Class 2 NDE, and component support tables. The table, below, clearly identifies the specific exams affected rather than reviewing the history of changes made per each specific revision of the Program Plan.

Page 17 of 18

COMANCHE PEAK STEAM ELECTRIC STATION UNIT NO. 2 - SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Weld/Comp Code Replacement Code Outage Justification Number Cat. Weld/Comp Cat TCX-1-4506- B-J TCX-1-4506- B-J 2RF07 Replaced because of interference 15 R1.11 17 R1.11 between the weld and a clamp for a vertical pipe support. Removal of the clamp would have required temporarily supporting the line in a high radiation area. Selected another weld on the same line segment, having the same risk category and ranking.

TCX- 1-4101-4 B-J TCX- 1-4401 - B-J 2RF07 Replaced because of interference RI 4 RI between the weld and a clamp for none none a pipe support. Clamp could not be easily removed or loosened.

Selected another weld having the same risk category and ranking.

TCX-2-2581-6 C-F-1 TCX-2-258 1- C-F-1 2RF07 Replaced because the weld is RI 7 RI located too close to a penetration none none seal, which interferes with the exam and the seal is not easily removable. Selected another weld which has the same risk category and ranking.

Page 18 of 18

7/6/2006 COMANCHE PEAK UNIT 2 PAGE: 1 REVISION: 2 INSERVICE INSPECTION

SUMMARY

FOR THE SECOND INTERVAL SECTION XI

SUMMARY

NUMBER OF COMPONENTS (SCHEDULED / COMPLETED / PERCENTAGE OF REQUIREMENT)

CATEGORY COMPONENTS REQUIRED FIRST PERIOD SECOND PERIOD THIRD PERIOD B-A 24 24 1 1 4% 3 16% 20 100%

B-B 8 8 2 0 25% 4 75% 2 100%

B-D 36 36 10 0 27% 6 44% 20 100%

B-G-1 181 165 0 0 0% 0 0% 165 100%

B-G-2 68 19 4 3 21% 6 53% 9 100%

B-K 10 8 2 0 25% 4 75% 2 100%

B-L-1 1 1 0 0 0% 0 0% 1 100%

B-L-2 1 1 0 0 0% 0 0% 1 100%

B-M-2 25 4 2 1 50% 2 100% 0 100%

B-N-I 1 3 1 0 33% 1 66% 1 100%

B-N-2 1 1 0 0 0% 0 0% 1 100%

B-N-3 1 1 0 0 0% 0 0% 1 100%

B-O 28 4 0 0 0% 0 0% 4 100%

19 19 4 3 21% 10 73% 5 100%

C-A 8 2 2 25% 2 50% 4 100%

C-B 8 C-C 97 95 25 13 26% 39 67% 31 100%

C-D 1 1 1 0 100% 0 100% 0 100%

C-G 27 6 2 1 33% 2 0 66% 2 0 100%

D-A 141 140 41 40 29% 51 0 65% 48 0 100%

F-A (1) 289 87 18 13 21% 28 0 53% 41 0 100%

(2) 572 253 60 48 24% 105 0 65% 88 0 100%

F-A (3) 861 168 54 54 32% 66 0 66% 48 0 100%

F-A (NPS) 143 98 30 9 31% 44 0 75% 24 0 100%

F-A R-A 3199 142 39 12 28% 57 0 67% 46 0 100%

TOTALS 5388 1292 298 0 23% 430 0 56% 564 0 100%

NOTE: (1) Item F1.10; CLASS 1 PIPING SUPPORTS (1) Item F1.20; CLASS 2 PIPING SUPPORTS (1) Item F1.30; CLASS 3 PIPING SUPPORTS (NPS) ITEM F1.40; SUPPORTS OTHER THAN PIPING SUPPORTS (CLASS 1, 2, 3 AND MC) 4.0 PAGE 1 of 3

4.0 EXAMINATION TABLES CPSES ASME Section XM Inservice Inspection Plan tables 4.1 through 4.3 have been developed and contain the following information:

a) System Name.

b) Summary Number - A computer data base assigned sequencing number.

c) Line Number of Component Number - Example: 6-SI-I-089-2501R-1 or TCX-RCPCRV-01.

d) Weld Number or Pipe Support Number - Example: TCX-I-1100-8 or CC-I-1 05-012-E33K.

e) ASME Sec. XI Category and Item Number - Described in ASME Sec. XI Examination Tables (IWX-2500-1).

f) NDE Method - Identifies the examination method(s) as described in section 3 of this plan.

g) Plan Status - Identifies the inspection interval, period and outage h) Year - Example: 83, the year that PSI was performed.

i) Instructions - Notes applicable to specific inspection requirements.

j) Calibration Block - Example: TBX-1 8.

k) Notes - Applicable to the results of specific outages preceded by the outage year, "84" refers to the baseline outage.

4.0 Page 2 of 3

COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD I (A) ASME I PERIOD PERIOD PERIOD I f,' V 1I

SUMMARY

EXAMINATION AREA CATGY NDE I -------- OUTAGE -........ I INSTRUCTIONS NUMBER IDENTIFICATION rIEM NO METH 1 1 2 1 2 3 1 2 1 *CALIBRATION BLOCK" (C) (G)

(B) (D) (E) (F) (H) (1)

(j)

(K) 4.0 Page 3 of 3

4.1 CLASS 1 NDE This subsection describes the examination areas and NDE methods for the Class 1 pressure retaining components and associated component integral welded attachments as specified in Article IWB of the Code.

For pressure testing, refer to Section 5 below.

Class I valve bodies exceeding 4" NPS have been grouped according to size, constructional design, manufacturing method, and function in accordance with Table IWB-2500-1, Category B-M-2, and Note 3 of the Code. These groups are delineated below.

One valve from each group has been selected for examination as denoted by the asterisk "*".

These examinations are only required to be performed if the component is disassembled for maintenance, repair or other testing.

Group I - 6" Forged Pressurizer Relief Valves 2-8010A * (reference TCX-1-4501 for location) 2-8010B 2-8010C Group 2 - 12" Forged Gate Valves Isolating the RC System from the RHR System 2-8701A (reference TCX-1--4101 for location) 2-8701B 2-8702A 2-8702B Group 3 - 10" Forged Check Valves Isolating the RC System from the SI System 2-8948A 2-8948B 2-8948C 2-8948D 2-8956A 2-8956B 2-8956C 2-8956D (reference TCX-1-4402 for location) 4.1 Page I of 2

Group 4 - 6" Forged Check Valves Isolating the RC System from the SI System 2-8818A 2-8818B 2-8818C 2-8818D * (reference TCX-1-4403 for location) 2-8949A 2-8949B 2-8949C 2-8949D 2-8841A 2-8841B 4.1 Page 2bf 2

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 1 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD I ASME PERIOD PERIOD PERIOD I SEC. XI I ---- ---------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE j . . . . . . OUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~CALIBRATION BLOCK*"

REACTOR COOLANT TCX-RCPCRV-01 000100 TCX-1-1100-1 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV FLANGE TO SHELL WELD B1.30 2 - - -X -

R157 830RB

    • PDI-01**

000200 TCX-1-1100-2 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV UPPER TO INTERMEDIATE SHELL B1.11 2 - -- -X -

WELD

    • PDI-01**

000300 TCX-1-1100-3 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV INTERMEDIATE TO LOWER SHELL B1.11 2 - - -x -

WELD

    • PDI-01**

000400 TCX-1-1100-4 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV LOWER SHELL TO BOTTOM HEAD B1.11 2 - - -X -

WELD

    • PDI-01**

000500 TCX-1-1100-5 B-A UT 82 TDLR VERIFICATION BOUNDARY.

RV LOWER HEAD CIRCUMFERENTIAL B1.21 2 - X -

WELD

    • PDI-01**

000600 TCX-1-1100-6 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV UPPER SHELL LONGITUDINAL B1.12 2 - X -

WELD

    • PDI-01**

000700 TCX-1-1100-7 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV UPPER SHELL LONGITUDINAL B1.12 2 - - -- -x -

WELD

    • PDI-01**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI


UTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 1 2 **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 000800 TCX-1-1100-8 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV UPPER SHELL LONGITUDINAL Bl.12 2 - - X -

WELD

    • PDI-01**

000900 TCX-1-1100-9 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV INTERMEDIATE SHELL Bl.12 2 - - - -X -

LONGITUDINAL WELD

    • PDI-01**

001000 TCX-l-ll00-10 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV INTERMEDIATE SHELL Bl.12 2 - - -X -

LONGITUDINAL WELD

    • PDI-01**

001100 TCX-1-1100-11 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV INTERMEDIATE SHELL El. 12 2 - X -

LONGITUDINAL WELD

  • *PDI -01
  • 001200 TCX-1-1100-12 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV LOWER SHELL LONGITUDINAL Bl.12 2 - X -

WELD

    • PDI-01**

001300 TCX-1-1100-13 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV LOWER SHELL LONGITUDINAL Bl.12 2 - -- -X -

WELD

    • PDI-01**

001400 TCX-1-1100-14 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV LOWER SHELL LONGITUDINAL Bl.12 2 - - -X -

WELD

    • PDI-01**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE:

INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ _ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY 1E I 2OUTAGE -. INSTRUCTIONS NUMB3ER IDENTIFICATION ITEM NO METH I 1 2 12 3 1 2 I **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV- 01 001500 TCX-1-1100-15 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV BOTTOM HEAD MERIDIONAL WELD B1.22 2 - - - - X -

    • PDI-01**

001600 TCX-1-1100-16 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV BOTTOM HEAD MERIDIONAL WELD B1.22 2 - - - - X -

001700 TCX-I-1100-17 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV BOTTOM HEAD MERIDIONAL WELD BI.22 2 - - - -

001800 TCX-1-1100-18 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV BOTTOM HEAD MERIDIONAL WELD BI.22 2 - - - -

    • PDI-01**

001850 TCX-1-1100-LUGS B-N-2 VT-3 83 TDLR VERIFICATION BOUNDARY.

CORE SUPPORT LUGS (6) B13.60 2 - -- - -

001900 TCX-1-1100A-19 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE TO VESSEL B3.90 2 - - - -

WELD R157 830RB **RV-7, PDI-01**

001910 TCX-1-1100A-19IR B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 - - - - -

R157 830RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE:

INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH i 2 1 2 3 1 2 I **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 002000 TCX-1-1100A-20 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE TO VESSEL WELD B3.90 2 - - X -

    • RV-7 ,PDI-01**

002010 TCX-1-1100A-20IR B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 - X -

002100 TCX-1-1100A-21 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE TO VESSEL WELD B3.90 2 - - - X -

    • RV-7 ,PDI-01**

002110 TCX-1-1100A-21IR B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 - - - X -

002200 TCX-1-1100A-22 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE TO VESSEL B3.90 2 - - -- -X -

WELD R157 830RB **RV-7 ,PDI-01**

002210 TCX-1-1100A-22IR B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 - - - - -

R157 830RB 002300 TCX-1-I100A-23 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE TO VESSEL B3.90 2 - - - -

WELD R157 830RB **RV-7 ,PDI-01**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 5 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I CALIBRATION BLOCK**

-ACIOR -- -,,,R--

002310 TCX-1-1100A-231R B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2- - X -

R157 830RB 002400 TCX-1-1100A-24 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE TO VESSEL WELD B3.90 2 - - - -

    • RV-7 ,PDI-01**

002410 TCX-1-1100A-24IR B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 - X -

002500 TCX-1-1100A-25 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE TO VESSEL WELD B3.90 2 - - - -

    • RV-7 ,PDI-01*-

002510 TCX-1-1100A-25IR B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 - -- - -

002600 TCX-1-1100A-26 B-D UT 83 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE TO VESSEL B3.90 2 - - -- - -

WELD R157 830RB **RV-7 ,PDI-01**

002610 TCX-1-1100A-26IR B-D UT 93 TDLR VERIFICATION BOUNDARY.

RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 - - - - -

R157 830RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 6 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ----- -OUTAGE E--- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK-REACTOR COOLANT TCX-RCPCRV-01 002700 TCX-1-1100A-LIG B-G-1 UT 83 TDLR VERIFICATION BOUNDARY.

RV FLANGE LIGAMENTS (1/54) B6.40 2 - -- - X -

R157R830RB

    • RV-3**

002800 TCX-1-1200-INT B-N-i VT-3 82 TDLR VERIFICATION BOUNDARY.

RV INTERNALS (ACCESS DURING B13.10 2 - X X X -

REFUELING)

R157 832RB 002805 TCX-1-1200-CSS B-N-3 VT-3 82 TDLR VERIFICATION BOUNDARY.

RV CORE SUPPORT STUCT-NO B13.70 2 - - - - X -

ACCESS 0 REFUEL 003100 TCX-1-1300-1 B-A UT 83 TDLR VERIFICATION BOUNDARY RV CLOSURE HEAD TO FLANGE WELD BI.40 MTr 2 C -

R157R832RB

-*TBX-29-*

003200 TCX-1-1300-2 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD RING TO DISC B1.21 2 - - - X WELD R157R832RB **TBX-29**

003300 TCX-1-1300-3 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD MERIDIONAL B1.22 2 - - - X - -

WELD R157R832RB **TBX-29**

003400 TCX-1-1300-4 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD MERIDIONAL B1.22 2 - - - X -

WELD

    • TBX-29**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 7 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS- PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I **CALIBRATION BLOCK*-

REACTOR COOLANT TCX-RCPCRV-01 003500 TCX-i-1300-5 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD MERIDIONAL B1.22 2 - - - I -

WELD 003600 TCX-1-1300-6 B-A UT 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD MERIDIONAL Bl.22 2 - - - IC -

WELD

    • TBX-29**

003700 TCX-i-1300-CB75 B-G-2 VT-i 84 TDLR VERIFICATION BOUNDARY.

CONOSEAL BOLTING B7.80 2 - X -

R157 86ORB 003800 TCX-I-1300-CB76 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

CONOSEAL BOLTING B7.80 2 - X -

R157 860RB 003900 TCX-1-1300-CB77 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

CONOSEAL BOLTING B7.80 2 - X -

R157 860RB 004000 TCX-I-1300-CB78 B-G-2 VT-1 84 TDLR VERIFICATION BOUNDARY.

CONOSEAL BOLTING B7.80 2 - X -

R157 860RB 005150 TCXI--1300A-CRD75 B-0 PT 83 TDLR VERIFICATION BOUNDARY.

CONTROL ROD DRIVE BI4.10 2 - - - I -

R155 86ORB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 8 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI II II SOUTAGE.------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS I I NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK-REACTOR COOLANT TCX-RCPCRV-01 005200 TCX-1-1300A-CRD76 B-O PT 83 TDLR VERIFICATION BOUNDARY.

CONTROL ROD DRIVE B14.10 2 - - -- - X -

005250 TCX-1-1300A-CRD77 B-O PT 83 TDLR VERIFICATION BOUNDARY.

CONTROL ROD DRIVE B14.10 2 - -- - X -

005300 TCX-1-1300A-CRD78 B-O PT 83 TDLR VERIFICATION BOUNDARY.

CONTROL ROD DRIVE B14.10 2 - - -X -

005400 TCX-1-1400-1 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - X -

R160 905RB

-- TBX-52*

005420 TCX-1-1400-2 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - X -

R160 905RB

    • TBX-52**

005440 TCX-1-1400-3 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -X -

R160 905RB

    • TBX-52**

005460 TCX-1-1400-4 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 - -X -

R160 905RB

    • TBX-52**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 9 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD I ASME PERIOD PERIOD PERIOD SEC. XI I---- ----------- ---------- I

SUMMARY

EXAMINATION AREA CATGY NDE ...... OUTAGE G ----- -I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 I **CALIBRATION BLOCK*

rnnr.n~rr i~ranvrn COOLANT rrv-DPDCPU-ni REACTOR TCX-RCPCRV-01 005480 TCX-1-1400-5 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X RI60 905RB

    • TBX-52**

005500 TCX-1-1400-6 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905RB

    • TBX-52**

005520 TCX-1-1400-7 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -- -X -

R160 905RB

    • TBX-52**

005540 TCX-1-1400-8 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905RB 005560 TCX-i-1400-9 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905BR

    • TBX-52**

005580 TCX-1-1400-10 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

R160 905RB

    • TBX-52**

005600 TCX-1-1400-11 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -X -

RI60 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 10 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS - PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -----------.-. --------- .-.- ------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- - ----- OUTAGE- - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

PPAfl'fl CflftAkTT TflM-PCPCRV- Al REACTOR COOLANT TCX-RC!PCPV-01 005620 TCX-1-1400-12 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

Ri60 905RB

    • TBX-52**

005640 TCX-1-1400-13 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

RI1O 905RB

    • TBX-52**

005660 TCX-i-1400-14 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

Ri60 905RB

    • TBX-52**

005680 TCX-1-1400-15 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905RB

    • TBX*52**

005700 TCX-i-1400-16 B-G-1 UT 82 TDLR.VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905RB

    • TBX-52**

005720 TCX-1-1400-17 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -X -

R160 905RB

    • TBX-52**

005740 TCX-1-1400-18 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -X -

RI60 905RB

    • TBX-52**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE t 11 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMt. COMPONENTS INSPECTION INTERVAL _____ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME J PERIOD PERIOD PERIOD SEC. XI II OUTAGE--------------

SUMMARY

EXA21INATION AREA CATGY NOE I- INSTRUCTIONS I

NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 *CALIBRATION BLOCK**

'PY.DPY

  • OCDrI . fl ,

R&'Ar'MD CMLAN'T T -RCP V-01 005760 TCX-1-1400-19 B-G-1 11T 82 TDLR VERIFICATION BOUNDARY.

RV STUD 06.30 2 - - - - - x -

R160 905RD 005780 TCX-1-1400-20 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - X -

R160 905R8

-- TBX-S2**

005800 TCX-1-1400-21 2-0-1 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -x -

R160 905RB

  • -TBX-52*-

005820 TCX-1-1400-22 B-0-i UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD 06.30 2 - x -

R160 905RE

-- TBX-52--

005840 TCX-1-1400-23 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- - x -

Ri60 905RB

    • TrBX52**

005860 TCX-1-1400-24 B-0-1 UT 82 TDLR VERIFICATION DOUNDARY.

RV STUD B6.30 2 - x -

RI60 905RB

    • TBX-52**

005880 TCX-1-1400-25 B-0-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - X -

R160 905PR

    • TBX-52**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 12 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I . . . . . . . . . . . . . . .. . . . . . . . . . . . ---

--- I SUM4ARY EXAMINATION AREA CATGY NDE II O .U T A 0 E . ..-.-- - - -- II INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 *~CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 005900 TCX-1-1400-26 B-0-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905RD

    • TBX-52-*

005920 TCX-1-1400-27 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -- x -

RC60 905RE

.*TBX-52**

005940 TCX-1-1400-28 B-0-I UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

RI60 905RH 005960 TCX-1-1400-29 B-G-1 82 TDLR VERIFICATION BOUNDARY.

RV STUD 16.30 2 - -- - x -

RC60 905R5

    • TBX-52**

005980 TCX-1-1400-30 B-0-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV DTUD B6.30 2 - x -

R160 905RB

  • TDX-52*-

006000 TCX-1-1400-31 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- - x -

RI0 905RU

    • TEX-52-*

006020 TCX-i-1400-32 B-G-i UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - x -

R160 905RP

    • TBX-52-*

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 13 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE ----------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 006040 TCX-1-1400-33 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

R160 905RB

    • TBX-52**

006060 TCX-1-1400-34 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - X -

R160 905RB

    • TBfX-52**

006080 TCX-1-1400-35 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -X -

R160 905RB

    • TBX-52**

006100 TCX-1-1400-36 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- -X -

R160 905RB

-TBX-52--

006120 TCX-1-1400-37 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924**

006140 TCX-1-1400-38 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924**

006160 TCX-1-1400-39 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 14 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -----------. ----......

SUMMARY

EXAMINATION AREA CATGY NDE - - -------- O U T A G E INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I1 2 1 .2 3 12 I **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 006180 TCX-1-1400-40 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - X -

    • SAP 102924**

006200 TCX-1-1400-41 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - - X -

    • SAP 102924**

006220 TCX-1-1400-42 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -- -X -

    • SAP 102924**

006240 TCX-1-1400-43 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD BS.30 2 - -- -X -

-SAP 102924**

006260 TCX-1-1400-44 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- - X -

    • SAP 102924**

006280 TCX-1-1400-45 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924**

006300 TCX-1-1400-46 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - - X -

    • SAP 102924**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: is INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI - .. . ..

SUMMARY

EXAMINATION AREA CATGY NDE - .-------- O U T A G E----------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~*CALIBRATION BLOCK-REACTOR COOLANT TCX-RCPCRV-01 006320 TCX-i-1400-47 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -- X -

    • SAP 102924**

006340 TCX-1-1400-48 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924**

006360 TCX-I-1400-49 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924**

006380 TCX-I-1400-50 B-G-1 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - -X -

    • SAP 102924--

006400 TCX-I-1400-Si B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - - -

    • SAP 102924**

006420 TCX-I-1400-52 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - - -

    • SAP 102924**

006440 TCX-1-1400-53 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - -- - -

    • SAP 102924**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 16 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE 0 U TOUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK" REACTOR COOLANT TCX-RCPCRV-01 006460 TCX-1-1400-54 B-G-1 UT 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 2 - - - X -

  • -SAP 102924**

006600 TCX-1-1400-1 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- -X -

R160 905RB 006620 TCX-1-1400-2 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- -X -

R160 905RB 006640 TCX-1-1400-3 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - X -

R160 905RB 006660 TCX-I-1400-4 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - X -

R160 905RB 006680 TCX-1-1400-5 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - - X -

R160 905RB 006700 TCX-1-1400-6 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - -X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 17 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD C T IX.-----------.-----------.-----------

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1i 2 1 2 3 1 2 **CALIBRATION BLOCK" REACTOR COOLANT TCX-RCPCRV-01 006720 TCX-1-1400-7 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X -

R160 905RB 006740 TCX-1-1400-8 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - - X -

R160 905RB 006760 TCX-1-1400-9 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

R160 905RB 006780 TCX-1-1400-10 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

R160 905RB 006800 TCX-1-1400-11 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X -

R160 905RB 006820 TCX-1-1400-12 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

R160 905RB 006840 TCX-I-1400-13 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - -X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 18 INSERVICE INSPECtION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ PLAN STATUS_ _ PRESERVICE YEAR I FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE I1 2.....OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11I2 12 3 1 2 I ~CALIBRATION BLOCK-REACTOR COOLANT TCX-RCPCRV-01 006860 TCX-1-1400-14 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 - X -

RI60 905RB 006880 TCX-1-1400-15 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - - X -

R160 905RB 006900 TCX-1-1400-16 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - -- - X -

R160 905RB 006920 TCX-1-1400-17 B-G-1 VT°I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - -- - X -

R160 905RB 006940 TCX-1-1400-18 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - X -

R160 905RB 006960 TCX-1-1400-19 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - X -

R160 905RB 006980 TCX-1-1400-20 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 19 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI S-OUTAGE----.---------

SUMMARY

EXAMINATION AREA CATGY NOE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK*"

REACTOR COOLANT TCX-RCPCRV-01 007000 TCX-1-1400-21 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

R160 905RB 007020 TCX-i-1400-22 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- -X -

R160 905RB 007040 TCX-1-1400-23 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X -

RI60 905RB 007060 TCX-1-1400-24 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - X -

RI60 905RB 007080 TCX-1-1400-25 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - X -

R160 905RB 007100 TCX-1-1400-26 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - - X -

R160 905RB 007120 TCX-1-1400-27 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - -X -

RI60 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 20 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PLAN STATUS_ PRESERVICE YEAR INSPECTION INTERVAL_ _

FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------.-. --------- .-.- ------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- -.-.--- OUTAGE --- - - --- INSTRUCTIONS NUMBER IDENTIFICATION **CALIBRATION BLOCK**

ITEM NO METH 11 2 1 2 3 12 nr~rrnn i-nfl? BrT' 'ri-v .VC'fli-V17... fl~

REACTOR COOLANT TCX-RCPCRV-01 007140 TCX-I-1400-28 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X R160 905RB 007160 TCX-1-1400-29 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X -

R160 905RB 007180 TCX-i-1400-30 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6. 10 2 - -- -X -

R160 905RB 007200 TCX-1-1400-31 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.I0 2 - X -

R160 905BR 007220 TCX-1-1400-32 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

RI60 905RB 007240 TCX-I-1400-33 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

R160 905RB 007260 TCX-I-1400-34 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 21 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -----------.-. --------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE E .-----.--- -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 12 1 2 3 1 2 I **CALIBRATION BLOCK**

~rnrrn~ rnnT.hM'r COOLANT TCX-RCPCRV-01 REACTOR 007280 TCX-1-1400-35 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - - -

R160 905RB 007300 TCX-1-1400-36 B°G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - - -

R160 905RB 007320 TCX-1-1400-37 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - -- - -

007340 TCX-1-1400-38 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

007360 TCX-1-1400-39 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- - -

007380 TCX-I-1400-40 B-G-I VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - -

007400 TCX-i-1400-41 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X -

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 22 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI I -----------

SUMMARY

EXAMINATION AREA CATGY NDE I- ------- OUTAGE- - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 2.2 I **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 007420 TCX-1-1400-42 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV NUT BG6.10 2 - - X -

007440 TCX-1-1400-43 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - -X -

007460 TCX-1-1400-44 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

007480 TCX-1-1400-45 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

007500 TCX-1-1400-46 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

007520 TCX-I-1400-47 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- -X -

007540 TCX-1-1400-48 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - X -

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 23 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 ~CALIBRATION BLOCK" REACTOR COOLANT TCX-RCPCRV-01 007560 TCX-1-1400-49 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - X -

007580 TCX-I-1400-50 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - -- -X -

007600 TCX-1-1400-51 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

007620 TCX-1-1400-52 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - X -

007640 TCX-I-1400-53 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - -- -X -

007660 TCX-1-1400-54 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 2 - - - X -

007800 TCX-1-1400-1 B-G-i VT-1 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - -X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 24 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 12 I **CALIBRATION BLOCK**

- -- .1 007820 TCX-1-1400-2 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

R160 905RB 007840 TCX-1-1400-3 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - -X -

R160 905RB 007860 TCX-1-1400-4 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - - X -

R160 905RB 007880 TCX-1-1400-5 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER BE6.50 2 - X -

Ri60 905RB 007900 TCX-1-1400-6 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 007920 TCX-1-1400-7 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - -X -

R160 905RB 007940 TCX-I-1400-8 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 25 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI


O TAGE ------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBPER IDENTIFICATION ITEM NO METH 11 2 2 3 12 -- CALIBRATION BLOCK*

REACTOR COOLANT TCX-RCPCRV-01 007960 TCX-1-1400-9 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - -- -X -

R160 905RB 007980 TCX-1-1400-10 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - -X -

R160 905RB 008000 TCX-1-1400-11 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 008020 TCX-1-1400-12 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 008040 TCX-1-1400-13 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 008060 TCX-I-1400-14 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- - X -

R160 905RB 008080 TCX-1-1400-15 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

Ri60 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PACE: 26 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 123 12 I -- CALIBRATION BLOCK-BR.AC~TOB COOLANTr TCX-PCPCPU- Al REACTOR COOLANT TCX-RCPCRV-01 008100 TCX-1-1400-16 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -: - - x -

R160 905RB 008120 TCX-1-1400-17 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - X -

R160 905RB 008140 TCX-1-1400-18 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - X -

R160 905RB 008160 TCX-1-1400-19 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - -X -

R160 905RB 008180 TCX-1-1400-20 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- - X -

R160 905RB 008200 TCX-1-1400-21 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

008220 TCX-1-1400-22 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 27 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 **CALIBRATION BLOCK'*

ý-n ý_, -

008240 TCX-1-1400-23 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - -X -

R160 905RB 008260 TCX-1-1400-24 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

R160 905RB 008280 TCX-I-1400-25 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - X -

R160 905RB 008300 TCX-1-1400-26 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - X -

R160 905RB 008320 TCX-1-1400-27 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - X -

R160 905RB 008340 TCX-1-1400-28 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

R160 905RB 008360 TCX-1-1400-29 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 28 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL. PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC . X I I .. . ..

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ O U T A G E------- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I CALIBRATION BLOCK"*

nv- ---

008380 TCX-I-1400-30 B-Ga1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 008400 TCX-I-1400-31 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 008420 TCX-I-1400-32 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

R160 905RB 008440 TCX-1-1400-33 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- -X -

R160 905RB 008460 TCX-1-1400-34 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- - X -

R160 905RB 008480 TCX-1-1400-35 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- - X -

R160 905RB 008500 TCX-1-1400-36 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - - X -

R160 905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 29 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 -CALIBRATION BLOCK*

REACTOR COOLANT TCX-RCPCRV-01 008520 TCX-1-1400-37 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - X -

008540 TCX-1-1400-38 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - X -

008560 TCX-1-1400-39 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

008580 TCX-1-1400-40 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

008600 TCX-I-1400-41 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

008620 TCX-I-1400-42 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - X -

008640 TCX-1-1400-43 B-G-1 VT-1 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2- - X -

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 30 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I---- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE - .- ------ - O U T A G E ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK" REACTOR COOLANT TCX-RCPCRV-01 008660 TCX-1-1400-44 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - X -

008680 TCX-1-1400-45 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - X -

008700 TCX-1-1400-46 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- - X -

008720 TCX-1-1400-47 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - -X -

008740 TCX-1-1400-48 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - -x -

008760 TCX-1-1400-49 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - X -

008780 TCX-1-1400-50 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - - X -

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 31 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I---------- OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 1 2 -CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCRV-01 008800 TCX-1-1400-51 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - x -

008820 TCX-1-1400-52 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - - -- -X -

008840 TCX-1-1400-53 B-G-1 VT-I 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - X -

008860 TCX-1-1400-54 B-G-1 VT-i 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 2 - -- X -

REACTOR COOLANT TCX-RCPCPR-01 009000 TCX-1-2100-1 B-B UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER LOWER HEAD TO B2.11 2 - X - - - -

SHELL WELD RI61A832RB **TBX-I**

009100 TCX-1-2100-5 B-B UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER UPPER HEAD TO B2.11 2 - X SHELL WELD R6I1A905RB **TBX-I**

009200 TCX-I-2100-6 B-B UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER LONG. WELD (lFT B2.12 2 -

ADJ. WELD 1)

R161A832RB **TBX-I**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 32 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -----------.-. --------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE --- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCPR-01 009300 TCX-1-2100-9 B-B UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER LONG. WELD C1FT B2.12 2 -

ADJ. WELD 5)

R161A905RB **TBX-1-1 009400 TCX-1-2100-10 B-K MT 82 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SUPPORT SKIRT WELD B10.10 2 - -

Ri61AB32RB 009500 TCX-1-2100-11 B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SURGE NOZZLE TO B3.110 2 -

VESSEL WELD R161A832RB **TBX-1**

009550 TCX-1-2100-11IR B-D UT NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER SURGE NOZZLE INNER B3.120 2 - K X

RADIUS R16IA832RB -lTBX-58**

009600 TCX-1-2100-12 B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SPRAY NOZZLE TO B3.110 2 -

VESSEL WELD RI61A905RB **TBX-1**

009650 TCX-1-2100-12IR B-D UT NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER SPRAY NOZZLE INNER B3.120 2 -

RADIUS RI61A905RB **TBX-S5**

009700 TCX-1-2100-13 B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY NOZZLE TO B3.110 2 -

VESSEL WELD R161A905RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PACE: 33 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------.----------- I -------

SUMMARY

EXAMINATION AREA CATGY NDE I - 0U TA GE---- -- ---- -O INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1i1 2 1 2 3 1 2 I CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCPR-01 009750 TCX-1-2100-13IR B-D UT NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY NOZZLE B3.120 EVT 2 - X REFER TO R.G. 1.147 (N-619)

INNER RADIUS RI61A905RB -- TBX-59**

009800 TCX-1-2100-14 B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER RELIEF NOZZLE TO B3.110 2 - X VESSEL WELD R161A905RB **TBX-1**

009850 TCX-1-2100-14IR B-D UT NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER RELIEF NOZZLE B3.120 EVT 2 - X REFER TO R.G. 1.147 (N-619)

INNER RADIUS R661A905RB **TBX-59**

009900 TCX-1-2100-15 B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY NOZZLE TO B3.110 2 - X VESSEL WELD R6 1A905RB **TBX-I**

009950 TCX-1-2100-15IR B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY NOZZLE B3.120 EVT 2 - X REFER TO R.G. 1.147 (N-619)

INNER RADIUS R161A905RB **TBX-59**

010000 TCX-1-2100-16 B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY NOZZLE TO B3.110 2 - X VESSEL WELD RI61A905RB **TBX-I**

010050 TCX-1-2100-16IR B-D UT 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY NOZZLE B3.120 EVT 2 - X REFER TO R.G. 1.147 (N-619)

INNER RADIUS R161A905RB **TBX-59**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 34 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ __PLAN STATUS _ _ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I---- ----------- ---------- I

SUMMARY

EXAMINATION AREA CATGY NDE - ...-.---- 0 U T A G E ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 *CALIBRATION BLOCK*-

REACTOR COOLANT TCX-RCPCPR-01 010100 TCX-1-2100-BI-16 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

PRESSURIZER MANWAY BOLTING B7.20 2 - X (Bl/B16)

RI61A905RB REACTOR COOLANT TCX-RCPCSG-01 010200 TCX-1-3100-1-1 B-B UT 82 TDLR VERIFICATION BOUNDARY.

SG1 CHANNEL HEAD TO TUBESHEET B2.40 - - X -

WELD A23 **TBX-28**

010300 TCX-1-3100-1A B-D UT NA TDLR VERIFICATION BOUNDARY.

SG1 INLET NOZZLE INNER RADIUS EVT 2 - -- X - - REFER TO R.G. 1.147 (N-619)

A23

    • SG-IR**

010400 TCX-1-3100-1B B-D UT NA TDLR VERIFICATION BOUNDARY.

SG1 OUTLET NOZZLE INNER RADIUS EVT 2 - -- x - - REFER TO R.G. 1.147 (N-619)

A23

    • SG-IR**

010500 TCX-1-3100-1Bl-16 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

SG1 HOTLEG MANWAY BOLTING B7.30 2 - - - X (1-B1/I-B16)

A23 010600 TCX-1-3100-1B17-32 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

SG1 COLDLEG MANWAY BOLTING B7.30 2 - - - X - -

(1-B17/1-B32)

A23 REACTOR COOLANT TCX-RCPCSG-02 010700 TCX-1-3100-2-1 B-B UT 82 TDLR VERIFICATION BOUNDARY.

SG2 CHANNEL HEAD TO TUBESHEET B2.40 2 - X - - - -

4 WELD 'T6*(- 2.V "

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 35 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ _ _ PLAN STATUS_ _ _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SOUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATOY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 I -*CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCSG-02 010800 TCX-1-3100-2A B-D UT NA TDLR VERIFICATION BOUNDARY.

SG2 INLET NOZZLE INNER RADIUS EVT 2- - X - REFER TO R.G. 1.147 (N-619)

R1551812RB

    • SGIR**

010900 TCX-1-3100-2B B-D UT NA TDLR VERIFICATION BOUNDARY.

SG2 OUTLET NOZZLE INNER RADIUS EVT 2 - X - - - REFER TO R.G. 1.147 (N-619)

R15SI812RB

    • SGIR**

011000 TCX-1-3100-2B1-16 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

SG2 HOTLEG MANWAY BOLTING B7.30 2 - X - - - -

(2-B1/2-B16)

RI551812RB 011100 TCX-1-3100-2B17-32 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

SG2 COLDLEG MANWAY BOLTING B7.30 2 - X - - - -

(2-BI7/2-B32)

R1551812RB REACTOR COOLANT TCX-RCPCSG-03 011200 TCX-1-3100-3-1 B-B UT 82 TDLR VERIFICATION BOUNDARY.

SG3 CHANNEL HEAD TO TUBESHEET B2.40 2 - X WELD R154K827RB **TBX-28**

011300 TCX-1-3100-3A B-D UT NA TDLR VERIFICATION BOUNDARY.

SG3 INLET NOZZLE INNER RADIUS EVT 2 - - - - -X REFER TO R.G. 1.147 (N-619)

R154K827RB

    • SG-IR**

011400 TCX-1-3100-3B B-D UT NA TDLR VERIFICATION BOUNDARY.

SG3 OUTLET NOZZLE INNER RADIUS EVT 2 - - - - -X REFER TO R.G. 1.147 (N-619)

R154K827RB

    • SG-IR**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 36 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE tI INSTRUCTIONS

-21OUTAGE2---

NUMBER IDENTIFICATION ITEM NO METH 1 2 1 23 1 2 *"CALIBRATION BLOCK" 011500 TCX-1-3100-3Bl-16 B-G-2 VT-I 84 TDLR VERIFICATION BOUNDARY.

SG3 HOTLEG MANWAY BOLTING B7.30 2 - X (3-BI/3-B16)

R154K827RB 011600 TCX-1-3100-3B17-32 B-G-2 VT-1 84 TDLR VERIFICATION BOUNDARY.

SG3 COLDLEG MANWAY BOLTING B7.30 2 - x (3-BI7/3-B32)

R154K827RB 011700 TCX-1-3100-4-1 B-B UT 82 TDLR VERIFICATION BOUNDARY.

SG4 CHANNEL HEAD TO TUBESHEET B2.40 2 - - - - -X WELD A29 -*TBX-28*-

011800 TCX-1-3100-4A B-D UT NA TDLR VERIFICATION BOUNDARY.

SG4 INLET NOZZLE INNER RADIUS EVT 2 - - - - - X REFER TO R.G. 1.147 (N-619)

A29

    • SG-IR**

011900 TCX-1-3100-4B B-D UT NA TDLR VERIFICATION BOUNDARY.

SG4 OUTLET NOZZLE INNER RADIUS EVT 2 - - - - - X REFER TO R.G. 1.147 (N-619)

A29

    • SG-IR**

012000 TCX-1-3100-4BI-16 B-G-2 VT-i 84 TDLR VERIFICATION BOUNDARY.

SG4 HOTLEG MANWAY BOLTING B7.30 2 - - - - - -X (4-B1/4-BI6)

A29 012100 TCX-1-3100-4B17-32 B-G-2 VT-l 84 TDLR VERIFICATION BOUNDARY.

SG4 COLDLEG MANWAY BOLTING B7.30 2 - - - - - X (4-B17/4-B32)

A29

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 37 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

REACTOR COOLANT 29-RC-2-001-WEST-1 012200 TCX-1-4100-1 R-A UT 92 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END R1.20 2 - - -X - B-F WELD.

R157 827RB

    • TBX-57,RV-6**

012300 TCX-1-4100-2 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE R1.20 2 - X - B-J WELD.

R157 827RB

    • TBX-57,RV-6**

012500 TCX-1-4100-4 R-A UT 92 TDLR VERIFICATION BOUNDARY.

REDUCING ELBOW TO SG NOZZLE R1.20 2 - - - X - B-F WELD.

R1541827RB

    • TBX-57**

REACTOR COOLANT 31-RC-2-002-WEST-1 012600 TCX-1-4100-5 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SG NOZZLE TO ELBOW R1.20 2 - - - X B-F WELD.

R1541829RB

    • TBX-57**

REACTOR COOLANT 27.5-RC-2-003-WEST-1 013400 TCX-1-4100-13 R-A UT TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END R1.20 2 - - - K- B-J WELD.

R157 827RB

    • TBX-57,RV-6**

013500 TCX-1-4100-14 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO RV NOZZLE R1.20 2 - -- - - B-F WELD.

R1541827RB

    • TBX-57,RV-6**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 38 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

REACTOR COOLANT 12-RC-2-007-2501R-1 014400 TCX-1-4101-2 R-A UT 92 B-J WELD PIPE TO ELBOW RI.11 2 C -

R1541823RB 014500 TCX-1-4101-3 R-A UT 92 B-J WELD ELBOW TO PIPE Ri.11 2 C -

R1541822RB 014800 TCX-1-4101-6 R-A UT B-J WELD ELBOW TO PIPE Ri. 11 2 C -

R1541817RB

    • TBX-12**

RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 015300 TCX-1-4101-11 R-A UT B-J WELD.

PIPE TO ELBOW R1.20 2 C -

R154A817RB REACTOR COOLANT 10-RC-2-021-2501R-1 015900 TCX-1-4102-4 R-A UT B-J WELD.

ELBOW TO PIPE R1.20 2 - X R1541831RB

    • TBX-9, PDI-03**

016D00 TCX-1-4102-5 R-A UT 92 B-J WELD PIPE TO PIPE Ri.20 2 - X R1541831RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PACE: 39 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SOUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK--

REACTOR COOLANT 10-RC-2-021-2501R-1 016100 TCX-1-4102-6 R-A UT 92 B-J WELD.

PIPE TO ELBOW R1.20 2 - X R1541831RB

-*TBX-9**

REACTOR COOLANT 3-RC-2-019-2501R-1 020200 TCX-1-4105-6 R-A UT 92 B-J WELD.

PIPE TO VALVE R1.11 PT 2 C -

R1541828RB

    • PDI-03**

REACTOR COOLANT 1.5-RC-2-020-250iR-1 020900 TCX-1-4107-4 R-A PT 92 B-J WELD.

PIPE TO ELBOW R1.11 2 C -

R1541828RB 021000 TCX-1-4107-5 R-A PT 92 B-J WELD.

ELBOW TO PIPE RI.I1 2 C -

R1541828RB REACTOR COOLANT 2-RC-2-015-2501R-i 024200 TCX-1-4109-4 R-A PT 92 B-J WELD.

PIPE TO ELBOW RI.11 2 - - - X - -

R1541813RB 024300 TCX-1-4109-5 R-A PT 92 B-J WELD.

ELBOW TO PIPE R1.11 2 - - - X R1541813RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 40 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ _ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I ...... INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METHE 1 2 1 2 3 12 I **CALIBRATION BLOCK*-

CHEMICAL AND VOLUME CONTROL 1.5-CS-2-248-2501R-1 027550 TCX-1-4110-FLG 1 B-G-2 VT-i 92 FLANGE BOLTING B7.50 2 C -

R154183ORB REACTOR COOLANT 29-RC-2-023-WEST-1 027600 TCX-1-4200-1 R-A UT 92 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END R1.20 2 - X - B-F WELD.

R157 827RB

    • TBX-57,RV-6**

027700 TCX-1-4200-2 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE R1.20 2 - - - X - B-J WELD.

R157 827RB

    • TBX-57,RV-6**

027900 TCX-1-4200-4 R-A UT 92 TDLR VERIFICATION BOUNDARY.

REDUCING ELBOW TO SG NOZZLE Rl.20 2 - - X B-F WELD.

R1SSJ827RB

    • TBX-57**

REACTOR -i 31-,-2-v24-WESl-028000 TCX-1-4200-5 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SG NOZZLE TO ELBOW R1.20 2 - -X - B-F WELD.

R155J829RB

    • TBX-57**

028300 TCX-1-4200-8 R-A UT TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE RI.20 2 - X - B-J WELD.

R154J817RB

    • TBX-57**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 41 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC . X I I .. . ..

SU4MMARY EXAMINATION AREA CATGY NDE - ...-.---- 0 U T A G E----------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 S **CALIBRATION BLOCK" REACTOR COOLANT 27.5-RC-2-025-WEST-1 028800 TCX-1-4200-13 R-A UT TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END R1.20 2 - -- - X - RB-J WELD.

R157 827RB

    • TBX-57,RV-6**

028900 TCX-1-4200-14 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO RV NOZZLE R1.20 2 - -- -X - B-F WELD.

R154J827RB

    • TBX-57,RV-6**

REACTOR COOLANT 10-RC-2-037-2501R-1 029800 TCX-1-4201-4 R-A UT B-J WELD.

ELBOW TO PIPE R1.20 2 - X - - - -

R154J831RB

    • TBX-9, PDI-03**

029900 TCX-1-4201-5 R-A UT B-J WELD.

PIPE TO ELBOW R1.20 2 - X - - -

R154J831RB

    • TBX-9, PDI-03**

030000 TCX-1-4201-6 R-A UT B-J WELD.

ELBOW TO PIPE RI.20 2 - X - - -

R154J831RB

    • TBX-9, PDI-03**

REACTOR COOLANT 6-RC-2-029-2501R-1 034300 TCX-1-4203-11 R-A UT 92 B-J WELD.

PIPE TO ELBOW R1.20 2 - X - - - -

R154J831RB

    • TBX-5**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 42 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE1---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 23 1 2 C**ALIBRATION BLOCK**

REACTOR COOLANT 29-RC-2-040-WEST-1 040900 TCX-1-4300-1 R-A UT 92 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END R1.20 2 - X - B-F WELD.

R157 827RB

    • TBX-57,RV-6**

041000 TCX-1-4300-2 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE R1.20 2 - - X - B-J WELD.

R157 827RB

    • TBX-57,RV-6-*

REACTOR COOLANT 31-RC-2-041-WEST-1 041600 TCX-1-4300-8 R-A UT 92 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE R1.20 - X - B-J WELD.

R154K817RB

    • TBX-57**

REACTOR COOLANT 27.5-RC-2-042-WEST-1 041900 TCX-1-4300-11 R-A UT 92 TDLR VERIFICATION BOUNDARY.

RC PUMP DISCHARGE NOZZLE TO R1.20 2 - - X - - - B-J WELD.

PIPE R154KB27RB **TBX-57**

REACTOR COOLANT 2.75-RC-2-042-WEST-1 042100 TCX-1-4300-13 R-A UT TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END R1.20 2 - - -X - B-J WELD.

R157 827RB

    • TBX-57,RV-6**

042200 TCX-1-4300-14 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO RV NOZZLE R1.20 2 - X - B-F WELD.

R157 827RB

    • TBX-57,RV-6**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 43 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR i FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI i--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 i -CALIBRATION BLOCK" SAFETY INJECTION I0-SI-2-181-2501R-1 043600 TCX-1-4301-9 R-A B-J WELD.

PIPE TO ELBOW Rl. 16 2 - - - X -

R154K832RB

    • TBX-9 ,**

043700 TCX-1-4301-10 R-A UT B-J WELD.

ELBOW TO PIPE RI.16 2 - - X - - -

R154K831RB

    • TBX-9 ,**

REACTOR COOLANT 6-RC-2-046-2501R-1 047600 TCX-1-4303-11 R-A UT 92 B-J WELD.

PIPE TO ELBOW RI.20 2 - - - "X -

R154K831RB

    • TBX-S**

REACTOR COOLANT 3-RC-2-052-2501R-1 048800 TCX-1-4304-4 R-A UT 92 B-J WELD.

PIPE TO ELBOW R1.11 2 C -

R154K814RB

    • PDI-03**

CHEMICAL AND VOLUME CONTROL 3-RC-2-052-2501R-I 050800 TCX-1-4304-24 R-A UT 92 B-J WELD.

PIPE TO VALVE RI. II 2 - - X - - -

R154KB26RB REACTOR COOLANT 29-RC-2-058-WEST-I 059200 TCX-I-4400-1 R-A UT 92 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END R1.20 2 - - - X - B-F WELD.

R157 827RB

    • TBX-57,RV-6**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 44 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME P1ERIOD PERIOD PERIOD SEC. XI ...........- I -----------

SUMMARY

EXAMINATION AREA CATGY NDE - ---- OUTAGE- ------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I1 2 1 2 3 1 2 **CALIBRATION BLOCK*

REACTOR COOLANT 29-RC-2-058-WEST-1 059300 TCX-1-4400-2 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE R1.20 2 - - X - B-J WELD R157 827RB

    • TBX-57,RV-6**

REACTOR COOLANT 27.5-RC-2-060-WEST-1 060400 TCX-1-4400-13 R-A UT TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END R1.20 2 - - - X - B-J WELD.

R157 827RB

    • TBX-57,RV-6**

060500 TCX-1-4400-14 R-A UT 92 TDLR VERIFICATION BOUNDARY.

SAFE END TO RPV NOZZLE R1.20 2 - - -X - B-F WELD.

R157 827RB

-*TBX-57,RV-6**

REACTOR COOLANT 12-RC-2-069-2501R-1 061500 TCX-1-4401-2 R-A UT B-J WELD.

PIPE TO ELBOW R1.11 2 - X R154L823RB

    • TBX-12, PDI-03**

061700 TCX-1-4401-4 R-A UT B-J WELD. REPLACES WELD PIPE TO ELBOW R1.20 2 - X TCX-1-4101-4. REFER TO SECTION R154L817RB 6.0 OF THE PROGRAM PLAN.

    • TBX-12, PDI-03**

061800 TCX-1-4401-5 R-A UT B-J WELD.

ELBOW TO PIPE R1.11 2 - X - - - -

R154L817RB

  • -TBX-12, PDI-03**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 45 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

REACTOR COOLANT 14-RC-2-135-2501R-1 075100 TCX-1-4500-2 R-A UT 92 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE RI.I 2 - - X B-J WELD.

R154L832RB

    • TBX-19**

075200 TCX-1-4500-3 R-A UT 92 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE Ri.11 2 - - X - B-J WELD.

R154L832RB REACTOR COOLANT 6-RC-2-096-2501R-1 075600 TCX-1-4501-1 R-A UT 92 B-F WELD.

PRESSURIZER NOZZLE TO SAFE END R1.20 2 - - - X RI61Eg05RB

    • DMCB-1**

076400 TCX-1-4501-9 R-A UT B-J WELD.

PIPE TO ELBOW R1.20 2 - X R161E905RB

    • TBX-5 , PDI-03**

076500 TCX-1-4501-10 R-A UT B-J WELD.

ELBOW TO PIPE RI.20 2 -

R161Eg05RB

    • TBX-5 , PDI-03**

076600 TCX-1-4501-11 R-A UT 92 B-J WELD.

PIPE TO VALVE (FLANGED) R1.11 2 -

RI61E905RB

    • TBX-5 **

REACTOR COOLANT 6-RC-2-108-2501R-1 078900 TCX-1-4504-1 R-A UT 92 TDLR VERIFICATION BOUNDARY.

PRESSURIZER NOZZLE TO SAFE END R1.20 2 - - - X B-F WELD.

R161E905RB -,rpP CG3-i t

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 46 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 I "CALIBRATION BLOCK**

REACTOR COOLANT 4-RC-2-087-2501R-1 083500 TCX-1-4505-19 R-A UT B-J WELD.

PIPE TO PIPE R1.11 2 - - - X R160B913RB

-*TBX-4 , PDI-03**

REACTOR COOLANT 4-RC-2-018-2501R-1 083700 TCX-1-4505-21 R-A UT B-J WELD.

PIPE TO PIPE R1.20 2 - - - X - -

RG61D883RB

    • TBX-4 , PDI-03**

REACTOR COOLANT 6-RC-2-163-2501R-1 083900 TCX-1-4505-23 R-A UT B-J WELD.

PIPE TO PIPE R1.20 2 - - - X R161DS08RB

    • TBX-5 , PDI-03**

REACTOR COOLANT 4-RC-2-075-2501R-1 084600 TCX-1-4506-7 R-A UT B-J WELD.

PIPE TO REDUCER R1.20 2 - - - X - -

Ri61D905RB

    • TBX-4 , PDI-03**

REACTOR COOLANT 6-RC-2-161-2501R-1 084700 TCX-1-4506-8 R-A UT B-J WELD.

REDUCER TO PIPE R1.20 2 - - - X - -

RI61D906RB

-*TBX-5 , PDI-03*-

REACTOR COOLANT 6-RC-2-147-2501R-1 085600 TCX-1-4506-17 R-A UT B-J WELD. REPLACES WELD TEE TO PIPE Ri. 11 2 - - - X - - TCX-1-4506-15.

RI6OB913RB

DATE: 07/08/06 COMANCHE pEAK UNIT 2 PAGE: 47 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I CALIBRATION BLOCK**

SAFETY INJECTION 3-SI-2-303-2501R-1 090500 TCX-1-4600-4 R-A UT B-J WELD.

PIPE TO PIPE R1.20 2 - X R154A823RB

    • PDI-03**

090600 TCX-1-4600-5 R-A UT B-J WELD.

PIPE TO ELBOW R1.20 2 - X R154A823RB

    • PDI-03**

090700 TCX-1-4600-6 R-A UT B-J WELD.

ELBOW TO PIPE R1.20 2 - - - - -X R154A823RB

    • PDI-03**

SAFETY INJECTION 3-SI-2-033-2501R-1 090900 TCX-1-4600-8 R-A UT B-J WELD.

REDUCER TO PIPE RI.20 2 - - - - - - X R154D818RB

    • PDI-03**

091400 TCX-1-4600-13 R-A UT B-J WELD.

PIPE TO REDUCER R1.20 2 - - - - -X R154D818RB

    • PDI-03**

SAFETY INJECTION 3-SI-2-339-2501R-1 091600 TCX-1-4600-15 R-A UT B-J WELD.

PIPE TO ELBOW R1.20 2 - - X R154D822RB

    • PDI-03**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE - 48 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE . . .

- . . . OUTAGE------------ i INSTRUCTIONS NUMBER IDENTIFICATION j 1 2 1 23 1 2 i **CALIBRATION BLOCK**

ITEM NO METH SAFETY INJECTION 3-SI-2-339-2501R-I 091700 TCX-I-4600-16 R-A UT B-J WELD.

ELBOW TO PIPE RI.20 2 - - X R154D822RB

    • PDI-03**

REACTOR COOLANT TCX-RCPCPC-02 092400 TCX-I-5100A-2SBI-12 B-G-2 VT-i 92 TDLR VERIFICATION BOUNDARY.

RC PUMP 2 #1 SEAL BOLTING B7.60 2 - - -X -

(2-B1/2-B12) 092900 TCX-I-5100A-2FBI-24 B-G-1 UT 92 TDLR VERIFICATION BOUNDARY.

RC PUMP 2 MAIN FLNG BLT B6.180 2 - - -X -

(2-B1/2-B24)

    • TBX-54**

093000 TCX-1-510OA-2FLG B-G-1 VT-1 92 TDLR VERIFICATION BOUNDARY.

RC PUMP 2 MAIN FLANGE SURFACE B6.190 2 - X - EXAM TO BE DONE WHEN PUMP IS DISASSEMBLED.

094000 TCX-1-5100C-2CASING B-L-2 VT-3 92 TDLR VERIFICATION BOUNDARY.

RC PUMP 2 CASING - INTERNAL B12.20 2 - -- -X -

SURFACES 094050 TCX-1-510OC-2-1 B-L-1 VT-1 92 TDLR VERIFICATION BOUNDARY.

RC PUMP 2 CASING WELD B12.10 2 - - - -X - SEE R.G. 1.147 (N-619)

RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 094221 TCX-i-4101-8701A-BLT B-G-2 VT-i 92 DWG. 8372D46 VALVE BODY BOLTING 2-8701A B7.70 2 - -

RI54A808RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 49 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I

-OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK-SAFETY INJECTION 10-SI-2-182-2501R-1 094244 TCX-1-4402-8956D-BLT B-G-2 VT-I 92 DWG. 8372D14 VALVE BODY BOLTING 2-8956D B7.70 2 C-RI54L819RB SAFETY INJECTION 6-SI-2-092-2501R-1 094245 TCX-1-4403-8818D-BLT B-G-2 VT-I 92 DWG. 8372D12 VALVE BODY BOLTING 2-8818D B7.70 2 - - - X -

REACTOR COOLANT 6-RC-2-096-2501R-1 094249 TCX-1-4501-8010A-BLT B-G-2 VT-I 92 DWG. DS-C-66075 VALVE BODY BOLTING 2-8010A B7.70 2 C -

R161A905RB RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 094261 TCX-1-4101-8701A-INT B-M-2 VT-3 NA DWG. 8372D46. EXAM TO BE VALVE INTERNAL SURFACES B12.50 2 - X - - CONDUCTED WHEN VALVE IS R154A817RB DISASSEMBLED.

094279 TCX-1-4402-8956D-INT B-M-2 VT-3 DWG. 8372D14 VALVE INTERNAL SURFACES B12.50 x SAFETY INJECTION 6-SI-2-092-2501R-1 094280 TCX-I-4403-8818D-INT B-M-2 VT-3 NA DWG. 8372D12 VALVE INTERNAL SURFACES B12.50 2 - - X

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 50 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ _ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD I ASME PERIOD PERIOD PERIOD I SEC. XI I---- ----------- ---------- I

SUMMARY

EXAMINATION AREA CATGY NDE - ---------- O U T A G E - -------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I *CALIBRATION BLOCK**

--- I~~ -ý-V-lov--

094282 TCX-1-4501-8010A-INT B-M-2 VT-3 NA DWG. DS-C-66075 VALVE INTERNAL SURFACES B12.50 2 C -

Ri61A905RB

4.2 CLASS 2 NDE This subsection describes the examination areas and NDE methods for the Class 2 pressure retaining components and associated component integral welded attachments as specified in Article IWC of the Code. For pressure testing, see Section 5.

Class 2 valve body welds have been grouped according to design, size, function, and service in a system in accordance with Table IWC-2500-1, Category C-G, Note I of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "".

Group I - 8" Forged Gate Valves, MS Safety Isolation 2MS-026 2MS-063 2MS-098 * (reference TCX-2-2300 for location) 2MS-134 Group 2 - 18" Forged Gate Valves, Main Feedwater Isolation 2FW-071 2FW-077 * (reference TCX-2-2202 for location) 2FW-083 2FW-089 Group 3 - 6" Forged Check Valves, Feedwater 2FW-191 2FW-192 2FW-193 * (reference TCX-2-2204 for location) 2FW-194 2FW-195 2FW-196 2FW-1 97 2FW-198 2FW-199 2FW-200 2FW-201 2FW-202 4.2 Page 1 of 2

Group 4 - 6" Forged Gate Valves, Auxiliary Feedwater Isolation 2FW-203 * (reference TCX 2403 for location) 2FW-204 2FW-205 2FW-206 Group 5 - 12" Forged Gate Valves, Containment Spray Isolation 2CT-0026 2CT-0028 * (reference TCX 2578 for location) 2CT-0078 2CT-0084 Group 6 - 12" Forged Gate Valve, Safety Injection 2SI-0048 * (reference TCX-2-2582 for location) 4.2 Page 2 of 2

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 51 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I112 12 3 1 2 **CALIBRATION BLOCK-MAIN STEAM TCX-RCPCSG-03 094300 TCX-2-1100-3-2 C-A UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 TUBESHEET TO SHELL WELD C1.30 2 C - REFER TO R.G. 1.147 (N-435-1)

R155JB32RB FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

094400 TCX-2-1100-3-3 C-A UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 LOWER SHELL CIRC. WELD C1. 10 2 C - REFER TO R.G. 1.147 (N-435-1)

R15SJ832RB FOR SURFACE EXAMINATION ALTERNATIVE

    • TBX-27**

094500 TCX-2-1100-3-5 C-A UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 TRANSITION CONE TO LOWER C1.10 2 - - - - -X REFER TO R.G. 1.147 (N-435-1)

SHELL WELD FOR SURFACE EXAMINATION ALTERNATIVE.

  • -TBX-27**

094600 TCX-2-1100-3-6 C-A UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 UPPER SHELL TO TRANSITION C1.10 2 - - X REFER TO R.G. 1.147 (N-435-1)

CONE WELD FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

094700 TCX-2-1100-3-8 C-A UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 HEAD TO SHELL WELD C1.20 2 - - - - -X REFER TO R.G. 1.147 (N-435-1)

FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

094800 TCX-2-1100-3-9 C-B UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 FEEDWATER NOZZLE TO C2.21 MT 2 C -

VESSEL WELD R155J832RB **TBX-27**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 52 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -.- ------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE ......

- OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I1 2 1 2 3 1 2 **CALIBRATION BLOCK" MAIN STEAM TCX-RCPCSG-03 094900 TCX-2-1100-3-9IR C-B UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 FEEDWATER NOZZLE INNER C2.22 2 C -

RADIUS R155JS32RB **TBX-56**

095000 TCX-2-1100-3-10 C-B UT 92 TDLR VERIFICATION BOUNDARY.

SC 3 AUX FEEDWATER NOZZLE TO C2.21 MT 2 - - - - -X VESSEL WELD

    • TBX-27**

095100 TCX-2-1100-3-11 C-B UT 92 TDLR VERIFICATION BOUNDARY.

SG 3 MAIN STEAM NOZZLE TO C2.21 MT 2 - - - - - -X VESSEL WELD

    • TBX-27**

CHEMICAL AND VOLUME CONTROL TCX-CSAHEL-01 095300 TCX-2-1110-1 C-A UT 92 TDLR VERIFICATION BOUNDARY.

EXCESS LETDOWN HX HEAD TO C1.20 2 C - REFER TO R.G. 1.147 (N-435-I)

FLANGE WELD FOR SURFACE EXAMINATION R154E808RB ALTERNATIVE.

    • TBX-8**

RESIDUAL NEAT REMOVAL TCX-RHAHRS-01 095600 TCX-2-1120-1-1 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

RHR HX1 HEAD TO SHELL WELD C1.20 2 - X FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-30**

095700 TCX-2-1120-1-2 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

RHR HX1 SHELL TO FLANGE WELD C1.10 2 - - - - -X FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-30**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 53 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS - PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE -1OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 12 3 1 2 I CALIBRATION BLOCK**

RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 095800 TCX-2-1120-1-3 C-B UT 92 RHR RXI INLET NOZZLE TO SHELL C2.21 PT 2 - - - - - -X WELD

    • TBX-51**

096000 TCX-2-1120-1-4 C-B UT 92 RHR HXI OUTLET NOZZLE TO SHELL C2.21 PT 2 - - -- - x WELD

    • TBX-51**

096200 TCX-2-1120-1-1WS C-C PT 92 RHR HXI WELDED SUPPORT C3. 10 2 - - - - -x 790SB 096300 TCX-2-1120-1-2WS C-C PT 92 RHR HX1 WELDED SUPPORT C3.10 2 - - - - -x 790SB CHEMICAL AND VOLUME CONTROL TCX-CSAHLD-01 096400 TCX-2-1130-1 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

HORIZONTAL LETDOWN HX HEAD TO C1.20 2 - X FOR SURFACE EXAMINATION FLANGE WLD ALTERNATIVE.

R81 811SB **TBX-31**

CHEMICAL AND VOLUME CONTROL TCX-TRAHLR-01 096500 TCX-2-1140-1 C-A PT 92 PT IN LIEU OF UT PER CODE CASE LETDOWN REHEAT HX HEAD TO Cl.20 2 - - - x - - N-435-1.

SHELL WELD 833SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 54 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- - ---- OUTAGE - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

CHEMICAL AND VOLUME CONTROL TCX-TRAHLR-01 096600 TCX-2-1140-2 C-A PT 92 PT IN LIEU OF UT PER CODE CASE LETDOWN REHEAT HX SHELL TO C1.10 2 - - - X - - N-435-1.

FLANGE WELD 833SB CHEMICAL AND VOLUME CONTROL TCX-CSAHRG-01 096700 TCX-2-1150-1 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

REGENERATIVE HX HEAD TO TEE Cl. 20 2 - - X - - FOR SURFACE EXAMINATION WELD ALTERNATIVE.

R155C833RB **TBX-.**

096800 TCX-2-1150-2 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

REGENERATIVE HX HEAD TO TEE C1.20 2 - X - - FOR SURFACE EXAMINATION WELD ALTERNATIVE.

R15SC833RB **TBX-9**

096900 TCX-2-1150-3 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

REGENERATIVE MX SHELL TO TEE C1.1O 2 - - X - - - - FOR SURFACE EXAMINATION WELD ALTERNATIVE.

R155C833RB **TBX-8**

097000 TCX-2-1150-4 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

REGENERATIVE HX SHELL TO TEE Cl. 10 2 - X - - - - FOR SURFACE EXAMINATION WELD ALTERNATIVE.

R155C833RB **TBX-8**

097100 TCX-2-1150-5 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

REGENERATIVE HX SHELL TO C1.30 2 - X - - - - FOR SURFACE EXAMINATION TUBESHEET WELD ALTERNATIVE.

R155C833RB **TBX-8**

097200 TCX-2-1150-6 C-A UT 92 REFER TO R.G. 1.147 (N-435-1)

REGENERATIVE HX SHELL TO C1.30 2 - X - - - - FOR SURFACE EXAMINATION TUBESHEET WELD ALTERNATIVE.

R155C833RB **TBX-8**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 55 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK" CONTAINMENT SPRAY CP2-CTAHCS- 01 097410 TCX-2-1180-1-1 C-A UT 92 CT HX1 HEAT TO SHELL WELD C1.20 2 - - X - - -

    • TBX-31**

097420 TCX-2-1180-1-2 C-A UT 92 CT HX1 SHELL TO FLANGE WELD C1.10 2 - - X - - -

    • TBX-31**

097430 TCX-2-1180-1-3 C-B UT 92 CT HXI INLET NOZZLE TO SHELL C2.21 PT 2 - - X -

WELD

    • TBX-15.SSCB-I**

097444 TCX-2-1180-1-4 C-B UT 92 CT HXI OUTLET NOZZLE TO SHELL C2.21 PT 2 - - X - - -

WELD

    • TBX-15,SSCB-I1*

CONTAINMENT SPRAY TCX-CTAHCS-01 097450 TCX-2-1180-i-1WS C-C PT 92 CT HX1 WELD SUPPORT C3.10 2 - - X -

097460 TCX-2-1180-1-2WS C-C PT 92 CT HXi WELDED SUPPORT C3.10 2 - - X - - -

FEEDWATER 6-FW-2-095-1303-2 108500 TCX-2-2103-10 R-A UT C-F-2 WELD.

PIPE TO PIPE R1.20 2 - - - X erjt3r PoZ-.S R100B864SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 56 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE - l -..... INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 23 1 2 **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-095-1303-2 108600 TCX-2-2103-11 C-F-2 UT C-F-2 WELD.

ELBOW TO PIPE C5.51 2 - - - X -

RI00B864SB

    • TBX-35, PDI-02**

108700 TCX-2-2103-12 R-A UT C-F-2 WELD.

PIPE TO ELBOW R1.20 2 - - - X - -

R100864SB

    • TBX-35, PDI-02**

FEEDWATER 16-FW-2-074-1303-2 115400 TCX-2-2201-1 R-A UT NA TDLR VERIFICATION BOUNDARY.

NOZZLE TO REDUCING ELBOW Ri.II 2 - X - - C-F-2 WELD.

R1551841RB

    • TBX-20**

FEEDWATER 6-FW-2-096-1303-2 124200 TCX-2-2204-24 C-F-2 UT C-F-2 WELD.

PIPE TO ELBOW C5.51 2 - - - X - - -

Ri00D864SB

    • TBX-35, PDI-02**

124300 TCX-2-2204-25 R-A UT C-F-2 WELD.

ELBOW TO PIPE R1.20 2 - - X - - -

R100D864SB

    • TBX-35, PDI-02**

124400 TCX-2-2204-26 R-A UT C-F-2 WELD.

PIPE TO PIPE R1.20 2 - - X -

RIO00D864SB

    • TBX-35, PDI-02**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 57 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI i--------- OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 1 2 1 2 3 1 2 I **CALIBRATION BLOCK-FEEDWATER 6-FW-2-097-1303-2 141000 TCX-2-2303-25 R-A UT 92 TDLR VERIFICATION BOUNDARY.

PIPE TO EBLOW R1.20 2 - - X C-F-2 WELD.

R100C864SB

    • TBX-35, PDI-02**

141100 TCX-2-2303-26 R-A UT C-F-2 WELD.

ELBOW TO PIPE R1.20 2 - - X - - -

R100C864SB

    • TBX-35, PDI-02**

141200 TCX-2-2303-27 R-A UT C-F-2 WELD.

PIPE TO PIPE R1.20 2 - - X - - -

R100C864SB

    • TBX.35, PDI-02**

FEEDWATER 6-FW-2-098-1303-2 156800 TCX-2-2403-23 R-A UT C-F-2 WELD.

ELBOW TO PIPE R1.20 2 - X R10OA864SB

    • TBX-35, PDI-02**

156900 TCX-2-2403-24 R-A UT 92 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW R1.20 2 - X C-F-2 WELD.

R100A864SB

    • TBX-35, PDI-02**

157000 TCX-2-2403-25 R-A UT C-F-2 WELD.

ELBOW TO PIPE R1.20 2 X R10OA864SB

    • TBX-35, PDI-02**

RESIDUAL HEAT REMOVAL 12-RH-2-003-601R-2 158100 TCX-2-2500-2 R-A UT C-F-i WELD.

PIPE TO PIPE RI.20 2 - X V"r"r..- j POZ R154A817RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 58 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I 2OUTAGE -. INSTRUCTIONS I 1 2 12 3 NUMBER IDENTIFICATION ITEM NO METH 1 2 I -CALIBRATION BLOCK*

RESIDUAL MEAT REMOVAL 12-RH-2-003-601R-2 158500 TCX-2-2500-6 R-A UT C-F-I WELD.

PIPE TO ELBOW RI.20 2 - X R77B 817SB

    • TBX-II**

158600 TCX-2-2500-7 R-A UT C-F-i WELD..

ELBOW TO PIPE R1.20 2 - X R77B 816SB

    • TBX-I1**

RESIDUAL HEAT REMOVAL 16-RH-2-007-601R-2 160900 TCX-2-2500-30 R-A UT C-F-I WELD.

PIPE TO REDUCING ELBOW R1.20 2 - X R53 775SB

    • TBX-15**

SAFETY INJECTION 16-SI-2-076-601R-2 162000 TCX-2-2500-41 R-A UT RC-F-I WELD.

PIPE TO ELBOW R1.20 2 - X R65 803SB

    • TBX-15**

RESIDUAL HEAT REMOVAL 12-RH-2-004-601R-2 162800 TCX-2-2501-6 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 - X R77A 817SB

    • TBX- I*i 162900 TCX-2-2501-7 R-A UT C-F-i WELD.

ELBOW TO PIPE Ri.20 2 X R77A 816SB

    • TBX-II**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 59 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI OUTAGE I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 2 *~CALIBRATION BLOCKs*

RESIDUAL HEAT REMOVAL 16-RH-2-008-601R-2 165700 TCX-2-2501-35 R-A UT C-F-I WELD.

PIPE TO REDUCING ELBOW R1.20 2 - X R52 775SB

    • TBX-15**

SAFETY INJECTION 16-SI-2-075-601R-2 166900 TCX-2-2501-47 R-A UT C-F-i WELD.

PIPE TO PIPE R1.20 2 - X R63 798SB

    • TBX-15**

167000 TCX-2-2501-48 R-A UT C-F-1 WELD.

PIPE TO ELBOW R1.20 2 - X R63 803SB

    • TBX-15**

RESIDUAL HEAT REMOVAL 10-RH-2-01i-60IR-2 167900 TCX-2-2520-5 R-A UT C-F-I WELD.

ELBOW TO PIPE R1.20 2 - - - - -X R67 796SB RESIDUAL HEAT REMOVAL 12-RH-2-033-601R-2 169000 TCX-2-2520-18 R-A UT C-F-i WELD.

PIPE TO REDUCING ELBOW R1.20 2 - - - - -X R69 797SB

    • TBX-I., **

RESIDUAL HEAT REMOVAL 8-RH-2-063-601R-2 172200 TCX-2-2520-50 R-A UT C-F-1 WELD.

PIPE TO ELBOW R1.20 2 - - X R54 780SB

    • TBX-42, **

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 60 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC . XI I -----------.... . .. .. ..-

SUMMARY

EXAMINATION AREA CATGY NDE I- -.-.--- OUTAGEE--- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 *CALIBRATION BLOCK**

RESTDUAL REAT PPMOVAT. $--2-O6i-*01P-2 172300 TCX-2-2S20-51 R-A UT C-F-i WELD.

ELBOW TO PIPE R1.20 2 - - - - - -X R54 780SB

    • TBX-42,
  • 172400 TCX-2-2520-52 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 - - - - -X R54 780SB

    • TBX-42, **

172500 TCX-2-2520-53 R-A UT C-F-1 WELD.

ELBOW TO PIPE Fl. 20 2 - - - - -X R54 780SB

    • TBX-42,**

172B00 TCX-2-2520-56 R-A UT C-F-1 WELD.

PIPE TO ELBOW Ri.20 2 - - - - - -X R54 780SB

    • TBX-42**

RESIDUAL HEAT REMOVAL 10-RH-2-016-601R-2 173600 TCX-2-2521-4 R-A UT C-F-1 WELD.

REDUCING ELBOW TO PIPE R1.20 2 - X - - - -

R68 797SB 173700 TCX-2-2521-5 R-A UT C-F-I WELD.

PIPE TO PIPE R1.20 2 - X - - -

R68 797SB RESIDUAL HEAT REMOVAL 12-RH-2-034-601R-2 175100 TCX-2-2521-19 R-A UT C-F-I WELD.

PIPE TO REDUCING ELBOW RI.20 2 - X - - - -

R68 797SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PACE: 61 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I- --------

OUTA GE I------ INSTRUCTIONS S112 12 3 1 2 *~CALIBRATION BLOCK**

NUMBER IDENTIFICATION ITEM NO METH RESIDUAL HEAT REMOVAL 8-RH-2-064-601R-2 178200 TCX-2-2521-50 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 - X R51 781SB C-F-* WELD.

178300 TCX-2-2521-51 R-A ELBOW TO PIPE R1.20 2 - X R51 781SB R-A UT C-F-1 WELD.

178400 TCX-2-2521-52 PIPE TO ELBOW RI.20 2 - X - - - -

R51 781SB R-A C-F-1 WELD.

178500 TCX-2-2521-53 ELBOW TO PIPE R1.20 2 - X R51 781SB SAFETY INJECTION 10-SI-2-095-2501R-2 183900 TCX-2-2530-33 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 C -

R77B 812SB

    • TBX-9, PDI-04**

184000 TCX-2-2530-34 R-A UT 92 C-F-I WELD.

ELBOW TO PIPE R1.20 2 C -

R77B 813SB

    • TBX-9, PDI-04**

184500 TCX-2-2530-39 R-A UT 92 C-F-I WELD.

PIPE TO ELBOW RI.20 2 C -

R77B 823SB

    • TBX-9, PDI-04**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 62 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD I ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE-------------I O U T A G E -2 ISR TON INSTRUCTIONS 1

NUMBER IDENTIFICATION ITEM NO METH S1 2 1 2 3 1 2 -*CALIBRATIO! NJBLOCK-SAFETY INJECTION 10-SI-2-079-601R-2 186100 TCX-2-2531-14 R-A C-F-i WELD.

ELBOW TO PIPE R1.20 2 C -- - - -

R77A 820SB

  • -TBX-10, PDI-03**

RESIDUAL HEAT REMOVAL 10-RH-2-025-601R-2 187000 TCX-2-2532-5 R-A UT C-F-i WELD.

ELBOW TO PIPE R1.20 2 - - X -

R62F 789SB SAFETY INJECTION 10-SI-2-078-601R-2 188300 TCX-2-2532-18 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 - - X -

R77B 820SB

  • TBX-10*-

188400 TCX-2-2532-19 R-A UT C-F-i WELD.

ELBOW TO PIPE R1.20 2 - - X - - -

R77B 820SB

  • -TBX-10**

RESIDUAL HEAT REMOVAL 8-RH-2-027-601R-2 190100 TCX-2-2532-36 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 - - X -

R62F 797SB 190200 TCX-2-2532-37 R-A UT C-F-1 WELD.

ELBOW TO PIPE R1.20 2 - - X - - -

R62F 797SB T

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 63 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR F IRST SECOND THIRD ASME I P.ERIOD PERIOD PERIOD SEC. XI


OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I1 2 1 2 3 1 2 I *CALIBRATION BLOCK" RESIDUAL HEAT REMOVAL 8-RH-2-027-601R-2 190300 TCX-2-2532-38 R-A UT C-F-i WELD.

PIPE TO ELBOW R1. 20 2 - - X -

R62F 797SB SAFETY INJECTION I0-SI-2-083-2501R-2 192200 TCX-2-2534-1 R-A UT 92 C-F-i WELD.

PIPE TO PIPE (PENETRATION) R1.20 2 - X RI54D821RB

    • TBX-09, PDI-03**

192300 TCX-2-2534-2 R-A UT 92 C-F-I WELD.

PIPE TO TEE RI.20 2 - X R154D821RB

    • TBX-09, PDI-03**

SAFETY INJECTION 8-SI-2-088-2501R-2 192900 TCX-2-2534-8 R-A UT 92 C-F-1 WELD.

PIPE TO ELBOW R1.20 2 - X R154D817RB

    • TBX-18, PDI-03**

193000 TCX-2-2534-9 R-A UT 92 C-F-1 WELD.

ELBOW TO PIPE R1.20 2 - X RI54D817RB

    • TBX-18, PDI-03*

CONTAINMENT SPRAY 16-CT-2-002-151R-2 197200 TCX-2-2536-8 R-A UT C-F-1 WELD.

ELBOW TO PIPE R1.20 2 - - - - -X R63 803SB

    • TBX-48,**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 64 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVALýt -PLAN STATUS_ _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I .. . ..


... .. .. I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGEE--- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

CONTAINMENT SPRAY 16-CT-2-001-15IR-2 198100 TCX-2-2537-7 R-A UT C-F-I WELD.

ELBOW TO PIPE R1.20 2 - -. - X R65 803SB

    • TBX-48, **

SAFETY INJECTION 6-SI-2-038-151R-2 215200 TCX-2-2541-8 R-A UT C-F-I WELD.

ELBOW TO PIPE Ri.20 2 - X R62 775SB 215300 TCX-2-2541-9 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 - - - - -x R62 786SB 215400 TCX-2-2541-10 R-A UT C-F-I WELD ELBOW TO PIPE R1.20 2 - X R62 786SB 215500 TCX-2-2541-11 R-A UT C-F-i WELD PIPE TO PIPE R1.20 2 - - - - -x R62 786SB SAFETY INJECTION 6-SI-2-041-15iR-2 216600 TCX-2-2541-22 R-A UT C-F-I WELD.

PIPE TO TEE Ri.20 2 - - - - -X R62F 789SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 65 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

.. OUTAGE ----------- -

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 I CALIBRATION BLOCK**

SAFETY INJECTION 6-SI-2-041-iSiR-2 216700 TCX-2-2541-23 R-A UT C-F-I WELD.

TEE TO PIPE R1.20 2 - - X R62F 789SB SAFETY INJECTION 6-SI-2-311-151R-2 217000 TCX-2-2541-26 R-A UT C-F-1 WELD.

PIPE TO ELBOW R1.20 2 - - X R62F 789SB 217100 TCX-2-2541-27 R-A UT C-F-I WELD.

ELBOW TO PIPE R1.20 2 - - - - -X R62F 789SB

    • w**

SAFETY INJECTION 6-SI-2-070-151R-2 221500 TCX-2-2542-9 R-A UT C-F-I WELD.

ELBOW TO PIPE R1.20 2 - X -

R60 775SB 221600 TCX-2-2542-10 R-A UT C-F-i WELD.

PIPE TO FLANGE R1.20 2 - - X R60 778SB 221700 TCX-2-2542-11 R-A UT C-F-1 WELD.

FLANGE TO PIPE R1.20 2 - - X R60 786SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 66 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI i--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 -*CALIBRATION BLOCK**

SAFETY INJECTION 6-SI-2-070-151R-2 221800 TCX-2-2542-12 R-A UT C-F-i WELD.

PIPE TO ELBOW R1.20 2 -

R60 786SB 221900 TCX-2-2542-13 R-A UT C-F-i WELD.

ELBOW TO PIPE R1.20 2 - X - - - -

R60 786SB SAFETY INJECTION 14-SI-2-071-601R-2 304000 TCX-2-2581-7 R-A UT 92 C-F-1 WELD. REPLACES WELD ELBOW TO PIPE R1.20 2 - X TCX-2-2581-6. REFER TO SECTION R70 793SB 6.0 OF THE ISI PROGRAM PLAN.

    • TBX-47, PDI-03**

SAFETY INJECTION 14-SI-2-072-601R-2 305800 TCX-2-2581-25 R-A UT C-F-I WELD.

PIPE TO ELBOW RI.20 2 - - X R70 793SB

    • TBX-47, PDI-03-*

AUXILIARY FEEDWATER 4-AF-2-019-1303-2 312929 AF-2-SB-062A-10 R-A UT 83 C-F-2 WELD.

ELBOW TO PIPE R1.20 2 - - - X - -

R10OD861SB

    • PDI-02**

312937 AF-2-SB-062A-FW9 R-A UT 83 C-F-2 WELD.

PIPE TO ELBOW R1.20 2 - - - X - -

RI0OD861SB

    • PDI-02**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 67 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE 2OUTAGE I-. INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 12 3 1 2 I **CALIBRATION BLOCK**

AUXILIARY FEEDWATER 4-AP-2-021-2003-2 312947 AF-2-SB-061-6 R-A UT 83 C-F-2 WELD.

PIPE TO ELBOW R1.20 2 - - - - - -X RI00B854SB

    • PDI-02**

312948 AF-2-SB-061-7 R-A UT 83 C-F-2 WELD.

ELBOW TO PIPE R1.20 2 - - - - -X R100B854SB

    • PDI-02**

AUXILIARY FEEDWATER 4-AF-2-022-2003-2 312951 AF-2-SB-060-11A R-A UT 83 C-F-2 WELD.

PIPE TO ELBOW R1.20 2 - X -

R100C860SB

    • PDI-02**

312952 AF-2-SB-060-12 R-A UT 83 C-F-2 WELD.

ELBOW TO PIPE R1.20 2 - X - - - -

R100C860SB

    • PDI-02**

AUXILIARY FEEDWATER 4-AF-2-024-2003-2 312960 AF-2-SB-052-23 R-A UT 83 C-F-2 WELD.

PIPE TO ELBOW R1.20 2 - X R100A854SB

    • PDI-02**

312961 AF-2-SB-052-24A R-A UT 83 C-F-2 WELD.

ELBOW TO PIPE Ri.20 2 - X R10O0A854SB

    • PDI-02**

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 68 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC . XI - .. . ..

SUMMARY

EXAMINATION AREA CATGY NDE I- - ----- O U T A G E------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK*

AUXILIARY FEEDWATER 4-AF-2-054-2003-2 312976 AF-2-SB-062A-8 R-A UT 83 C-F-2 WELD.

TEE TO PIPE R1.20 2 - - - X R10OD861SB

    • PDI-02*

RESIDUAL HEAT REMOVAL TCX-RHAPRH-01 313000 TCX-2-3100-1WS C-C PT 92 RHR PUMP 01 WELDED SUPPORT C3.10 2 - X 313100 TCX-2-3100-2WS C-C PT 92 RHR PUMP 01 WELDED SUPPORT C3.10 2 - X 313200 TCX-2-3100-3WS C-C PT 92 RHR PUMP 01 WELDED SUPPORT C3.10 2 - X CHEMICAL AND VOLUME CONTROL TCX-CSAPCH-01 313300 TCX-2-3110-1WS C-C PT 92 CHG PUMP 01 WELDED SUPPORT C3.10 2 - -- - X -

313400 TCX-2-3110-2WS C-C PT 92 CHG PUMP 01 WELDED SUPPORT C3.10 2 - - - X -

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 69 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- __PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI ----------- ---------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE - - -------- O U T A G E ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~*CALIBRATION BLOCK*

CHEMICAL AND VOLUME CONTROL TCX-CSAPCH-01 313500 TCX-2-3110-3WS C-C PT 92 CHG PUMP 01 WELDED SUPPORT C3.10 2 - - X -

313600 TCX-2-3110-4WS C-C PT 92 CHG PUMP 01 WELDED SUPPORT C3.10 2 - - - - X -

SAFETY INJECTION TCX-STAPSI-02 314000 TCX-2-3140-2B1-32 C-D UT 92 EXAMINE IN 2ND INTERVAL SI Bl THRU B32 SI PUMP 02 STUDS C4.30 2 - X PUMP, TSN 431907, S/N 51928.

    • TBX-53**

FEEDWATER 18-FW-2-035-2003-2 500700 TCX-2-2202-FW077 C-G 92 TDLR VERIFICATION BOUNDARY.

VALVE BODY WELD 2FW-0077 (ALT C6.20 2 C - REFER TO R.G.1.147 (N-617).

2-HV-2135) DWG. 75830 R100A856SB FEEDWATER 6-FW-2-092-2003-2 501000 TCX-2-2204-FW193 C-G MT 92 DWG. 454KAB1-001. REFER TO VALVE BODY WELD 2FW-0193 C6.20 2 - X R.G.1.147 (N-617).

R100C863SB MAIN STEAM 8-MS-2-223-1303-2 501200 TCX-2-2300-MS098 C-G MT 92 TDLR VERIFICATION BOUNDARY.

VALVE BODY WELD 2MS-0098 C6.20 2 - - - X - - - DWG. 75730-1. REFER TO R.G.1.147 (N-617)

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE - 70 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 -*CALIBRATION BLOCK**

FEEDWATER 6-FW-2-094-2003-2 502300 TCX-2-2403-FW203 C-G 92 DWG. 435KAB2-002. REFER TO VALVE BODY WELD 2FW-0203 C6.20 2 - - -- -X - R.G.1.147 (N-617).

CONTAINMENT SPRAY 12-CT-2-006-151R-2 502400 TCX-2-2578-CT028 C-G PT 92 DWG. 75780. REFER TO R.G.

VALVE BODY WELD 2CT-0028 C6.20 2 - - - X - - 1.147 (N-617).

CONTAINMENT SPRAY 12-SI-2-031-151R-2 502600 TCX-2-2582-SI048 C-G PT 92 DWG. 75780-1. REFER TO R.G.

VALVE BODY WELD 2SI-0048 C6.20 2- - - - - x - 1.147 (N-617).

4.3 COMPONENT SUPPORTS This subsection describes the examination areas and requirements for the Class 1, 2 and 3 component supports and Class 3 Integral Welded Attachments as specified in Article IWF and IWD of the Code, respectively. For pressure testing of Class 3 components, see Section 5.

In lieu of the requirements of Technical Specifications relating to snubbers, specifically those ISI requirements (e.g., plans, schedules, reports, inspector involvement, and Code Data Reports) of ASME Section XI, snubbers shall be demonstrated operable by performance of the augmented inservice inspection program as described in the ASME OM Code, Subsection ISTD.

4.3 Page 1 of 1

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 71 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------.-.---------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS

-21OUTAGE2---

NUMBER IDENTIFICATION ITEM NO METH I 1 2 1 23 1 2 I **CALIBRATION BLOCK--

CHEMICAL & VOLUME CONTROL 3-CS-2-080-2501R-1 600000 TCX-1-4105-H1 F-A VT-3 NA SPRING CS-2-080-401-C41S F1.10 2 C R1541829RB CHEMICAL & VOLUME CONTROL 3-CS-2-235-2501R-1 600300 TCX-1-4304-H23 F-A VT-3 NA STRUT CS-2-235-467-C41R Fl. 10 2 - - - - -X 826RB

~t4~MT~&T. L 17ATt1M~

CHEMICAL & VOLUME CONTROL 2-CS-2-105-250IR-1 600400 TCX-1-4207-Hl F-A VT-3 NA STRUT CS-2-RB-002-704-1 F1.10 2 - X -

R154B826RB CHEMICAL & VOLUME CONTROL 2-CS-2-112-2501R-1 600900 TCX-1-4507-H16 F-A VT-3 NA SPRING CS-2-RB-021-701-1 F1.10 2 - - - - -X 818RB 601200 TCX-1-4507-H13 F-A VT-3 NA STRUT CS-2-RB-021-704-1 F1.10 2 - - X 818RB CHEMICAL & VOLUME CONTROL 1.5-CS-2-248-2501R-1 603600 TCX-1-4110-H3 F-A VT-3 NA SNUBBER CS-2-RB-037A-701-1 F1.10 2 C -

R1541827RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 72 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI -------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE .. .OUTTAGE-E ------ -I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 I *~CALIBRATION BLOCK**

CHEMICAL & VOLUME CONTROL 1.5-CS-2-248-2501R-1 603700 TCX-1-4110-14 F-A VT-3 NA SNUBBER CS-2-RB -037A-702-1 Fl. 10 2 C -

R1541828RB 603800 TCX-1-4110-H5 F-A VT-3 NA SNUBBER CS-2-RB-037A-703-1 F1.10 2 C -

R1541828RB 603900 TCX-1-4110-H6 F-A VT-3 NA SNUBBER CS-2-RB-037A-704-1 F1.10 2 C -

R1541831RB CHEMTCAL & VOLUME CONTROL 2-CS-2-103-2501R-1 604100 TCX-1-4110-Hl F-A VT-3 NA SNUBBER CS-2-RB-037B-702-1 F1.10 2 C -

R1541826RB REACTOR COOLANT 12-RC-2-007-2501R-1 605400 TCX-1-4101-H2 F-A VT- 3 NA STRUT RC-2-007-401-C41R Fl. 10 2 C -

R1541819RB 605500 TCX-1-4101-H1 F-A VT-3 NA SNUBBER RC-2-007-402-C41K F1.10 2 C -

R1541819RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 73 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ _____ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE l O U T A G E - --------- -0 INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 1 2 3 1 2 ~CALIBRATION BLOCK" 608800 TCX-1-4304-H6 F-A VT-3 NA STRUT RC-2-052-409-C41R F1.1I0 2 C -

R154K814RB 608900 TCX-1-4304-H7 F-A VT-3 NA STRUT RC-2-052-410-C41R F1.1( 0 2 C -

R154K814RB REACTOR COOLANT 4-RC-2-075-2501R-1 610900 TCX-1-4506-H21 F-A VT-3 NA STRUT RC-2-075-417-C71R Fl. 10 2 - - - - -X 902RB 611000 TCX-1-4506-H20 F-A VT-3 NA STRUT RC-2-075-420-C71R F1.10 2 - - - - -X 895RB REACTOR COOLANT 4-RC-2-087-2501R-1 612500 TCX-1-4505-H30 F-A VT-3 NA SNUBBER RC-2-087-403-C81K F1.10 2 - - X 908RB 612600 TCX-1-4505-H31 F-A VT-3 NA SNUBBER RC-2-087-407-C81K Fl.10 2 - - - - - -X 91ORB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 74 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 123 12 I **CALIBRATION BLOCK" REACTOR COOLANT 4-RC-2-087-2501R-1 612700 TCX-1-4505-H32 F-A VT-3 NA STRUT RC-2-087-408-C81R F1. 10 2 - - X 911RB REACTOR COOLANT 4-RC-2-088-2501R-1 612800 TCX-1-4506-H29 F-A VT-3 NA STRUT RC-2-088-401-C81R Fl. 10 2 - - - - -X 909RB 612900 TCX-1-4506-H33 F-A VT-3 NA SPRING RC-2-088-403-C81S F1.10 - X 913RB 613000 TCX-1-4506-H32 F-A VT-3 NA SNUBBER RC-2-088-404-C81K F1. 10 - - - -X 913RB 613100 TCX-1-4506-H31 F-A VT-3 NA SNUBBER RC-2-088-408-C81K FI.10 2 - - - - -X 911RB 613200 TCX-1-4506-H30 F-A VT-3 NA STRUT RC-2-088-409-C81R F1.10 2 - - - - - -X 911RB REACTOR COOLANT 3-RC-2-111-2501R-1 613500 TCX-1-4504-H1 F-A VT-3 NA SNUBBER RC-2-111-402-C81K FI.10 2 - - - - -X 907RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 75 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRDf ASME II PERIOD PERIOD PERIOD SEC. XI .------.-... .. I I -----------

SUMMARY

EXAMINATION AREA CATGY NDE I

E --- - ---- -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 *~CALIBRATION BLOCK**

REACTOR COOLANT 3-RC-2-111-2501R-1 613600 TCX-1-4504-H2 F-A VT-3 NA SNUBBER RC-2-111-403-C81K Fl. 10 2 - - X R161E907RB 613700 TCX-1-4504-H3 F-A VT-3 NA HANGER RC-2-111-404-C81S F1.10 2 - - - - -X R161ES07RB REACTOR COOLANT 14-RC-2-135-2501R-1 613900 TCX-1-4500-Hl F-A VT-3 NA SNUBBER RC-2-135-402-C41K Fl.10 2 - - - - -X R154L832RB 614000 TCX-1-4500-H4 F-A VT-3 NA SPRING RC-2-135-407-C41S F1.10 2 - - - - X - -

832RB 614200 TCX-1-4500-H5 F-A VT-3 NA STRUT RC-2-135-409-CS1R Fl.10 2 - - - X 843RB REACTOR COOLANT 3-RC-2-146-2501R-1 614400 TCX-1-4504-H5 F-A VT-3 NA SNUBBER RC-2-146-402-C81K Fl.10 2 - - - - -X R161E907RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 76 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE 1 2-- -OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S112 1 23 1 2 I *~CALIBRATION BLOCK**

REACTOR COOLANT 3-RC-2-146-2501R-1 614500 TCX-1-4504-H6 F-A VT-3 NA SNUBBER RC-2-146-403-C81K Fl. 10 2 - - - - -X R161E907RB 614600 TCX-1-4504-H4 F-A VT-3 NA SNUBBER RC-2-146-406-C81K Fl. 10 2 - - - - - -X R161E908RB REACTOR COOLANT 6-RC-2-147-2501R-1 614800 TCX-1-4506-H34 F-A VT-3 NA SNUBBER RC-2-147-403-C81K Fl.10 2 - - - - - -X R16OB913RB 615000 TCX-1-4506-H2 F-A VT-3 NA SPRING RC-2-147-406-C81S Fl. 10 2 - X -

R161A913RB 615050 TCX-1-4506-H2 B-K PT 92 WELDED ATTACHMENT RC-2-147-406-C81S B10.20 2 - X -

R161A913RB 615100 TCX-1-4506-H35 F-A VT-3 NA STRUT RC-2-147-408-C81R F1.10 2 - - - - -X R160B913RB REACTOR COOLANT 6-RC-2-161-2501R-1 615200 TCX-1-4506-H1 F-A VT-3 NA BOX RC-2-161-402-C81A F1. 10 2 - - X R161E909RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 77 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD I SEC. XI -------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 123 12 I ~CALIBRATION BLOCK**

REACTOR COOLANT 6-RC-2-161-2501R-1 615250 TCX-1-4506-Hl B-K PT 92 WELDED ATTACHMENT RC-2-161-402-C81A B10.20 2 - - - - -X R161E909RB REACTOR COOLANT 4-RC-2-162-2501R-1 615600 TCX-1-4506-H28 F-A VT-3 NA STRUT RC-2-162-401-C81R Fl.10 2 - - - - -X R160B909RB 615700 TCX-1-4506-H27 F-A VT-3 NA SNUBBER RC-2-162-402-C81K F1.10 2 - - - - - -X R160B909RB 615800 TCX-1-4506-H26 F-A VT-3 NA STRUT RC-2-162-403-C81R F1.10 2 - - - - - -X RI6OB909RB 615900 TCX-1-4506-H25 F-A VT-3 NA STRUT RC-2-162-404-C81R F1.10 2 - - - - -X R16OB909RB REACTOR COOLANT 6-RC-2-163-2501R-1 616000 TCX-1-4505-Hl F-A VT-3 NA BOX RC-2-163-402-C81A Fl.10 2 - - - - -X R161E908RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 78 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE i OUTAGE INSTRUCTIONS 12 3 1 2 I NUMBER IDENTIFICATION ITEM NO METH I 1 2 *CALIBRATION BLOCK*

REACTOR COOLANT 6-RC-2-163-2501R-1 616050 TCX-1-4505-H1 B-K PT 92 WELDED ATTACHMENT RC-2-163-402-CSIA B10.20 2 - - - - - -X R161E908RB REACTOR COOLANT 4-RC-2-164-2501R-1 616200 TCX-1-4505-H28 F-A VT-3 NA STRUT RC-2-164-402-C81R F1. 10 2 - - - X - - -

R16OB908RB REACTOR COOLANT 4-RC-2-162-2501R-1 616300 TCX-1-4505-H27 F-A VT-3 NA STRUT RC-2-164-403-C81R Fl. 10 2 - - X - - -

R16OB908RB REACTOR COOLANT 2-RC-2-015-2501R-1 616500 TCX-1-4109-H2 F-A VT-3 NA SNUBBER RC-2-RB-027-702-1 F1.10 2 - X - - - -

R1541813RB 616600 TCX-1-4109-H3 F-A VT-3 NA SPRING RC-2-RB-027-703-1 Fl.10 2 - - X R1541813RB 616700 TCX-1-4109-H4 F-A VT-3 NA SNUBBER RC-2-RB-027-704-1 F1.10 2 - X - - - -

R1541813RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 79 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD I ASME I PERIOD PERIOD PERIOD I SEC. XI I

SUMMARY

EXAMINATION AREA CATGY NDE I E --- - ---- INSTRUCTIONS

-OUTAGE NUMBER IDENTIFICATION ITEM NO METH I 1 2 1 2 3 1 2 **CALIBRATION BLOCK*

REACTOR COOLANT 2-RC-2-015-2501R-1 616800 TCX-1-4109-H5 F-A VT-3 NA SNUBBER RC-2-RB-027-705-1 F1.10 2 - - X -

R1541813RB 617100 TCX-1-4109-H8 F-A VT-3 NA SNUBBER RC-2-RB-027-708-1 F1.10 2 - - X -

R1541813RB RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-l 618800 TCX-1-4101-H3 F-A VT-3 NA SPRING RH-2-001-404-C41S Fl. 10 2 C -

R1541B17RB 618900 TCX-1-4101-H9 F-A VT-3 NA STRUT RH-2-001-405-C41R F1.10 2 C -

R154A817RB 619200 TCX-1-4101-H8 F-A VT-3 NA SNUBBER RH-2-001-408-C41K Fl.10 2 C -

R154A817RB RESIDUAL HEAT REMOVAL 12-RH-2-002-2501R-1 619400 TCX-1-4401-H9 F-A VT-3 NA STRUT RH-2-002-401-C41R F1.10 2 - - - X -

817RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: so INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SOUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I1 2 1 2 3 1 2 I *~CALIBRATION BLOCK**

RESIDUAL HEAT REMOVAL 12-RH-2-002-2501R-1 620000 TCX-1-4401-H4 F-A VT-3 NA STRUT RH-2-002-408-C41R F1. 10 2 - o - X -

817RB SAFETY INJECTION 3-SI-2-033-2501R-1 620100 TCX-1-4600-H3 F-A VT-23 NA SPRING SI-2-033-405-C41S Fl.10 2- X - -

R154D818RB 620125 TCX-1-4600-H4 F-A VT-3 NA STRUT SI-2-033-401-C41R Fl.10 2 - - - X R154D818RB 620150 TCX-1-4600-H5 F-A VT-3 NA SNUBBER SI-2-033-403-C41K F1. 10 2 - - - X - -

R154D818RB SAFETY INJECTION 6-SI-2-089-2501R-1 620300 TCX-1-4103-H1 F-A VT-3 NA SI-2-089-402-C41S Fl. 10 2 - X R154TA27RR 620350 TCX-1-4103-H1 B-K PT 92 SPRING SI-2-089-402-C41S B10.20 2 - X R1541828RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: el INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- -----------.-.---------

SUMMARY

EXAMINATION AREA CATGY NDE I1 2 1-3OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S112 1 23 1 2 I CALIBRATION BLOCK**

SAFETY INJECTION 6-SI-2-089-2501R-1 620400 TCX-1-4103-H3 F-A VT-3 NA SNUBBER SI-2-089-403-C41K Fl. 10 2 - X R1541820RB 620500 TCX-1-4103-H6 F-A VT-3 NA SNUBBER SI-2-089-404-C41K F1.10 2 - X R1541826RB 620600 TCX-1-4103-H5 F-A VT-3 NA SNUBBER SI-2-089-405-C41K F1.10 2 - X R1541826RB SAFETY INJECTION 8-SI-2-090-2501R-1 620800 TCX-1-4202-H1 F-A VT-3 NA SPRING SI-2-090-402-C41S F1. 10 2 - X R154J826RB 620850 TCX-1-4202-H1 B-K PT 92 WELDED ATTACHMENT SI-2-090-402-C41S B10.20 2 - X RI54J826RB 620900 TCX-1-4202-H3 F-A VT-3 NA SNUBBER SI-2-090-403-C41K Fl. 10 2 - X - - -

RI54J82ORB 621000 TCX-1-4202-H4 F-A VT-3 NA SNUBBER SI-2-090-404-C41K F1.10 2 - X - - - -

RI54J825RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 82 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ - _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I -OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S112 1 23 1 2 I **CALIBRATION BLOCK**

SAFETY INJECTION 8-SI-2-091-2501R-1 621200 TCX-1-4302-H3 F-A VT-3 NA STRUT SI-2-091-401-C41R Fl. 10 2 - - - X -

816RB SAFETY INJECTION 6-SI-2-101-2501R-1 622100 TCX-1-4203-H1 F-A VT-3 NA SPRING SI-2-101-403-C41S Fl. 10 2 - -

R154J828RB 622150 TCX-1-4203-H1 B-K PT 92 WELDED ATTACHMENT SI-2-101-403-C41S B10.20 2 - -

R154J828RB 622200 TCX-1-4203-H2 F-A VT-3 NA STRUT SI-2-101-407-C41R F1. 10 2 - X -

R154B823RB SAFETY INJECTION 6-SI-2-102-2501R-1 622400 TCX-1-4303-H1 F-A VT-3 NA SPRING SI-2-102-403-C41S F1.10 2 - - X - - -

828RB 622450 TCX-1-4303-Hl B-K PT 92 WELDED ATTACHMENT SI-2-102-403-C41S B10.20 2 - - X - - -

828RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 83 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ _ PLAN STATUS_ _ _PRESERVICE YEAR FIRST SECOND THIRD I ASME pERIOD P PERIOD PERIOD I S EC . X I - . . .. .. ..-

SUMMARY

EXAMINATION AREA CATGY NDE I- -.-.--- 0 U T A G E - ----- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 j *'CALIBRATION BLOCK**

SAFETY INJECTION 1.5-SI-2-027-2501R-1 624700 TCX-1-4306-H12 F-A VT-3 NA STRUT SI-2-RB-007-702-1 F1.10 2 - - - - -X R154D815RB 625000 TCX-1-4306-HIS F-A VT-3 NA U-BOLT SI-2-RB-007-705-1 Fl.10 2 - - X R154CS15RB 625100 TCX-1-4306-H16 F-A VT-3 NA STRUT SI-2-RB-007-706-1 F1.10 2 - X R154C815RB 625300 TCX-1-4306-Hl8 F-A VT-3 NA STRUT SI-2-RB-007-708-1 F1. 10 2 - - - - -X R154C815RB 625600 TCX-l-4306-H21 F-A VT-3 NA U-BOLT SI-2-RB-007-711-1 F1. 10 2 - X Rl54C817RB 626000 TCX-1-4306-H2 F-A VT-3 NA STRUT SI-2-RB-008-702-1 F1.10 2 - - - - - -X R154D818RB 626300 TCX-l-4306-H5 F-A VT-3 NA STRUT SI-2-RB-008-707-1 F1. 10 2 - - -- -X R154H818RB

DATE: 0'7/08/06 COMANCHE PEAK UNIT 2 PAGE: 84 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE { INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 123 12 **CALIBRATION BLOCK-SAFETY INJECTION 1.5-SI-2-027-2S01R-1 626400 TCX-1-4306-H6 F-A VT-3 NA STRUT SI-2-RB-008-708-1 F1.10 2 - - - - - - X R154H818RB 626600 TCX-1-4306-M8 F-A VT-3 NA STRUT SI-2-RB-008-710-1 F1.10 2 - - -- - X R154D817RB SAFETY INJECTION 1.5-SI-2-201-2501R-1 627400 TCX-1-4306-H29 F-A VT-3 NA SNUBBER SI-2-RB-009-707-1 Fl.10 2 - - - - -X R154K828RB 627600 TCX-1-4306-H32 F-A VT-3 NA SNUBBER SI-2-RB-009-709-1 F1.10 2 - X R154K829RB SAFETY INJECTION 2-SI-2-067-2501R-1 627800 TCX-1-4302-HI F-A VT-3 NA SNUBBER SI-2-RB-010A-705-1 Fl.10 2 - - - X - - -

815RB SAFETY INJECTION 1.5-SI-2-026-2501R-1 628100 TCX-1-4205-H14 F-A VT-3 NA U-BOLT SI-2-RB-032-701-1 F1.10 2 - - X - - - -

R154B817RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 85 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------

SUMMARY

EXAMINATION AREA CATGY NDE - OUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 **CALIBRATION BLOCK**

SAFETY INJECTION 1.5-SI-2-026-2501R-1 628400 TCX-1-4205-H17 F-A VT-3 NA SNUBBER SI-2-RB-032-704-1 F1.10 2 - - X -

R154BS17RB 629100 TCX-1-4205-H4 F-A VT-3 NA SNUBBER SI-2-RB-033-703-1 F1.10 2 - X -

R154BS18RB 629200 TCX-1-4205-H3 F-A VT-3 NA SNUBBER SI-2-RB-033-704-1 FI.10 2 - X - - - -

R154B818RB SAFETY INJECTION 2-SI-2-086-2501R-1 634600 TCX-1-4404-H6 F-A VT-3 NA SPRING SI-2-RB-052-705-1 F1.10 2 - - -X -

819RB REACTOR COOLANT TCX-RCPCSG-01 640040 TCX-1-3100-1CS1 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-01-S1 F1.40 2 - - - X - TDLR VERIFICATION BOUNDARY.

A23 812RB 640050 TCX-1-3100-1CS2 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-01-S2 F1.40 2 - - - X - - TDLR VERIFICATION BOUNDARY.

A23 812RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 86 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI O----------OUTAGE

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I -*CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCSG-01 640060 TCX-1-3100-1CS3 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-01-S3 F1.40 2 - - - - X - TDLR VERIFICATION BOUNDARY.

A23 812RB 640070 TCX-1-3100-1CS4 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-01-S4 F1.40 2 - - - - X TDLR VERIFICATION BOUNDARY.

A23 812RB 640080 TCX-1-3100-1LS1 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-01-Li F1.40 2 - - - - X 1457F31. TDLR VERIFICATION A23 835RB BOUNDARY.

640090 TCX-1-3100-1LS2 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-01-L2 F1.40 2 - - - X 1457F31. TDLR VERIFICATION A23 835RB BOUNDARY.

640100 TCX-1-3100-1LS3 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-01-L3 F1.40 2 - -- X 1457F31. TDLR VERIFICATION A23 835RB BOUNDARY.

640110 TCX-1-3100-1US1 F-A VT-3 NA S.C. UPPER LATERAL SUPPORT.

TCX-RCESSG-01-Ul F1.40 2 - - - X - - 1457F34. TDLR VERIFICATION A24 859RB BOUNDARY.

640120 TCX-1-3100-1US2 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-01-U2 F1.40 2 - - - X - - 1457F34. TDLR VERIFICATION A24 859RB BOUNDARY.

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 87 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL -PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD I SEC. XI-.----------- ----------.----------- I

SUMMARY

EXAMINATION AREA CATGY NOE - ------------ OUTAGE ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 *~CALIBRATION BLOCK" REACTOR COOLANT TCX-RCPCSG-01 640130 TCX-1-3100-1US3 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-01-U3 F1.40 2 - - X 1457F35. RING. TDLR A24 859RB VERIFICATION BOUNDARY.

640140 TCX-1-3100-1SN1 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-01-SN1 F1.40 2 - - - X - TULR VERIFICATION BOUNDARY.

A24 859RB 640150 TCX-1-3100-1SN2 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-01-SN2 F1.40 2 - - - X - - TDLR VERIFICATION BOUNDARY.

A24 859RB REACTOR COOLANT TCX-RCPCSG-02 640160 TCX-1-3100-2CS1 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-02-Sl F1.40 2 - X TDLR VERIFICATION BOUNDARY.

R1551812RB 640170 TCX-1-3100-2CS2 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-02-S2 F1.40 2 - - X - - TDLR VERIFICATION BOUNDARY.

R1551812RB 640190 TCX-1-3100-2CS3 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-02-S3 F1.40 2 - TDLR VERIFICATION BOUNDARY.

R1551812RB 640200 TCX-1-3100-2CS4 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-02-S4 F1.40 2 - X - - - - TDLR VERIFICATION BOUNDARY.

R1551812RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 88 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 **CALIBRATION BLOCK*"

REACTOR COOLANT TCX-RCPCSG-02 640210 TCX-1-3100-2LS1 F-A VT-3 NA S.C. LOWER LATERAL SUPPORT.

TCX-RCESSG-02-LI F1.40 2 - X - - - - 1457F31. TDLR VERIFICATION R1551812RB BOUNDARY.

640220 TCX-1-3100-2LS2 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-02-L2 F1.40 2 - - X - - - - 1457F31. TDLR VERIFICATION R1551835RB BOUNDARY.

640230 TCX-1-3100-2LS3 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-02-L3 F1.40 2 - - X - 1457F31. TDLR VERIFICATION R1551835RB BOUNDARY.

640240 TCX-1-3100-2US1 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-02-Ul F1.40 2 - X - - - - 1457F34. TDLR VERIFICATION R1551859RB BOUNDARY.

640250 TCX-1-3100-2US2 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-02-U2 F1.40 2 - X - - - - 1457F34. TDLR VERIFICATION R1551859RB BOUNDARY.

640260 TCX-1-3100-2US3 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-02-U3 F1.40 2 - X - - - - 1457F35. RING. TDLR R1551859RB VERIFICATION BOUNDARY.

640270 TCX-1-3100-2SN1 F-A VT-3 NA S.G. HYD. SHOCK SUPRESSORS.

TCX-RCESHS-02-SN1 F1.40 2 - - X - - - -

R1551859RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 89 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE I ---------OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I112 1 23 12 I **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCSG-02 640280 TCX-1-3100-2SN2 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-02-SN2 F1.40 2 - - X - - - - TDLR VERIFICATION BOUNDARY.

R155I859RB REACTOR COOLANT TCX-RCPCSG-03 640290 TCX-I-3100-3CSI F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-03-SI FI.40 2 - - - - - -X TDLR VERIFICATION BOUNDARY.

RI54K812RB 640300 TCX-I-3100-3CS2 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-03-S2 FI.40 2 - - TDLR VERIFICATION BOUNDARY.

RI54K8I2RB 640310 TCX-I-3100-3CS3 F-A VT--3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-03-S3 FI.40 2 - - - - -X TDLR VERIFICATION BOUNDARY.

R154K812RB 640320 TCX-1-3100-3CS4 F-A VT-3 NA S.C. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-03-S4 FI.40 2 - - X TDLR VERIFICATION BOUNDARY.

R154K812RB 640330 TCX-I-3100-3LS1 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-03-LI FI.40 2 - - - - -X 1457F31. TDLR VERIFICATION R154K827RB BOUNDARY.

640340 TCX-1-3100-3LS2 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-03-L2 FI.40 2 - - X 1457F31. TDLR VERIFICATION R154K827RB BOUNDARY.

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 90 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAG E------- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 I **CALIBRATION BLOCK-*

REACTOR COOLANT TCX-RCPCSG-03 640350 TCX-1-3100-3LS3 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-03-L3 F1.40 2 -. - - - - -X 1457F31. TDLR VERIFICATION R154K827RB BOUNDARY.

640360 TCX-1-3100-3USI F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-03-U1 F1.40 2 - - - - - -X 1457F34. TDLR VERIFICATION R154K859RB BOUNDARY.

640370 TCX-1-3100-3US2 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-03-U2 F1.40 2 - - - - -X 1457F34. TDLR VERIFICATION R154K859RB BOUNDARY.

640380 TCX-1-3100-3US3 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-03-U3 F1.40 2 - - X 1457F35. RING. TDLR R154K859RB VERIFICATION BOUNDARY.

640390 TCX-1-3100-3SN1 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-03-SNI F1.40 2 - - X TDLR VERIFICATION BOUNDARY.

R154K859RB 640400 TCX-1-3100-3SN2 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-03-SN2 F1.40 2 - - - - -X TDLR VERIFICATION BOUNDARY.

R154K859RB REACTOR COOLANT TCX-RCPCSG-04 640410 TCX-1-3100-4CS1 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-04-S1 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

A29 812RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 91 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE--- ----------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

640420 TCX-1-3100-4CS2 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-04-S2 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

A29 812RB 640430 TCX-1-3100-4CS3 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-04-S3 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

A29 812RB 640440 TCX-1-3100-4CS4 F-A VT-3 NA S.G. COLUMN SUPPORT. 1457F29.

TCX-RCESSG-04-S4 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

A29 812RB 640450 TCX-I-3100-4LS1 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-04-LI F1.40 2 - X 1457F31. TDLR VERIFICATION A29 835RB BOUNDARY.

640460 TCX-1-3100-4LS2 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-04-L2 P1.40 2 - X 1457F31. TDLR VERIFICATION A29 835RB BOUNDARY.

640470 TCX-1-3100-4LS3 F-A VT-3 NA S.G. LOWER LATERAL SUPPORT.

TCX-RCESSG-04-L3 F1.40 2 - X 1457F31. TDLR VERIFICATION A29 835RB BOUNDARY.

640480 TCX-1-3100-4US1 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-04-Ul F1.40 2 - - - X 1457F34. TDLR VERIFICATION A30 859RB BOUNDARY.

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 92 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ _ _ PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ---- ---------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE II E--- - - --- -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 12 1 2 3 1 2 I *"CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCSG-04 640490 TCX-1-3100-4US2 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-04-U2 F1.40 2 - - - - X - - 1457F34. TDLR VERIFICATION A30 859RB BOUNDARY.

640500 TCX-1-3100-4US3 F-A VT-3 NA S.G. UPPER LATERAL SUPPORT.

TCX-RCESSG-04-U3 F1.40 2 - - - X 1457F35. RING. TDLR A30 859RB VERIFICATION BOUNDARY.

640510 TCX-1-3100-4SN1 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-04-SNI F1.40 2 - - - xX TDLR VERIFICATION BOUNDARY.

A30 859RB 640520 TCX-1-3100-4SN2 F-A VT-3 NA S.G. HYD. SNUBBER. PD14856.

TCX-RCESHS-04-SN2 F1.40 2 - - - X - - TDLR VERIFICATION BOUNDARY.

A30 859RB REACTOR COOLANT TCX-RCPCPC-01 640530 TCX-1-5100-1PI F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-01-PI F1.40 2 C - 1457F29. TDLR VERIFICATION R154H812RB BOUNDARY.

640540 TCX-1-5100-1P2 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-01-P2 F1.40 2 C - 1457F29. TDLR VERIFICATION R154H812RB BOUNDARY.

640550 TCX-1-5100-1P3 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.'

TCX-RCESPC-01-P3 F1.40 2 C - 1457F29. TDLR VERIFICATION R154HS12RB BOUNDARY.

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 93 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 I **CALIBRATION BLOCK"*

REACTOR COOLANT TCX-RCPCPC-01 640560 TCX-1-5100-1TI F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-01-TI F1.40 2 C - TDLR VERIFICATION BOUNDARY.

R154H830 RB 640570 TCX-1-5100-1T2 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-01-T2 F1.40 2 C - TDLR VERIFICATION BOUNDARY.

R154H830RB 640580 TCX-1-5100-1T3 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-01-T3 F1.40 2 C - TDLR VERIFICATION BOUNDARY.

R154H83ORB REACTOR COOLANT TCX-RCPCPC-02 640590 TCX-1-5100-2P1 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-02-PI F1.40 2 - - - - -X 1457F29. TDLR VERIFICATION A25 812RB BOUNDARY.

640600 TCX-1-5100-2P2 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-02-P2 F1.40 2 - X 1457F29. TDLR VERIFICATION A25 812RB BOUNDARY.

640610 TCX-1-5100-2P3 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-02-P3 F1.40 2 - - - - - -X 1457F29. TDLR VERIFICATION A25 812RB BOUNDARY.

640620 TCX-1-5100-2TI F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-02-T1 F1.40 2 - - - - -X TDLR VERIFICATION BOUNDARY.

A25 830RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 94 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ---- ---------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I "CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCPC-02 640630 TCX-1-5100-2T2 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-02-T2 F1.40 2 - - - - -X TDLR VERIFICATION BOUNDARY.

A25 830RB 640640 TCX-1-5100-2T3 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-02-T3 F1.40 2 - - - - - -X TDLR VERIFICATION BOUNDARY.

A25 830RB REACTOR COOLANT TCX-RCPCPC-03 640650 TCX-1-5100-3P1 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-03-Pl F1.40 2 - - 1457F29. TDLR VERIFICATION R15SJ812RB BOUNDARY.

640660 TCX-1-5100-3P2 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-03-P2 F1.40 2 - 1457F29. TDLR VERIFICATION R155J812RB BOUNDARY.

640670 TCX-1-5100-3P3 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-03-P3 F1.40 2 - 1457F29. TDLR VERIFICATION R155J812RB BOUNDARY.

640680 TCX-1-5100-3T1 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-03-Tl F1.40 2 - X - - - - TDLR VERIFICATION BOUNDARY.

R155J830RB 640690 TCX-1-5100-3T2 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-03-T2 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

RI55J83ORB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 95 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI i--------- OUTAGE

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 i *CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCPC-03 640700 TCX-1-5100-3T3 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-03-T3 F1.40 2 - - TDLR VERIFICATION BOUNDARY.

R155J830RB REACTOR COOLANT TCX-RCPCPC-04 640710 TCX-1-5100-4PI F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-04-P1 F1.40 2 - X 1457F29. TDLR VERIFICATION R155K812RB BOUNDARY.

640720 TCX-1-5100-4P2 F-A VT-3 NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-04-P2 F1.40 2 - X 1457F29. TDLR VERIFICATION R155K812RB BOUNDARY.

640730 TCX-1-5100-4P3 F-A VT- ' NA RC PUMP COLUMN SUPPORTS.

TCX-RCESPC-04-P3 F1.40 2 - X 1457F29. TDLR VERIFICATION R155K812RB BOUNDARY.

640740 TCX-1-5100-4TI F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-04-Tl F1.40 2 - X TDLR VERIFICATION BOUNDARY.

R155K830RB 640750 TCX-1-5100-4T2 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-04-T2 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

R155K830RB 640760 TCX-1-5100-4T3 F-A VT-3 NA RC PUMP TIE RODS. 1457F33.

TCX-RCESPC-04-T3 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

R155K83ORB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 96 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------

OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I **CALIBRATION BLOCK**

REACTOR COOLANT TCX-RCPCPR-01 640770 TCX-1-2100-US1 F-A VT-3 NA PRESSURIZER UPPER LATERAL TCX-RCESPR-01-WI F1.40 2 - X SUPPORTS. 1457F36. TDLR R161A905RB VERIFICATION BOUNDARY.

640780 TCX-1-2100-US2 F-A VT-3 NA PRESSURIZER UPPER LATERAL TCX-RCESPR-01-W2 F1.40 2 - X SUPPORTS. 1457F36. TDLR R161A905RB VERIFICATION BOUNDARY.

640790 TCX-1-2100-US3 F-A VT-3 NA PRESSURIZER UPPER LATERAL TCX-RCESPR-01-W3 F1.40 2 - X SUPPORTS. 1457F36. TDLR R161A905RB VERIFICATION BOUNDARY.

640800 TCX-1-2100-US4 F-A VT-3 NA PRESSURIZER UPPER LATERAL TCX-RCESPR-01-W4 F1.40 2 - X SUPPORTS. 1457F36. TDLR R161A905RB VERIFICATION BOUNDARY.

640810 TCX-1-2100-LS1 F-A VT-3 NA PRESSURIZER LOWER SUPPORT.

TCX-RCESPR-01 F1.40 2 - X TDLR VERIFICATION BOUNDARY.

R161A905RB SAFETY INJECTION 2-SI-2-059-2501R-1 640830 TCX-1-4108-MR2 F-A VT-3 NA MOMENT RESTRAINT. SI-0538-11 CP2-SISSMR-02 F1.40 2 C -

R154A820RB SAFETY INJECTION 6-SI-2-101-2501R-1 640840 TCX-1-4203-MR3 F-A VT-3 NA MOMENT RESTRAINT. S1-0538-06 CP2-SISSMR-03 F1.40 2 - X - -

R154B823RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 97 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE ------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS t

NUMBER IDENTIFICATION ITEM NO METH 1 2 2 3 1 2 " CALIBRATION BLOCX**

SAFETY INJECTION 8-SI-2-090-2501R-1 640870 TCX-1-4202-MR6 F-A VT-3 NA MOMENT RESTRAINT. Sl-0538-03 CP2-SISSMR-06 F1.40 2 - X - - - -

R154B82ORB SAFETY INJECTION 3-ST-2-303-2501R-1 640900 TCX-1-4600-MR9 F-A VT-3 NA MOMENT RESTRAINT. Sl-0538-13 CP2-SISSMR-09 F1.40 2 - X R154A808RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 98 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS- _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI i

SUMMARY

EXAMINATION AREA CATGY NDE i OUTAGE G ----- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH i 2 1 2 3 1 2 **CALIBRATION BLOCK**

CHEMICAL & VOLUME CONTROL 4-CS-2-076-2501R-2 652900 TCX-2-2569-H5 F-A VT-3 NA STRUT CS-2-076-402-A42R F1.20 2 - X -

818AB 653300 TCX-2-2569-H1 F-A VT-3 NA SNUBBER CS-2-076-407-A42K F1.20 2 - - -X -

81 SAB CHEMICAL & VOLUME CONTROL 4-CS-2-085-2501R-2 653400 TCX-2-2570-Hl F-A VT-3 NA SPRING CS-2-085-402-A42S F1.20 2 C -

R194 818AB CHEMICAL & VOLUME CONTROL 4-CS-2-346-2501R-2 655400 TCX-2-2570-Hll F-A VT-3 NA STRUT CS-2-346-401-A42R F1.20 2 C -

R202 816AB CHEMICAL & VOLUME CONTROL 3-CS-2-628-2501R-2 655600 TCX-2-2569-H7 F-A VT-3 NA SNUBBER CS-2-628-402-A42K F1.20 2 - - - -X -

819AB CHEMICAL & VOLUME CONTROL 3-CS-2-629-2501R-2 655700 TCX-2-2570-H7 F-A VT-3 NA STRUT CS-2-629-700-A42R F1.20 2 C -

R202 81BAB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 99 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I

I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS

-1OUTAGE I 12 12 3 NUMBER IDENTIFICATION ITEM NO METH 1 2 I CALIBRATION BLOCK" CHEMICAL & VOLUME CONTROL 2-CS-2-086-2501R-2 655800 TCX-2-2570-H9 F-A VT-3 NA SNUBBER CS-2-AB-071-004-2 F1.20 2 C -

R202 818AB 655900 TCX-2-2570-H8 F-A VT-3 NA SPRING CS-2-AB-071-005-2 F1.20 2 C -

R202 818AB CONTAINMENT SPRAY 16-CT-2-002-151R-2 656500 TCX-2-2536-H1 F-A VT-3 NA SNUBBER CT-2-002-402-S22K F1.20 2 - - - -X 788SB 656550 TCX-2-2536-H1 C-C PT 92 WELDED ATTACHMENT CT-2-002-402-S22K C3.20 2 - - - X - -

788SB CONTAINMENT SPRAY 16-CT-2-003-151R-2 656800 TCX-2-2575-H1 F-A VT-3 NA BOX CT-2-003-401-S32A F1.20 2 - - - X -

802SB 656850 TCX-2-2575-Hl C-C PT 92 WELDED ATTACHMENT CT-2-003-401-S32A C3.20 2 - - - - X 802SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 100 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE----- - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S112 1 23 1 2 i **CALIBRATION BLOCK**

CONTAINMENT SPRAY 16-CT-2-003-151R-2 656900 TCX-2-2575-H5 F-A VT-3 NA STRUT CT-2-003-402-S32R F1.20 2 - - - - X - -

802SB 657000 TCX-2-2575-H7 F-A VT-3 NA STRUT CT-2-003-403-S32R F1.20 2 - - - X 802SB 657100 TCX-2-2575-H6 F-A VT-3 NA STRUT CT-2-003-404-S32R F1.20 2 - - - X -

802SB 657200 TCX-2-2575-H8 F-A VT-3 NA SPRING CT-2-003-405-$32S F1.20 2 - - - X - -

802SB 657300 TCX-2-2575-H9 F-A VT-3 NA STRUT CT-2-003-406-S32R F1.20 2 - - - X - -

800SB 657400 TCX-2-2575-HlO F-A VT-3 NA STRUT CT-2-003-407-S32R F1.20 2 - - - - X - -

793SB CONTAINMENT SPRAY 16-CT-2-004-151R-2 657500 TCX-2-2577-H5 F-A VT-3 NA STRUT CT-2-004-401-S32R F1.20 2 - - - X - -

792SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 101 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ------ ------I-- ---

SUMMARY

EXAMINATION AREA CATGY NDE 1 2-- -OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I11 1 23 1 2 I **CALIBRATION BLOCK**

CONTAINMENT SPRAY 12-CT-2-005-151R-2 657900 TCX-2-2576-H5 F-A VT-3 NA SNUBBER CT-2-005-404-S22K F1.20 2 - - - X - -

785SB 658300 TCX-2-2576-H1 F-A VT-3 NA SPRING CT-2-005-408-$22S F1.20 2 - - - - X - -

780SB 658350 TCX-2-2576-HI C-C PT 92 WELDED ATTACHMENT CT-2-005-408-$22S C3.20 2 - - - - X 780SB CONTAINMENT SPRAY 12-CT-2-006-151R-2 658800 TCX-2-2576-H2 F-A VT-3 NA SPRING CT-2-006-407-S22S P1.20 2 - -- X 779SB 658850 TCX-2-2576-H2 C-C PT 92 WELDED ATTACHMENT CT-2-006-407-$22S C3.20 2 - - - X - -

779SB CONTAINMENT SPRAY 12-CT-2-007-151R-2 659400 TCX-2-2578-H12 F-A VT-3 NA STRUT CT-2-007-406-S22R F1.20 2 - - - - X - -

781SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 102 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ -PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- -------- I

SUMMARY

EXAMINATION AREA CATGY NDE I1 2- -OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11i2 1 23 1 2 I CALIBRATION BLOCK**

CONTAINMENT SPRAY 12-CT-2-007-151R-2 659600 TCX-2-2578-H14 F-A VT-3 NA STRUT CT-2-007-408-S22R F1.20 2 - - - - X 781SB CONTAINMENT SPRAY 12-CT-2-008-151R-2 659700 TCX-2-2578-Hl F-A VT-3 NA SPRING CT-2-008-401-S22S F1.20 2 - - - X - -

779SB 659750 TCX-2-2578-H1 C-C PT 92 WELDED ATTACHMENT CT-2-008-401-$22S C3.20 2 - - - X - -

779SB CONTAINMENT SPRAY 16-CT-2-013-301R-2 662200 TCX-2-2571-Hl5 F-A VT-3 NA SNUBBER CT-2-013-408-S42K Fl.20 2 - - - X 818SB CONTAINMENT SPRAY 16-CT-2-025-301R-2 664640 TCX-2-2539-H2 F-A VT-3 NA HANGER CT-2-025-401-S22R F1.20 2 - - - - X - -

R62E 785SB 664670 TCX-2-2539-H5 F-A VT-3 NA HANGER CT-2-025-402-S22S F1.20 2 - - - X R62E 785SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 103 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SOUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-017-1303-2 666000 TCX-2-2301-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-446-C72R F1.20 2 - - X - - - - BOUNDARY R155N888RB 666050 TCX-2-2301-H3 C-C MT 92 WELDED ATTACHMENT FW-2-017-446-C72R C3.20 2 - - X -

R155NSSRB 666100 TCX-2-2301-N13 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-017-450-C72S F1.20 2 - - - - -X BOUNDARY 888RB 666200 TCX-2-2301-H12 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-451-C72R F1.20 2 - - X BOUNDARY 888RB 666300 TCX-2-2301-Hl1 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-453-C62R F1.20 2 - - X BOUNDARY 870RB 666400 TCX-2-2301-H5 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-017-454-C52K F1.20 2 - BOUNDARY R155N856RB 666450 TCX-2-2301-H5 C-C MT 92 WELDED ATTACHMENT FW-2-017-454-C52K C3.20 2 - - X -

R155N856RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 104 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE I1 2- - OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S11i2 1 3 1 2 I **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-017-1303-2 666500 TCX-2-2301-Hl0 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-456-CS2R F1.20 2 - - - - -X BOUNDARY 856RB 666600 TCX-2-2301-H24 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-017-700-C42K F1.20 2 - - - - -X BOUNDARY 827RB 666700 TCX-2-2301-H1 F-A VT-3 NA HANGER. TDLR VERIFICATION FW-2-017-701-C52R F1.20 2 - - X - - - - BOUNDARY R155NB49RB 666750 TCX-2-2301-Hl C-C MT 92 WELDED ATTACHMENT FW-2-017-701-C52R C3.20 2 - - X - - - -

R155N849RB 666800 TCX-2-2301-H14 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-702-C72R F1.20 2 - - - - -X BOUNDARY 888RB 666900 TCX-2-2301-H4 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-703-C62R F1.20 2 - X - - - - BOUNDARY R155N873RB 666950 TCX-2-2301-H4 C-C MT 92 WELDED ATTACHMENT FW-2-017-703-C62R C3.20 2 - X - - - -

R155N873RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 105 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ---- ---------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGEE--- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-017-1303-2 667000 TCX-2-2301-H15 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-704-C72R F1.20 2 - - - - - -X BOUNDARY 888RB 667100 TCX-2-2301-H20 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-017-705-C72R F1.20 2 - - - - - -X BOUNDARY 888RB FEEDWATER 18-FW-2-018-1303-2 667400 TCX-2-2202-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-434-C52R F1.20 2 - X - - BOUNDARY R155L856RB 667500 TCX-2-2201-H4 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-441-C72R F1.20 2 - BOUNDARY R155N888RB 667550 TCX-2-2201-H4 C-C 92 WELDED ATTACHMENT FW-2-018-441-C72R C3.20 2 - X - - - -

R155N888RB 667600 TCX-2-2201-H9 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-443-C72R F1.20 2 - - X - - - - BOUNDARY R155N808RB 667800 TCX-2-2201-HlO F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-445-C72R F1.20 2 - - BOUNDARY R155N888RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 106 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS - -PRESERVICE YEAR I FIRST SECOND THIRD ASME J PERIOD PERIOD PERIOD SEC. XI OUTAGE -

SUMMARY

EXAMINATION AREA CATGY NDE - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 12 1 2 3 1 2 I **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-018-1303-2 667900 TCX-2-2201-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-446-C72R F1.20 2 - X - - BOUNDARY RI55N888RB 667950 TCX-2-2201-H3 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-018-446-C72R C3.20 2 - - VERIFICATION BOUNDARY.

R155N888RB 668000 TCX-2-2201-Hll F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-447-C72R Fl.20 2 - - X - - BOUNDARY R155N888RB 668100 TCX-2-2201-H2 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-018-448-C72K F1.20 2 - X - BOUNDARY R155N888RB 668150 TCX-2-2201-H2 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-0187448-C72K C3.20 2 - X VERIFICATION BOUNDARY.

R155N888RB 668200 TCX-2-2201-HI2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-449-C72R F1.20 2 - X BOUNDARY R155N888RB 668400 TCX-2-2201-HI4 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-452-C52R F1.20 2 - - X BOUNDARY R154J859RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 107 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ---- ---------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 12 3 1 2 I CALIBRATION BLOCK**

FEEDWATER 18-FW-2-018-1303-2 668500 TCX-2-2201-H15 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-453-C52R F1.20 2 - - x - - - - BOUNDARY R154J856RB 668600 TCX-2-2201-H17 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-456-C52R F1.20 2 - - X - - BOUNDARY R154J834RB 668700 TCX-2-2201-H19 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-018-457-C42S F1.20 2 - - X - BOUNDARY R154J827RB 668800 TCX-2-2201-H1 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-018-458-C42K F1.20 2 - X - - - - BOUNDARY R154J828RB 668850 TCX-2-2201-H1 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-018-458-C42K C3.20 2 - X - - - - VERIFICATION BOUNDARY.

R154J828RB 668900 TCX-2-2201-H16 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-700-C52R F1.20 2 - X - - - - BOUNDARY R154J855RB 669000 TCX-2-2201-H7 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-703-C72R F1.20 2 - X BOUNDARY R155N882RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE:- 108 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL --- _____-PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ------ ------ -----

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE --- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-018-1303-2 669100 TCX-2-2201-HS F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-018-704-C62R F1.20 2 - BOUNDARY R15SN866RB 669150 TCX-2-2201-HS C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-018-704-C62R C3.20 2 - X - - - - VERIFICATION BOUNDARY.

R155N866RB FEEDWATER 18-FW-2-019-1303-2 669200 TCX-2-2101-H12 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-019-401-C42S F1.20 2 C - BOUNDARY R100A827RB 669300 TCX-2-2101-H8 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-019-402-C52S F1.20 2 C - BOUNDARY R1541856RB 669400 TCX-2-2101-HI F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-019-404-C42K F1.20 2 C - BOUNDARY R1541827RB 669450 TCX-2-2101-Hl C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-019-404-C42K C3.20 2 C - VERIFICATION BOUNDARY.

R1541827RB 669500 TCX-2-2101-H7 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-019-405-C52K F1.20 2 C - BOUNDARY R1541856RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 109 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGEE--- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-019-1303-2 669600 TCX-2-2101-H2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-019-406-C52R F1.20 2 C - BOUNDARY R100AB5ORB 669650 TCX-2-2101-H2 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-019-406-C52R C3.20 2 C - VERIFICATION BOUNDARY.

R1541850RB 669700 TCX-2-2101-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-019-408-S62R F1.20 2 C - BOUNDARY RI00A856SB 669800 TCX-2-2101-H1O F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-019-411-C42K F1.20 2 C - BOUNDARY R1541827RB 669900 TCX-2-2101-H11 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-019-412-C42K Fl.20 2 C - BOUNDARY R1541828RB FEEDWATER 18-FW-2-020-1303-2 670000 TCX-2-2401-H1 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-020-403-C42K F1.20 2 - - X - BOUNDARY 827RB 670010 TCX-2-2401-H7 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-020-402-C52S F1.20 2 - - X - BOUNDARY 827RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 110 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI Il - -- - - ----------- -------- 1

SUMMARY

EXAMINATION AREA CATGY NDE I------- OUTAGE E--- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

FEEDWATER 18-FW-2-020-1303-2 670050 TCX-2-2401-H1 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-020-403-C42K C3.20 2 - X - VERIFICATION BOUNDARY.

827RB 670100 TCX-2-2401-Hll F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-020-410-C42S F1.20 2 - - X - BOUNDARY 827RB 670110 TCX-2-2401-H8 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-020-407-C52K F1.20 2 - X - BOUNDARY 827RB 670200 TCX-2-2401-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-020-413-S62R F1.20 2 - X - BOUNDARY 856RB 670300 TCX-2-2401-H2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-020-700-C52R F1.20 2 - -- -X - BOUNDARY 842RB 670350 TCX-2-2401-H2 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-020-700-C52R C3.20 2 - X - VERIFICATION BOUNDARY.

842RB 670400 TCX-2-2401-H1O F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-020-701-C42K F1.20 2 - - X - BOUNDARY 830RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: ill INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS - -PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI - ---

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE ------ -I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 I **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-095-1303-2 671900 TCX-2-2103-H7 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-095-401-C62R F1.20 2 C - BOUNDARY R155L64RB 672000 TCX-2-2103-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-095-401-S62R F1.20 2 C - BOUNDARY R100B870SB 672100 TCX-2-2102-HB F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-095-402-C62R F1.20 2 - - - -x - BOUNDARY 867RB 672400 TCX-2-2103-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-095-404-S62R F1.20 2 C - BOUNDARY RI0OBS63SB 672500 TCX-2-2102-H13 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-095-405-C62S F1.20 2 - - - X BOUNDARY 871RB 672600 TCX-2-2102-H15 F-A VT-3 NA STANCHION. TDLR VERIFICATION FW-2-095-408-C62S F1.20 2 - - - x - - BOUNDARY 871RB 672700 TCX-2-2102-H17 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-095-410-C62R F1.20 2 - - - X BOUNDARY 866RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 112 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ---- ---------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE I1 2- -OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S11 1 23 1 2 I **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-095-1303-2 672800 TCX-2-2102-H20 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-411-C62K F1.20 2 - - - X BOUNDARY 862RB 672900 TCX-2-2102-H19 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-412-C62K F1.20 2 - - - - X - - BOUNDARY 863RB 673000 TCX-2-2102-H1 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-095-413-C62S F1.20 2 - - -- X BOUNDARY 869RB 673050 TCX-2-2102-H1 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-095-413-C62S C3.20 2 - - - - X VERIFICATION BOUNDARY.

869RB 673100 TCX-2-2102-H16 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-414-C62K F1.20 2 - - - X - - BOUNDARY 867RB 673200 TCX-2-2102-H18 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-415-C62K F1.20 2 - - - X BOUNDARY 865RB 673300 TCX-2-2102-H14 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-702-C62K F1.20 2 - - - X - - BOUNDARY 871RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 113 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-095-1303-2 673400 TCX-2-2102-Hl1 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-095-703-C62R F1.20 2 - - - X BOUNDARY 869RB 673500 TCX-2-2102-H10 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-704-C62K F1.20 2 - - - X - - BOUNDARY 867RB 673600 TCX-2-2103-H8 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-095-705-C62K F1.20 2 - - - - X - - BOUNDARY RI55L865RB FEEDWATER 6-FW-2-096-1303-2 673700 TCX-2-2203-H25 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-402-C62K F1.20 2 - - - -x - BOUNDARY 866RB 673800 TCX-2-2203-H23 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-403-C62K F1.20 2 - - -X - BOUNDARY 866RB 673900 TCX-2-2203-H21 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-096-407-C62S F1.20 2 - X - BOUNDARY 868RB 674000 TCX-2-2203-H18 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-409-C62K F1.20 2 - - -X - BOUNDARY 869RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 114 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I ---- ---------------------- I

SUMMARY

EXAMINATION AREA .CATGY NDE I1 2- - OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH S12 1 23 1 2 I **CALIBRATION BLOCK*

FEEDWATER 6-FW-2-096-1303-2 674100 TCX-2-2203-H19 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-410-C62R F1.20 2 - - - - X - BOUNDARY 869RB 674200 TCX-2-2203-H14 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-416-C62R F1.20 2 - - -- -X - BOUNDARY 880RB 674350 TCX-2-2203-H4 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-096-422-C62R C3.20 2 - X - VERIFICATION BOUNDARY.

880RB 674400 TCX-2-2203-H12 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-423-C62R F1.20 2 - - -X - BOUNDARY 880RB 674500 TCX-2-2203-Hll F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-424-C62R F1.20 2 - - - -X - BOUNDARY 88ORB 674650 TCX-2-2203-H3 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-096-428-C62R C3.20 2 - - - -X - VERIFICATION BOUNDARY.

874RB 674700 TCX-2-2203-H2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-432-C62R F1.20 2 - X - BOUNDARY 867RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 115 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-096-1303-2 674750 TCX-2-2203-H2 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-096-432-C62R C3.20 2 - - - X - VERIFICATION BOUNDARY.

867RB 674800 TCX-2-2203-H8 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-433-C62R F1.20 2 - - X - BOUNDARY 868RB 674900 TCX-2-2203-H9 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-434-C62R F1.20 2 - X - BOUNDARY 868RB 675000 TCX-2-2203-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-435-C62R F1.20 2 - X - BOUNDARY 867RB 675100 TCX-2-2203-H7 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-436-C62R F1.20 2 - -- -X - BOUNDARY 867RB 675200 TCX-2-2204-Hll F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-439-C62R F1.20 2 - - - - X - BOUNDARY 864RB 675300 TCX-2-2204-H8 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-442-S62R F1.20 2 - X - BOUNDARY R100C863SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 116 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ------ ------ -----

SUMMARY

EXAMINATION AREA CATGY NDE i ----- -OUTAGE E--- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 *~CALIBRATION BLOCK**

FEEDWATER 6-FW-2-096-1303-2 675600 TCX-2-2204-H1 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-702-C62K F1.20 2 - X BOUNDARY R155L864RB 675650 TCX-2-2204-Hl C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-096-702-C62K C3.20 2 - X VERIFICATION BOUNDARY.

R155L864RB 675700 TCX-2-2203-HI F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-705-C62K F1.20 2 - - X - BOUNDARY 867RB 675750 TCX-2-2203-Hl C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-096-705-C62K C3.20 2 - X - VERIFICATION BOUNDARY.

A67RB 675800 TCX-2-2203-H24 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-096-707-C62S F1.20 2 - X - BOUNDARY 865RB 675900 TCX-2-2203-H22 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-708-C62K F1.20 2 - -- - X - BOUNDARY 868RB 676000 TCX-2-2203-H15 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-709-C62R F1.20 2 - - X - BOUNDARY 88ORB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 117 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -- -- - - ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I------- OUTAGE------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-096-1303-2 676100 TCX-2-2203-H5 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-710-C62K F1.20 2 - X - BOUNDARY 88ORB 676150 TCX-2-2203-HS C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-096-710-C62K C3.20 2 - - - -X - VERIFICATION BOUNDARY.

880RB 676300 TCX-2-2203-H17 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-096-712-C62R F1.20 2 - - X - BOUNDARY 869RB 676400 TCX-2-2203-H20 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-713-C62K F1.20 2 - X - BOUNDARY 869RB 676500 TCX-2-2204-H12 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-096-716-C62K F1.20 2 - X - BOUNDARY 864RB FEEDWATER 6-FW-2-097-1303-2 676600 TCX-2-2303-H9 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-401-S62R F1.20 2 - - X - BOUNDARY 863SB 676900 TCX-2-2302-H4 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-405-C62R F1.20 2 - - X - BOUNDARY 867RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 118 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI O---------OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-097-1303-2 677000 TCX-2-2302-H6 F-A VT-23 NA STRUT. TDLR VERIFICATION FW-2-097-408-C62R F1.20 2 - - - X - - - BOUNDARY 677050 TCX-2-2302-H7 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-412-C62R F1.20 2 - - X - BOUNDARY 677100 TCX-2-2302-H8 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-413-C62R F1.20 2 - - X - BOUNDARY 877RB 677200 TCX-2-2302-H9 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-416-C62R F1.20 2 - - - X - BOUNDARY 88ORB 677300 TCX-2-2302-HlO F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-417-C62R F1.20 2 - - - X - - BOUNDARY 880RB 677400 TCX-2-2302-HI2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-424-C62R F1.20 2 - - X - BOUNDARY 88ORB 677500 TCX-2-2302-H13 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-425-C62R F1.20 2 - - X - - BOUNDARY 880RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 119 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 i CALIBRATION BLOCK**

FEEDWATER 6-FW-2-097-1303-2 677600 TCX-2-2302-H16 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-428-C62R F1.20 2 - - X - - - BOUNDARY 876RB 677700 TCX-2-2302-HI9 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-430-C62R F1.20 2 - - X - BOUNDARY 868RB 677800 TCX-2-2302-H18 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-431-C62R F1.20 2 - - X - BOUNDARY 868RB 677900 TCX-2-2302-H20 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-433-C62R F1.20 2 - - X - - - BOUNDARY 868RB 678000 TCX-2-2302-H15 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-434-C62R Fl.20 2 - - - X - BOUNDARY 868RB 678100 TCX-2-2302-H21 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-097-435-C62S F1.20 2 - - - X - BOUNDARY 868RB 678200 TCX-2-2302-H22 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-097-436-C62K F1.20 2 - X - BOUNDARY 868RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 120 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL -_ PLAN STATUS PRESERVICE YEAR I F.IRST SECOND THIRD ASME I PJERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-097-1303-2 678300 TCX-2-2302-H24 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-097-439-C62K F1.20 2 - - -X - BOUNDARY 866RB 678400 TCX-2-2302-H27 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-097-441-C62K F1.20 2 - - - X - BOUNDARY 867RB 678500 TCX-2-2303-H13 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-097-448-C62K F1.20 2 - - - X - BOUNDARY 865RB 678600 TCX-2-2303-H14 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-449-C62R F1.20 2 - - X - BOUNDARY 865RB 678620 TCX-2-2302-H23 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-097-451-C62K F1.20 2 - X - BOUNDARY 865RB 678700 TCX-2-2302-H5 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-702-C62R F1.20 2 - - X - - BOUNDARY 866RB 678800 TCX-2-2302-Hl F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-703-C62R F1.20 2 - - X - BOUNDARY 866RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 121 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 12 i **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-097-1303-2 678840 TCX-2-2302-H2 C-C MT 92 BOX. TDLR VERIFICATION FW-2-097-418-C62R C3.20 2 - - X - - - BOUNDARY.

88ORB 678845 TCX-2-2302-H2 F-A VT-3 NA WELDED ATTACHMENT. TDLR FW-2-097-418-C62R F1.20 2 - - - X - VERIFICATION BOUNDARY.

88ORB 678850 TCX-2-2302-H1 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-097-703-C62R C3.20 2 - - - X - VERIFICATION BOUNDARY.

866RB 678900 TCX-2-2302-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-704-C62R Fl. 20 2 - - X - BOUNDARY A86RB 679000 TCX-2-2302-H17 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-097-706-C62R F1.20 2 - - X - - BOUNDARY 868RB 679100 TCX-2-2302-H25 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-097-707-C62S F1.20 2 - -- -X - BOUNDARY 865RB 679200 TCX-2-2302-H26 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-097-708-C62K F1.20 2 - - - -X - BOUNDARY 867RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 122 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -- -- - - ----------- ----------- I

SUMMARY

EXAMINATION AREA CATOY NDE I- ------ OUTAGEE--- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-098-1303-2 679300 TCX-2-2403-HB F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-098-401-C62R F1.20 2 - - -X - BOUNDARY 864RB 679400 TCX-2-2402-N5 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-098-402-C62R F1.20 2 - - - -X - BOUNDARY 866RB 679500 TCX-2-2402-H9 F-A VT-3 NA SPRING. TDLR VERIFICATION FW-2-098-408-C62S F1.20 2 - X - BOUNDARY 871RB 679600 TCX-2-2402-Hll F-A VT-3 NA HANGER. TDLR VERIFICATION FW-2-098-411-C62S F1.20 2 - X - BOUNDARY 871RB 679700 TCX-2-2402-HI3 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-098-412-C62K F1.20 2 - - -X - BOUNDARY 864RB 679900 TCX-2-2402-H14 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-098-416-C62K F1.20 2 - - -X - BOUNDARY 862RB 680000 TCX-2-2402-H4 F-A VT-3 NA HANGER. TDLR VERIFICATION FW-2-098-417-C62S F1.20 2 - - - -X - BOUNDARY 872RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 123 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ __--- PLAN STATUS- PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE II INSTRUCTIONS

-21OUTAGE2---

NUMBER IDENTIFICATION ITEM NO METH 12 1 23 1 2 i CALIBRATION BLOCK**

FEEDWATER 6-FW-2-098-1303-2 680050 TCX-2-2402-H4 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-098-417-C62S C3.20 2 - - -X - VERIFICATION BOUNDARY.

872RB 680600 TCX-2-2402-HlO F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-098-423-C62R F1.20 2 - X - BOUNDARY 871RB 680700 TCX-2-2402-H8 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-098-424-C62R F1.20 2 - - X - BOUNDARY 871RB 680800 TCX-2-2402-H3 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-098-704-C62K F1.20 2 - X - BOUNDARY 680850 TCX-2-2402-H3 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-098-704-C62K C3.20 2 - X - VERIFICATION BOUNDARY.

872PB 680900 TCX-2-2402-H7 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-098-706-C62R F1.20 2 - - -X - BOUNDARY 868RB 681000 TCX-2-2402-H2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-098-708-C62R F1.20 2 - - X - BOUNDARY 871RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 124 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 **CALIBRATION BLOCK**

681050 TCX-2-2402-H2 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-098-708-C62R C3.20 2 - -- -X - VERIFICATION BOUNDARY.

871RB FEEDWATER 6-FW-2-099-1303-2 681100 TCX-2-2102-H7 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-099-402-C62K F1.20 2 - - - - X BOUNDARY 868RB 681200 TCX-2-2102-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-099-405-C62R F1.20 2 - - - - X BOUNDARY 869RB 681300 TCX-2-2102-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-099-408-C62R F1.20 2 - - - X BOUNDARY 86ORB 681400 TCX-2-2102-H4 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-099-700-C62K F1.20 2 - - - KX BOUNDARY 86ORB 681500 TCX-2-2102-H5 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-099-702-C62R F1.20 2 - - - X BOUNDARY 867RB 681600 TCX-2-2102-H2 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-099-703-C62K F1.20 2 - - - K X BOUNDARY 860RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 125 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS- _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI II

SUMMARY

EXAMINATION AREA CATGY NDE E--- - - --- -OUTAGE INSTRUCTIONS I

NUMBER IDENTIFICATION ITEM NO METH 12 1 2 3 1 2 "CALIBRATION BLOCK**

FEEDWATER 6-FW-2-100-1303-2 681700 TCX-2-2204-H13 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-100-401-C62R F1.20 2 - X BOUNDARY 863RB 681850 TCX-2-2204-H4 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-100-403-C62R C3.20 2 - VERIFICATION BOUNDARY.

R155L863RD 681900 TCX-2-2204-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-100-406-C52R F1.20 2 - - BOUNDARY RI55L857RB 681950 TCX-2-2204-H3 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-100-406-C52R C3.20 2 - - X - VERIFICATION BOUNDARY.

RI55L857RD 682050 TCX-2-2204-H2 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-100-701-C52R C3.20 2 - VERIFICATION BOUNDARY.

R155L855RB FEEDWATER 6-FW-2-101-1303-2 682100 TCX-2-2303-H6 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-101-401-C62R F1.20 2 - - X BOUNDARY 863RB 682200 TCX-2-2303-H3 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-101-403-C62R F1.20 2 - - X - BOUNDARY 863RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 126 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -- - - - - ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE- - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I CALIBRATION BLOCK**

FEEDWATER 6-FW-2-101-1303-2 682250 TCX-2-2303-H3 C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-101-403-C62R C3.20 2 - - X - VERIFICATION BOUNDARY.

863RB 682300 TCX-2-2303-H2 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-101-404-C52R F1.20 2 - - - X - - - BOUNDARY 856RB 682350 TCX-2-2303-H2 C-C 92 WELDED ATTACHMENT. TDLR FW-2-101-404-C52R C3.20 2 - - X - - - VERIFICATION BOUNDARY.

85RB 682400 TCX-2-2303-H5 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-101-405-C52R F1.20 2 - - X - BOUNDARY 857RB 682500 TCX-2-2303-H4 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-101-406-C52R Fl.20 2 - X - BOUNDARY 855RB 682650 TCX-2-2303-H1 C-C 92 WELDED ATTACHMENT. TDLR FW-2-101-700-C52R C3.20 2- -

- X - - - VERIFICATION BOUNDARY.

855RB FEEDWATER 6-FW-2-102-1303-2 682700 TCX-2-2402-H15 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-102-403-C62R F1.20 2 - - X - BOUNDARY 868RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 127 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE I ------- OUTAGE------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 12 1 2 3 1 2 I **CALIBRATION BLOCK**

FEEDWATER 6-FW-2-102-1303-2 682800 TCX-2-2402-Hl8 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-102-404-C62R F1.20 2 - - - X - BOUNDARY 868RB 682900 TCX-2-2402-Hl F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-102-700-C62R F1.20 2 - - X - BOUNDARY 863RB 682950 TCX-2-2402-Hl C-C MT 92 WELDED ATTACHMENT. TDLR FW-2-102-700-C62R C3.20 2 - - X - VERIFICATION BOUNDARY.

863RB 683000 TCX-2-2402-H16 F-A VT-3 NA SNUBBER. TDLR VERIFICATION FW-2-102-702-C62K F1.20 2 - X - BOUNDARY 868RB 683100 TCX-2-2402-H17 F-A VT-3 NA STRUT. TDLR VERIFICATION FW-2-102-703-C62R F1.20 2 - -- -X - BOUNDARY 868RB MAIN STEAM 32-MS-2-001-1303-2 683200 TCX-2-2100-H6 F-A VT-3 NA SPRING. TDLR VERIFICATION MS-2-001-402-C72S F1.20 2 C - BOUNDARY R1550890RB 683400 TCX-2-2100-Hl F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-001-405-C72K F1.20 2 C - BOUNDARY R1550890RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 128 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 I **CALIBRATION BLOCK*

MAIN STEAM 32-MS-2-001-1303-2 683450 TCX-2-2100-H1 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-001-405-C72K C3.20 2 C - VERIFICATION BOUNDARY.

R1550890RB MAIN STEAM 32-MS-2-002-1303-2 684400 TCX-2-2200-H2 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-002-408-C72K F1.20 2 - - X BOUNDARY R155N90ORB 684450 TCX-2-2200-H2 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-002-408-C72K C3.20 2 - - X - - - - VERIFICATION BOUNDARY.

R155N900RB 684500 TCX-2-2200-H1 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-002-411-C72K F1.20 2 - - X - BOUNDARY R155N900RB 684550 TCX-2-2200-Hl C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-002-411-C72K C3.20 2 - X - VERIFICATION BOUNDARY.

R155N90ORB MAIN STEAM 32-MS-2-003-1303-2 685100 TCX-2-2300-H7 F-A VT-3 NA U-BOLT. TDLR VERIFICATION MS-2-003-402-C72S F1.20 2 - - - X - - BOUNDARY 894RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 129 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I **CALIBRATION BLOCK**

MAIN STEAM 32-MS-2-003-1303-2 685200 TCX-2-2300-Hl F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-003-405-C72K F1.20 2 - - - - X - - BOUNDARY 894RB 685250 TCX-2-2300-Hl C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-003-405-C72K C3.20 2 - - - - X - - VERIFICATION BOUNDARY.

894RB 685400 TCX-2-2300-H2 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-003-407-C72K F1.20 2 - - - - X BOUNDARY 896RB 685450 TCX-2-2300-H2 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-003-407-C72K C3.20 2 - - - x - VERIFICATION BOUNDARY.

896RB 685500 TCX-2-2300-H3 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-003-409-C72K F1.20 2 - - - X BOUNDARY 894RB 685550 TCX-2-2300-H3 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-003-409-C72K C3.20 2 - - - X VERIFICATION BOUNDARY.

894RB 685600 TCX-2-2300-H4 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-003-410-C72K F1.20 2 - - - X - - BOUNDARY 894RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 130 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SOUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 12 1 2 3 1 2 **CALIBRATION BLOCK**

MAIN STEAM 32-MS-2-003-1303-2 685650 TCX-2-2300-H4 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-003-410-C72K C3.20 2 - - - X - - VERIFICATION BOUNDARY.

894RB MAIN STEAM 32-MS-2-004-1303-2 686200 TCX-2-2400-H9 F-A VT-3 NA SPRING. TDLR VERIFICATION MS-2-004-403-C72S F1.20 2 - - - - - -X BOUNDARY 877RB 686600 TCX-2-2400-HI F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-004-407-C72K F1.20 2 - - X BOUNDARY 890RB 686650 TCX-2-2400-H1 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-004-407-C72K C3 .20 2 - - - - -X VERIFICATION BOUNDARY.

890RB 686800 TCX-2-2400-H2 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-004-409-C72K F1.20 2 - - X BOUNDARY 884RB 686850 TCX-2-2400-H2 C-C MT 92 WELDED ATTACHMENT. TDLR MS-2-004-409-C72K C3.20 2 - - X VERIFICATION BOUNDARY.

884RB 686900 TCX-2-2400-Hl1 F-A VT-3 NA STRUT. TDLR VERIFICATION MS-2-004-415-S72R F1.20 2 - - - - - X BOUNDARY 877SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 131 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME J PERIOD PERIOD PERIOD SEC. XI -I I------- -OUTAGE---

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 I **CALIBRATION BLOCK**

MAIN STEAM 8-MS-2-240-1303-2 687300 TCX-2-2200-H12 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-240-401-S72K F1.20 2 - X - - - - BOUNDARY R109C885SB 687400 TCX-2-2200-H13 F-A VT-3 NA SNUBBER. TDLR VERIFICATION MS-2-240-402-S72K F1.20 2 - X BOUNDARY R109C885SB RESIDUAL HEAT REMOVAL 12-RH-2-004-601R-2 688400 TCX-2-2501-Hl F-A VT-3 NA STRUT RH-2-004-403-S42R F1.20 2 - - X 813SB 688450 TCX-2-2501-H1 C-C PT 92 WELDED ATTACHMENT RH-2-004-403-S42R C3.20 2 - - - - - -

813SB 688700 TCX-2-2501-H12 F-A VT-3 NA SPRING RH-2-004-407-S32S F1.20 2 - - - - -

803SB 688900 TCX-2-2501-H14 F-A VT-3 NA STRUT RH-2-004-409-S32R F1.20 2 - - X 800SB RESIDUAL HEAT REMOVAL 16-RH-2-007-601R-2 689000 TCX-2-2500-H1 F-A VT-3 NA SNUBBER RH-2-007-405-S22K F1.20 2 - - - - -

775SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 132 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI ------

I- ---- -----

SUMMARY

EXAMINATION AREA CATGY NDE II -21OUTAGE----

INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 12 1 23 1 2 l **CALIBRATION BLOCK**

RESIDUAL HEAT REMOVAL 16-RH-2-007-601R-2 689050 TCX-2-2500-Hl C-C PT 92 WELDED ATTACHMENT RH-2-007-405-S22K C3.20 2 - - - - -X 775SB RESIDUAL HEAT REMOVAL 16-RH-2-008-601R-2 689400 TCX-2-2501-H15 F-A VT-3 NA STRUT RH-2-008-402-S22R F1.20 2 - - - X 787SB 689600 TCX-2-2501-H2 F-A VT-3 NA SNUBBER RH-2-008-405-S22K F1.20 2 - - X 784SB 689650 TCX-2-2501-H2 C-C PT 92 WELDED ATTACHMENT RH-2-008-405-S22K C3.20 2 - - X 784SB 689800 TCX-2-2501-H19 F-A VT-3 NA SPRING RH-2-008-407-S22S F1.20 2 - - X 774SB RESIDUAL HEAT REMOVAL 8-RH-2-028-151R-2 693500 TCX-2-2579-H1 F-A VT-3 NA BOX RH-2-028-402-S32A F1.20 2 - X R070 806SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 133 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 **CALIBRATION BLOCK**

RESIDUAL HEAT REMOVAL 8-RH-2-028-151R-2 693550 TCX-2-2579-Hl C-C PT 92 WELDED ATTACHMENT RH-2-028-402-S32A C3.20 2 - X R070 806SB 693600 TCX-2-2579-H5 F-A VT-3 NA SNUBBER RH-2-028-404-S32K F1.20 2 - X R076 806SB SAFETY INJECTION 4-SI-2-001-2501R-2 696300 TCX-2-2564-H13 F-A VT-3 NA SNUBBER SI-2-001-424-S42K F1.20 2 C -

R77N 827SB SAFETY INJECTION 4-SI-2-021-2501R-2 697000 TCX-2-2564-H17 F-A VT-3 NA SPRING SI-2-021-404-S42S F1.20 2 C -

R77N 812SB SAFETY INJECTION 24-SI-2-029-151R-2 697100 TCX-2-2580-HI9 F-A VT-3 NA STRUT SI-2-029-406-Y32R F1.20 2 - X R085D802YD 697400 TCX-2-2580-H3 F-A VT-3 NA STRUT SI-2-029-409-$32R F1.20 2 - X R085D802SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PACE: 134 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- -------- I

SUMMARY

EXAMINATION AREA CATGY NDE I OUTAGEE--- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

SAFETY INJECTION 24-SI-2-029-151R-2 697450 TCX-2-2580-H3 C-C PT 92 WELDED ATTACHMENT SI-2-029-409-$32R C3.20 2 - X R085D802SB 697700 TCX-2-2580-H1 F-A VT-3 NA BOX SI-2-029-415-Y32R F1.20 2 - X R085D802YD 697750 TCX-2-2580-Hl C-C PT 92 WELDED ATTACHMENT SI-2-029-415-Y32R C3.20 2 - X R085D802YD 697800 TCX-2-2580-H2 F-A VT-3 NA SNUBBER SI-2-029-424-Y32K F1.20 2 - X R085DB02YD 697850 TCX-2-2580-H2 C-C PT 92 WELDED ATTACHMENT SI-2-029-424-Y32K C3.20 2 - X R085D802YD SAFETY INJECTION 18-SI-2-030-151R-2 698400 TCX-2-2579-H7 F-A VT-3 NA STRUT SI-2-030-401-$32R F1.20 2 - X R070 802SB 698500 TCX-2-2579-H3 F-A VT-3 NA BOX SI-2-030-402-S32A F1.20 2 - X R070 802SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 135 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS _PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ------------ --------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE ---------

- O U T A G E - -------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

SAFETY INJECTION 18-SI-2-030-151R-2 698550 TCX-2-2579-H3 C-C PT 92 WELDED ATTACHMENT SI-2-030-402-S32A C3.20 2 - X R070 802SB SAFETY INJECTION 12-SI-2-031-151R-2 698950 TCX-2-2582-H1 C-C PT 92 WELDED ATTACHMENT SI-2-031-425-Y32R C3.20 2 - -- - X -

802YD 699000 TCX-2-2582-H2 F-A VT-3 NA SNUBBER SI-2-031-429-S32K F1.20 2 - - -X -

803SB 699050 TCX-2-2582-H2 C-C PT 92 WELDED ATTACHMENT SI-2-031-429-S32K C3.20 2 - - x -

803SB 699100 TCX-2-2582-H3 F-A VT-3 NA BOX SI-2-031-430-S32A F1.20 2 - -- -X -

803SB 699150 TCX-2-2582-H3 C-C PT 92 WELDED ATTACHMENT SI-2-031-430-S32A C3.20 2 - X -

803SB 699200 TCX-2-2582-H24 F-A VT-3 NA STRUT SI-2-031-431-$32R F1.20 2 - - -X -

802AB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 136 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS- PRESERVICE YEAR I FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE - U T A G E-------

0O--------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

SAFETY INJECTION 12-SI-2-031-151R-2 699400 TCX-2-2583-H1 F-A VT-3 NA SNUBBER SI-2-031-439-A32K F1.20 2 - - -X -

803AB 699450 TCX-2-2583-Hl C-C PT 92 WELDED ATTACHMENT SI-2-031-439-A32K C3.20 2 - -- - X -

803AB SAFETY INJECTION 8-SI-2-032-151R-2 699600 TCX-2-2579-H2 F-A VT-3 NA STRUT SI-2-032-402-$32R Fl.20 2 - X R070 794SB 699650 TCX-2-2579-H2 C-C PT 92 WELDED ATTACHMENT SI-2-032-402-$32R C3 .20 2 - X R070 794SB SAFETY INJECTION 4-SI-2-044-1501R-2 702500 TCX-2-2562-H4 F-A VT-3 NA SPRING SI-2-044-402-S22S F1.20 2 - X - - - -

R062 785SB 703800 TCX-2-2561-H2 F-A VT-3 NA STRUT SI-2-044-426-$42R F1.20 2 - X - - - -

R077B820SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 137 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE - ---------- O U T A G E INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH i 2 1 2 3 1 2 **CALIBRATION BLOCK**

SAFETY INJECTION 4-SI-2-044-1501R-2 703850 TCX-2-2561-H2 C-C PT 92 WELDED ATTACHMENT SI-2-044-426-$42R C3.20 2 - X - - - -

R077B820SB 704450 TCX-2-2562-H1 C-C PT 92 WELDED ATTACHMENT SI-2-044-700-S22R C3.20 2 - X -

R062E788SB SAFETY INJECTION 3-SI-2-050-1501R-2 706900 TCX-2-2565-H1 F-A VT-3 NA STRUT SI-2-050-402-$22R F1.20 2 C -

R67 788SB SAFETY INJECTION 4-SI-2-051-2501R-2 707500 TCX-2-2560-H3 F-A VT-3 NA STRUT SI-2-051-408-C42R F1.20 2 - -

R154B820RB 707550 TCX-2-2560-H3 C-C PT 92 WELDED ATTACHMENT SI-2-051-408-C42R C3.20 2 - - X -

R154B82ORB 707900 TCX-2-2560-H2 F-A VT-3 NA STRUT SI-2-051-414-C42R F1.20 2 -

R154B820RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 138 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE - U T A G E-------

0 O--------- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

SAFETY INJECTION 4-SI-2-051-2501R-2 707950 TCX-2-2560-H2 C-C PT 92 WELDED ATTACHMENT SI-2-051-414-C42R C3.20 2 - X R154B82ORB 708000 TCX-2-2560-H1 F-A VT-3 NA SNUBBER SI-2-051-415-C42K F1.20 2 - X - - - -

R154B820RB 708050 TCX-2-2560-Hl C-C PT 92 WELDED ATTACHMENT SI-2-051-415-C42K C3.20 2 - - X -

R154B82ORB 708500 TCX-2-2560-H4 F-A VT-3 NA STRUT SI-2-051-421-C42R F1.20 2 - - X -

R154B82ORB 708550 TCX-2-2560-H4 C-C PT 92 WELDED ATTACHMENT SI-2-051-421-C42R C3.20 2 - X - - - -

R154B82ORB SAFETY INJECTION 14-SI-2-071-601R-2 710100 TCX-2-2581-Hll F-A VT-3 NA STRUT SI-2-071-402-$32R F1.20 2 - - - - -X 792SB 710200 TCX-2-2581-H12 F-A VT-3 NA SPRING SI-2-071-403-532S F1.20 2 - X 792SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 139 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS - -PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ------------ I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 12 I **CALIBRATION BLOCK**

SAFETY INJECTION 14-SI-2-071-601R-2 710300 TCX-2-2581-H13 F-A VT-3 NA SNUBBER SI-2-071-404-S32K F1.20 2 - - - - -X 791SB 710400 TCX-2-2581-H2 F-A VT-3 NA SNUBBER SI-2-071-405-S32K F1.20 2 - - - - -

791SB 710450 TCX-2-2581-H2 C-C PT 92 WELDED ATTACHMENT SI-2-071-405-S32K C3.20 2 - - - - - -

791SB SAFETY INJECTION 14-SI-2-072-601R-2 710500 TCX-2-2581-H1 F-A VT-3 NA BOX SI-2-072-401-S32R F1.20 2 - - - - -

792SB 710550 TCX-2-2581-H1 C-C PT 92 WELDED ATTACHMENT SI-2-072-401-$32R C3.20 2 - - - - -

792SB SAFETY INJECTION 16-SI-2-075-601R-2 710860 TCX-2-2501-H4 F-A VT-3 NA SNUBBER SI-2-075-401-S22K F1.20 2 C -

R63 790SB

COMANCHE PEAK UNIT 2 PAGE: 140 DATE: 07/08/06 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ------------ I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS I **CALIBRATION BLOCK**

NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 12 SAFETY INJECTION 10-SI-2-082-2501R-2 713200 TCX-2-2533-H7 F-A VT-3 NA SNUBBER SI-2-082-402-C42K F1.20 2 C -

R154A820RB SAFETY INJECTION 8-SI-2-087-2501R-2 713400 TCX-2-2533-H3 F-A VT-3 NA STRUT SI-2-087-404-C42R F1.20 2 C -

R154A82ORB 713450 TCX-2-2533-H3 C-C PT 92 WELDED ATTACHMENT SI-2-087-404-C42R C3.20 2 C -

R154A82ORB 713500 TCX-2-2533-H4 F-A VT-3 NA STRUT SI-2-087-405-C42R F1.20 2 C -

R154A82ORB 713550 TCX-2-2533-H4 C-C PT 92 WELDED ATTACHMENT SI-2-087-405-C42R C3.20 2 C -

R154A82ORB 713800 TCX-2-2533-H5 F-A VT-3 NA STRUT SI-2-087-409-C42R F1.20 2 C -

R154A82ORB 713850 TCX-2-2533-H5 C-C PT 92 WELDED ATTACHMENT SI-2-087-409-C42R C3.20 2 C -

R154A820RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 141 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 12 I **CALIBRATION BLOCK**

SAFETY INJECTION 8-SI-2-087-2501R-2 714000 TCX-2-2533-H1 F-A VT-3 NA SNUBBER SI-2-087-411-C42K F1.20 2 C -

R154A82ORB 714050 TCX-2-2533-H1 C-C PT 92 WELDED ATTACHMENT SI-2-087-411-C42K C3.20 2 C -

R154A820RB 714100 TCX-2-2533-H2 F-A VT-3 NA SNUBBER SI-2-087-412-C42K F1.20 2 C -

R154A82ORB 714150 TCX-2-2533-H2 C-C PT 92 WELDED ATTACHMENT SI-2-087-412-C42K C3.20 2 C -

R154A82ORB 714500 TCX-2-2533-H6 F-A VT-3 NA SNUBBER SI-2-087-416-C42K F1.20 2 C -

R154A82ORB 714550 TCX-2-2533-H6 C-C PT 92 WELDED ATTACHMENT SI-2-087-416-C42K C3.20 2 C -

R154A820RB SAFETY INJECTION 8-SI-2-088-2501R-2 715200 TCX-2-2534-H1 F-A VT-3 NA SNUBBER SI-2-088-409-C42K F1.20 2 - X R154D817RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 142 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI I

SUMMARY

EXAMINATION AREA CATGY NDE - ---------- O U T A G E INSTRUCTIONS IDENTIFICATION ITEM NO METH I 2 1 2 3 12 I **CALIBRATION BLOCK**

NUMBER SAFETY INJECTION 8-SI-2-088-2501R-2 715250 TCX-2-2534-Hl C-C PT 92 WELDED ATTACHMENT SI-2-088-409-C42K C3.20 2 - X R154D817RB 715300 TCX-2-2534-H2 F-A VT-3 NA SNUBBER SI-2-088-410-C42K F1.20 2 - X R154D817RB 715350 TCX-2-2534-H2 C-C PT 92 WELDED ATTACHMENT SI-2-088-410-C42K C3.20 2 - X R154D817RB SAFETY INJECTION 10-SI-2-095-2501R-2 716500 TCX-2-2530-HI F-A VT-3 NA STRUT SI-2-095-403-$42R F1.20 2 C -

R77N 823SB 716550 TCX-2-2530-Hl C-C PT 92 WELDED ATTACHMENT SI-2-095-403-$42R C3.20 2 C -

R77N 823SB 717100 TCX-2-2535-H2 F-A VT-3 NA STRUT SI-2-095-409-C42R F1.20 2 - - X -

823RB 717150 TCX-2-2535-H2 C-C PT 92 WELDED ATTACHMENT SI-2-095-409-C42R C3.20 2 - X -

823RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 143 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I -- - - - - ----------- -----------

I

SUMMARY

EXAMINATION AREA CATGY NDE - ------------ OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 12 1 2 3 1 2 I **CALIBRATION BLOCK**

SAFETY INJECTION 10-SI-2-095-2501R-2 717500 TCX-2-2535-Hl F-A VT-3 NA STRUT SI-2-095-415-C42R F1.20 2 - X -

823RB 717550 TCX-2-2535-H1 C-C PT 92 WELDED ATTACHMENT SI-2-095-415-C42R C3.20 2 - - -- - X -

823RB SAFETY INJECTION 6-SI-2-171-2501R-2 717700 TCX-2-2535-H3 F-A VT-3 NA STRUT SI-2-171-401-C42R F1.20 2 - X -

823RB 717750 TCX-2-2535-H3 C-C PT 92 WELDED ATTACHMENT SI-2-171-401-C42R C3.20 2 - -- -X -

823RB SAFETY INJECTION 4-SI-2-300-1501R-2 718100 TCX-2-2561-Hl F-A VT-3 NA BOX SI-2-300-404-S22A F1.20 2 -

R067 789SB 718150 TCX-2-2561-NI C-C PT 92 WELDED ATTACHMENT SI-2-300-404-$22A C3.20 2 - - X -

R067 789SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 144 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ------------ --------------------- I

SUMMARY

EXAMINATION AREA CATGY NDE - OUTAGEE--- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

SAFETY INJECTION 4-SI-2-306-2501R-2 718200 TCX-2-2566-H18 F-A VT-3 NA STRUT SI-2-306-401-C42R F1.20 2 C -

R154B817RB 718300 TCX-2-2566-Hl1 F-A VT-3 NA STRUT SI-2-306-402-C42R F1.20 2 C -

R154B817RB 718400 TCX-2-2566-H8 F-A VT- 3 NA STRUT SI-2-306-403-C42R F1.20 2 C -

R154B817RB 718500 TCX-2-2566-H1 F-A VT-3 NA STRUT SI-2-306-404-C42R F1.20 2 C -

R154B823RR 718550 TCX-2-2566-H1 C-C PT 92 WELDED ATTACHMENT SI-2-306-404-C42R C3 .20 2 C -

R154B823RB 718600 TCX-2-2566-H9 F-A VT-3 NA STRUT SI-2-306-405-C42R F1.20 2 C -

R154B817RB 718700 TCX-2-2566-H12 F-A VT-3 NA STRUT SI-2-306-406-C42R F1.20 2 C -

R154B817RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 145 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK**

SAFETY INJECTION 4-SI-2-306-2501R-2 718800 TCX-2-2566-H16 F-A VT-3 NA STRUT SI-2-306-407-C42R F1.20 2 C -

R154B817RB 718900 TCX-2-2566-H20 F-A VT-3 NA STRUT SI-2-306-408-C42R F1.20 2 C -

R154B817RB 719000 TCX-2-2566-H24 F-A VT-3 NA STRUT SI-2-306-410-C42R F1.20 2 C -

R154B817RB 719400 TCX-2-2566-H6 F-A VT-3 NA SNUBBER SI-2-306-414-C42K F1.20 2 C -

R154B818RB 719600 TCX-2-2566-H2 F-A VT-3 NA STRUT SI-2-306-416-C42R F1.20 2 C -

R154B817RB 719650 TCX-2-2566-H2 C-C PT 92 WELDED ATTACHMENT SI-2-306-416-C42R C3.20 2 C -

R154B817RB 719900 xTCX-2-2566-H3 F-A VT-3 NA STRUT SI-2-306-420-C42R F1.20 2 C -

R154B817RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 146 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- __PLAN STATUS________ PRESERVICE YEAR FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH [12 123 12 *-CALIBRATION BLOCK**

SAFETY INJECTION 4-SI-2-306-2501R-2 719950 TCX-2-2566-H3 C-C PT 92 WELDED ATTACHMENT SI-2-306-420-C42R C3.20 2 C -

R154B817RB SAFETY INJECTION 16-SI-2-325-601R-2 721200 TCX-2-2501-H3 F-A VT-3 NA STRUT SI-2-325-700-$32R F1.20 2 C -

R63 803SB SAFETY INJECTION 16-SI-2-326-2501R-2 721210 TCX-2-2500-H2 F-A VT-3 NA STRUT SI-2-326-401-S32R F1.20 2 - - - - -X 798SB SAFETY INJECTION 3-SI-2-336-1501R-2 721300 TCX-2-2563-Hl0 F-A VT-3 NA SNUBBER SI-2-336-403-S22K F1.20 2 - X - - - -

R066 789SB SAFETY INJECTION 16-SI-2-914-151R-2 721700 TCX-2-2579-H4 F-A VT-3 NA BOX SI-2-914-402-S32A F1.20 2 - X R075 802SB 721750 TCX-2-2579-H4 C-C PT 92 WELDED ATTACHMENT SI-2-914-402-$32A C3.20 2 - X R075 802SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 147 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE--- ---------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 **CALIBRATION BLOCK**

SAFETY INJECTION 2-SI-2-066-2501R-2 721900 TCX-2-2566-H41 F-A VT-3 NA SNUBBER SI-2-RB-01OA-702-2 F1.20 2 C -

R154B815RB 722100 TCX-2-2566-H43 F-A VT-3 NA STRUT SI-2-RB-01OA-704-2 F1.20 2 C -

R154B815RB SAFETY INJECTION 2-SI-2-064-2501R-2 722200 TCX-2-2566-H44 F-A VT-3 NA SNUBBER SI-2-RB-01OB-701-2 F1.20 2 C -

R154B813RB 722300 TCX-2-2566-H45 F-A VT-3 NA SNUBBER SI-2-RB-01OB-703-2 F1.20 2 C -

R154B812RB SAFETY INJECTION 2-SI-2-068-2501R-2 725300 TCX-2-2566A-HlO F-A VT-3 NA U-BOLT SI-2-RB-058-704-2 F1.20 2 C -

R154D821RB FEEDWATER 18-FW-2-036-2003-2 750000 TCX-2-2101-MR1 F-A VT-3 NA MOMENT RESTRAINT DWG S2-0681 CP2-FWSSMR-01 F1.40 2 C -

RI0OA856SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 148 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ____ PLAN STATUS- PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE------------- ---

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 2 3 1 2 I **CALIBRATION BLOCK**

MAIN STEAM 32-MS-2-001-1303-2 750400 TCX-2-2100-MR1 F-A VT-23 NA MOMENT RESTRAINT DWG S2-0684 CP2-MSMEMR-01 F1.40 2 C -- - - - -

R108 877SB RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 750800 TCX-2-1120-1Sl F-A VT-3 NA DWG 2323-S2-0654 RHR HX 01 TOP SUPPORTS F1.40 2 - - - - -X R69 828SB 750900 TCX-2-1120-1S2 F-A VT-3 NA DWG 2323-S2-0654 RHR HX 01 INTERMEDIATE F1.40 2 - - X SUPPORTS R69 810SB 751000 TCX-2-1120-1S3 F-A VT-3 NA DWG 2323-S2-0654 RHR HX 01 FOUNDATION SUPPORTS F1.40 2 - - - - - - X R69 795SB RESIDUAL HEAT REMOVAL TCX-RHAPRH-01 751400 TCX-2-3100-1Sl F-A VT-3 NA FEET. DWG C-BX20WDFSGX16D RHR PUMP 01 SUPPORT F1.40 2 - X R53 773SB SAFETY INJECTION TCX-SIAPSI-02 751700 TCX-2-3140-1S1 F-A VT-3 NA FEET. DWG 300-J49738 SI PUMP 02 SUPPORT F1.40 2 - X - - - -

R060 773SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 149 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRDf ASME I PERIOD PERIOD PERIOD SEC. XI OUTAGE-- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 12 1 2 3 12 I **CALIBRATION BLOCK**

CHEMICAL & VOLUME CONTROL TCX-CSAPCH-01 751800 TCX-2-3110-1S1 F-A VT-3 NA SUPPORT CRADLE. DWG B49745 CENTRIFUGAL CHARGING PUMP 01 F1.40 2 - X -

R195 810AB CONTAINMENT SPRAY CP2-CTAHCS-01 752000 TCX-2-1180-1S1 F-A VT-3 NA DWG. 2323-S2-0654 CT HX 01 TOP SUPPORTS F1.40 2 - - - X - -

R69 828SB 752100 TCX-2-1180-1S2 F-A VT-3 NA DWG. 2323-S2-0654 CT HX 01 INTERMEDIATE SUPPORTS F1.40 2 - - - - X R69 810SB 752200 TCX-2-1180-1S3 F-A VT-3 NA DWG. 2323-S2-0654 CT HX 01 FOUNDATION SUPPORTS F1.40 2 - - - - X R69 795SB CONTAINMENT SPRAY CP2-CTAPCS-02 752700 TCX-2-2578-2PS1 F-A VT-3 NA SUPPORT CRADLE. DWG CT PUMP 02 SUPPORT F1.40 2 - - - X - - 15210085/88 R51 773SB CHEMICAL & VOLUME CONTROL TCX-CSAHRG-01 753000 TCX-2-1150-1S1 F-A VT-3 NA DWG D-4314-4 REGENERATIVE HX 01 SUPPORT F1.40 2 - X R15SC833RB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 150 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

. OUTAGE ---------- -

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

AUXILIARY FEEDWATER 810500 AF-2-SB-001-H6 F-A VT-3 NA STRUT AF-2-001-428-S33R F1.30 2 C -

2-074 810550 AF-2-SB-001-H6 D-A VT-1 NA WELDED ATTACHMENT AF-2-001-428-S33R D1.20 2C -

2-074 810700 AF-2-SB-001-H8 F-A VT-3 NA STRUT AF-2-059-401-S33R F1.30 2 C -

2-074 811800 AF-2-SB-002-H9 F-A VT-3 NA STRUT AF-2-002-439-S23R F1.30 2 C -

811850 AF-2-SB-002-H9 D-A VT-i NA WELDED ATTACHMENT AF-2-002-439-S23R D1. 20 2 C -

811900 AF-2-SB-003-Hi F-A NA STRUT AF-2-035-402-S33R F1.30 2 - X -

2-073 812250 AF-2-SB-003-H4 D-A VT-i NA WELDED ATTACHMENT AF-2-035-428-S33R D1.20 2 - X -

2-070

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 151 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ _ _ PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC . XI I .. . ..

SUMMARY

EXAMINATION AREA CATGY NDE I- - ----- O U T A G E -.----- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 21 2 1 2 3 1 2 **CALIBRATION BLOCK**

AUXILIARY FEEDWATER 812400 AF-2-SB-003-H6 F-A VT-3 NA BOX AF-2-035-700-S33A F1.30 2 - X -

2-074 812450 AF-2-SB-003-H6 D-A VT-i NA WELDED ATTACHMENT AF-2-035-700-S33A D1.20 2 - -- -X -

2-074 812460 AF-2-SB-003-H7 F-A VT-3 NA BOX AF-2-035-424-S33A F1.30 2 - - - X -

R074 808SB 812470 AF-2-SB-003-H7 D-A VT-I NA WELDED ATTACHMENT AF-2-035-424-S33A D1.20 2 - - - X -

R074 808SB 812500 AF-2-SB-004-H1 F-A VT-3 NA STRUT AF-2-003-402-S33R F1.30 2 - - - - X -

2-072 812600 AF-2-SB-004-H2 F-A VT-3 NA STRUT AF-2-003-404-S33R F1.30 2 - - X -

2-071 812700 AF-2-SB-004-H3 F-A VT-3 NA FRAME AF-2-003-407-S33A F1.30 2 - X -

2-072

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 152 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I- - OUTAGE ------- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 1 2 3 1 2 *"CALIBRATION BLOCK*

AUXILIARY FEEDWATER 812750 AF-2-SB-004-H3 D-A VT-I NA WELDED ATTACHMENT AF-2-003-407-S33A D1.20 2 - X -

2-072 812800 AF-2-SB-004-H4 F-A VT-3 NA STRUT AF-2-058-407-S33R F1.30 2 - - -- X -

2-072 812900 AF-2-SB-005-HI F-A VT-3 NA STRUT AF-2-003-405-S33R F1.30 2 - - X -

2-071 813000 AF-2-SB-005-H2 F-A VT-3 NA STRUT AF-2-003-406-S33R F1.30 2 - - - - X -

2-071 814000 AF-2-SB-006-H4 F-A VT-3 NA BOX AF-2-004-405-S33A F1.30 2 C -

2-073 814050 AF-2-SB-006-H4 D-A VT-i NA WELDED ATTACHMENT AF-2-004-405-S33A D1.20 2 C -

2-073 814800 AF-2-SB-010-H2 F-A VT-3 NA BOX AF-2-006-412-S33A F1.30 2 C -

2-074

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 153 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL. __PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME i PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE1-- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 23 1 2 i CALIBRATION BLOCK-AUXILIARY FEEDWATER 814850 AF-2-SB-010-H2 D-A VT-I NA WELDED ATTACHMENT AF-2-006-412-S33A DI.20 2 C -

2-074 815000 AF-2-SB-011-H2 F-A VT-3 NA BOX AF-2-00S-700-S33A F1.30 2C -

2-070 815050 AF-2-SB-011-H2 D-A VT-I NA WELDED ATTACHMENT AF-2-005-700-S33A D1.20 2 C -

2-070 815100 AF-2-SB-011-H3 F-A VT-3 NA BOX AF-2-084-401-S33A F1.30 2 C -

2-070 815150 AF-2-SB-011-H3 D-A VT-1 NA WELDED ATTACHMENT AF-2-084-401-S33A D1.20 2 C -

2-070 815500 AF-2-SB-012-H4 F-A VT-3 NA BOX AF-2-010-403-S33A F1.30 2 C -

2-072 815550 AF-2-SB-012-H4 D-A VT-i NA WELDED ATTACHMENT AF-2-010-403-S33A D1.20 2 C -

2-072

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 154 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI O---------OUTAGE

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK-AUXILIARY FEEDWATER 816600 AF-2-SB-013-H7 F-A VT-3 NA BOX AF-2-009-413-S33A F1.30 2 C -

2-073 816650 AF-2-SB-013-H7 D-A VT-i NA WELDED ATTACHMENT AF-2-009-413-S33A D1.20 2C -

2-073 816800 AF-2-SB-014-H1 F-A VT-3 NA BOX AF-2-061-401-S33A F1.30 2 C -

2-072 816850 AF-2-SB-014-HI D-A VT-i NA WELDED ATTACHMENT AF-2-061-401-S33A D1.20 2 C -

2-072 817100 AF-2-SB-014-H4 F-A VT-3 NA STRUT AF-2-099-401-S33R F1.30 2 C -

2-072 828600 AF-2-SB-017-H1 F-A VT-3 NA STRUT AF-2-028-402-S33R Fl.30 2 C -

2-072 819000 AF-2-SB-017-H5 F-A VT-3 NA STRUT AF-2-039-401-S33R F1.30 2 C -

2-072

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 155 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I ----------- ----------- ----------- I SUMM1ARY EXAMINATION AREA CATOY NDE -------- OUTAGE - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK*

AUXILIARY FEEDWATER 819500 AF-2-SB-019-HI F-A VT-3 NA STRUT AF-2-050-401-S33R F1.30 2 C -

2-072 820000 AF-2-SB-019-H6 F-A VT-3 NA STRUT AF-2-097-402-S33R Fl.30 2 C -

2-071 820100 AF-2-SB-019-H7 F-A VT-3 NA STRUT AF-2-097-403-S33R F1.30 2 C -

2-071 820200 AF-2-SB-019-H8 F-A VT-3 NA STRUT AF-2-097-406-S33R F1.30 2 C -

2-071 820250 AF-2-SB-019-H8 D7A VT-I NA WELDED ATTACHMENT AF-2-097-406-S33R D1.20 2 C -

2-071 820400 AF-2-SB-020-H2 F-A VT-3 NA STRUT AF-2-099-408-S33R Fl.30 2 - - X - - - -

R071 807SB 820700 AF-2-SB-020-H5 F-A VT-3 NA STRUT AF-2-099-411-S33R F1.30 2 - X - - - -

R071 807SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 156 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI .-


--OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY HDE - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~CALIBRATION BLOCK*"

AUXILIARY FEEDWATER 820800 AF-2-SB-020-H6 F-A VT-23 NA STRUT AF-2-099-412-S33R F1.30 2 - - X R071 807SB 820900 AF-2-SB-020-H7 F-A VT-3 NA STRUT AF-2-099-413-S33R F1.30 2 - - - x R082 807SB 821800 AF-2-SB-021-H3 F-A VT-3 NA STRUT AF-2-097-410-S33R F1.30 2 - X R082 807SB 821850 AF-2-SB-021-H3 D-A VT-i NA WELDED ATTACHMENT AF-2-097-410-S33R D1.20 2 - X R071 R07SB 822700 AF-2-SB-021-HI2 F-A VT-3 NA BOX AF-2-097-423-S33A F1.30 2 - - - - X - -

R082 807SB 822750 AF-2-SB-021-H12 D-A VT-1 NA WELDED ATTACHMENT AF-2-097-423-S33A D1.20 2 - - - X R082 807SB 825750 AF-2-SB-027-H6 D-A VT-I NA WELDED ATTACHMENT AF-2-030-403-S33R D1.20 2 - x R073 794SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 157 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- -PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD I ASME PERIOD PERIOD PERIOD I SEC . XI I -----------. ----......

SUMMARY

EXAMINATION AREA CATGY NDE I------ 0 U T A GE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH II 2 1 2 3 122 **CALIBRATION BLOCK-*

AUXILIARY FEEDWATER 826150 AF-2-SB-028-H1 D-A VT-1 NA WELDED ATTACHMENT AF-2-011-401-S33R D1. 20 2 - X - - - -

R074 805SB 827600 AF-2-SB-030A-Hl F-A VT-3 NA SPRING AF-2-025-401-S33S F1.30 2 - X - - - -

R074 793SB 829400 AF-2-SB-032-H2 F-A VT-3 NA U-BOLT AF-2-101-402-S33R F1.30 2 - X - - - -

R073 792SB 829500 AF-2-SB-032-H3 F-A VT-3 NA BOX AF-2-101-431-S33A F1.30 2 - - X - -

R073 792SB 829550 AF-2-SB-032-H3 D-A VT-i NA WELDED ATTACHMENT AF-2-101-431-S33A D1.20 2 - - X -

R073 792SB 836500 AF-2-SB-042-H1I F-A VT- 3 NA BOX AF-2-100-407-S33A F1.30 2 - - - X - -

R082 809SB 836550 AF-2-SB-042-H1I D-A VT-1 NA WELDED ATTACHMENT AF-2-100-407-S33A D1.20 2 - - - X R082 809SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: Ise INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS_ _ PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI - .. . .. .. ..

SUMMARY

EXAMINATION AREA CATGY NDE -O--------

- 0 U T A G E .--.-.-.-.- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK*

AUXILIARY FEEDWATER 837500 AF-2-SB-044-H1 F-A VT-3 NA BOX AF-2-102-405-S33A F1.30 2 - - X -

2-074 837550 AP-2-SB-044-H1 D-A VT-I NA WELDED ATTACHMENT AF-2-102-405-S33A DI.20 2 - - - - X -

2-074 838600 AF-2-SB-044-HI2 F-A VT-3 NA SNUBBER AF-2-102-416-S33K F1.30 2 - X -

2-082 839000 AF-2-SB-045-H1 F-A VT-3 NA BOX AF-2-096-405-S33A F1.30 2 - -- -x -

2-074 839050 AF-2-SB-045-HI D-A VT-i NA WELDED ATTACHMENT AF-2-096-405-S33A D1.20 2 - -- -X -

2-074 839600 AF-2-SB-045-H7 F-A VT-3 NA STRUT AF-2-096-413-S33R F1.30 2 - - -X -

2-082 839650 AF-2-SB-045-H7 D-A VT-I NA WELDED ATTACHMENT AF-2-096-413-S33R D1.20 2 - - -- -X -

2-082

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 159 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL. PLAN STATUS _ _ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I

SUMMARY

EXAMINATION AREA CATGY NDE I OUTAGEE--- - - --- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH4 I 1 2 1 2 3 1 2 *CALIBRATION BLOCK" AUXILIARY FEEDWATER 841000 AF-2-SB-046-H6 F-A VT-3 NA BOX AF-2-098-412-S33A F1.30 2 - X -

2-082 841050 AF-2-SB-046-H6 D-A VT-i NA WELDED ATTACHMENT AF-2-098-412-S33A D1.20 2 - -- -X -

2-082 841500 AF-2-SB-047-H3 F-A VT-3 NA STRUT AF-2-096-439-S43R F1.30 2 - - -X -

2-078 841550 AF-2-SB-047-R3 D-A VT-I NA WELDED ATTACHMENT AF-2-096-439-S43R D1.20 2 - - -X -

2-078 845800 AF-2-SB-055A-H3 F-A VT-3 NA STRUT AF-2-097-433-S53R F1.30 2 - - - -X -

2-094 845850 AF-2-SB-055A-H3 D-A VT-i NA WELDED ATTACHMENT AF-2-097-433-S53R D1.20 2 - - -X -

2-094 849200 AF-2-SB-063A-H1 F-A VT-3 NA STRUT AF-2-103-411-S53R F1.30 2 - X -

2-089

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 160 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE -1OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 1 23 1 2 *~CALIBRATION BLOCK*

AUXILIARY FEEDWATER 849250 AF-2-SB-063A-HI D-A VT-1 NA WELDED ATTACHMENT AF-2-103-411-S53R D1.20 2 - - -- -X -

2-089 849700 AF-2-SB-063A-H6 F-A VT-3 NA BOX AF-2-111-401-S63R F1.30 2 - - - - x -

2-100A 849750 AF-2-SB-063A-H6 D-A VT-1 NA WELDED ATTACHMENT AF-2-111-401-S63R D1.20 2 - X -

2-100A 850900 AF-2-YD-001-H1O F-A VT-3 NA STRUT AF-2-001-421-Y33R Fl.30 2 - - -X -

2-085D 850950 AF-2-YD-001-HlO D-A VT-1 NA WELDED ATTACHMENT AF-2-001-421-Y33R D1.20 2 - X -

2-085D 851450 AF-2-SB-010-H15 D-A VT-i NA WELDED ATTACHMENT AF-2-006-402-S33R D1.20 2 - - - X -

2-074 851650 AF-2-SB-010-H17 D-A VT-I NA WELDED ATTACHMENT AF-2-006-405-S33R D1.20 2 - - - X -

2-074

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 161 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME i PERIOD PERIOD PERIOD SEC. XI I OUTAGE-------------

SU?*MARY EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I **CALIBRATION BLOCK*-

AUXILIARY FEEDWATER 852200 AF-2-YD-002-H5 F-A VT-3 NA STRUT AF-2-002-418-Y33R F1.30 2 - - - X -

2-085D 852250 AF-2-YD-002-H5 D-A VT-I NA WELDED ATTACHMENT AF-2-002-418-Y33R D1.20 2 - - X -

2-085D 855000 AF-2-YD-006-H3 F-A VT-3 NA STRUT AF-2-043-403-Y43R F1.30 2 - - -- -X -

2-085D COMPONENT COOLING 856600 CC-2-AB-001-H5 F-A VT-3 NA STRUT CC-2-019-706-A43R F1.30 2 C X-204 856650 CC-2-AB-001-H5 D-A VT-i NA WELDED ATTACHMENT CC-2-019-706-A43R D1.20 2 C -

X-204 856700 CC-2-AB-001-H6 F-A VT-3 NA SPRING CC-2-019-707-A43S F1.30 2 C -

856750 CC-2-AB-001-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-019-707-A43S D1.20 2 C -

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 162 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRDf ASME I PERIOD PERIOD PERIOD SEC. XI I--------- OUTA E-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 *~CALIBRATION BLOCK**

COMPONENT COOLING 856800 CC-2-AB-001-H7 F-A VT-3 NA SPRING CC-2-019-713-A43S F1.30 2 C -

X-207 856850 CC-2-AB-001-H7 D-A VT-1 NA WELDED ATTACHMENT CC-2-019-713-A43S D1.20 2 C -

X-207 857050 CC-2-AB-001-H1O F-A VT-3 NA SNUBBER CC-2-019-715-A43K F1.30 2 C -

857100 CC-2-AB-002-H1 F-A VT-3 NA STRUT CC-2-045-001-A33R F1.30 2 C -

857200 CC-2-AB-002-H2 F-A VT-3 NA STRUT CC-2-045-002-A33R F1.30 2 C -

857300 CC-2-AB-002-H3 F-A VT- 3 NA STRUT CC-2-045-004-A33R F1.30 2 C -

859250 CC-2-AB-003-H6 D-A VT-I NA WELDED ATTACHMENT CC-2-012-707-A43R Dl.20 2 C -

X-207

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 163 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 23 1 2 **CALIBRATION BLOCK**

COMPONENT COOLING 859400 CC-2-AB-004-H1 F-A VT-3 NA SPRING CC-2-969-700-A43S F1.30 2 - - - X - -

R197 800AB 859450 CC-2-AB-004-H1 D-A VT-i NA WELDED ATTACHMENT CC-2-969-700-A43S D1.20 2 - - - - X R197 800AB 862300 CC-2-AB-006-H6 F-A VT-3 NA STRUT CC-2-028-401-A33R F1.30 2 C -

X-174 862350 CC-2-AB3-006-H6 D-A VT-I NA WELDED ATTACHMENT CC-2-028-401-A33R D1.20 2 C -

X-174 862500 CC-2-AB-006-H8 F-A VT-3 NA STRUT CC-2-028-404-A33R F1.30 2 C -

X-174 862550 CC-2-AB-006-H8 D-A VT-1 NA WELDED ATTACHMENT CC-2-028-404-A33R D1.20 2 C -

X-174 862700 CC-2-AB-006-H10 F-A VT-3 NA STRUT CC-2-028-424-A33R F1.30 2 C -

X-174

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 164 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ _ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 I *CALIBRATION BLOCK" COMPONENT COOLING 862750 CC-2-AB-006-HI0 D-A VT-1 NA WELDED ATTACHMENT CC-2-028-424-A33R D1.20 2 C -

X-174 862800 CC-2-AB-006-HlI F-A VT-3 NA BOX CC-2-028-704-A33A F1.30 2 C -

862850 CC-2-AB-006-Hll D-A VT-i NA WELDED ATTACHMENT CC-2-028-704-A33A D1.20 2 C -

863100 CC-2-AB-007-H2 F-A VT-3 NA BOX CC-2-045-007-A43A Fl.30 2 C -

863150 CC-2-AB-007-H2 D-A VT-i NA WELDED ATTACHMENT CC-2-045-007-A43A DI.20 2 C -

863900 CC-2-AB-008-H6 F-A VT-3 NA SPRING CC-2-015-701-A43S F1.30 2 C -

X-204 863950 CC-2-AB-008-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-015-701-A43S D1.20 2 C -

X-204

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 165 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- __PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC . xI I . . ..

SUMMARY

EXAMINATION AREA CATGY NDE - - - - --- 0 U T A G E --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 1 2 1 **CALIBRATION BLOCK" COMPONENT COOLING 864000 CC-2-AB-008-H7 F-A VT-3 NA SNUBBER CC-2-044-700-A43K F1.30 2 C -

X-204 864050 CC-2-AB-008-H7 D-A VT-I NA WELDED ATTACHMENT CC-2-044-700-A43K D1.20 2 C -

X-204 864200 CC-2-AB-009-H1 F-A VT-3 NA SPRING CC-2-050-001-A43S F1.30 2 C -

X-207 864250 CC-2-AB-009-H1 D-A VT-I NA WELDED ATTACHMENT CC-2-050-001-A43S D1.20 2 C -

X-207 864500 CC-2-AB-009-H4 F-A VT-3 NA SPRING CC-2-050-701-A43S F1.30 2 C -

X-197 864550 CC-2-AB-009-H4 D-A VT-i NA WELDED ATTACHMENT CC-2-050-701-A43S D1.20 2 C -

X-197 864600 CC-2-AB-009-HS F-A VT-3 NA SNUBBER CC-2-050-702-A43K F1.30 2 C -

X-197

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 166 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- _ PLAN STATUS_ _ PRESERVICE YEAR AEFIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE O U T A G E --- - ------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 1 2 **CALIBRATION BLOCK" COMPONENT COOLING 864650 CC-2-AB-009-H5 D-A VT-1 NA WELDED ATTACHMENT CC-2-050-702-A43K D1.20 2 C -

X-197 864700 CC-2-AB-009-H6 F-A VT-3 NA SPRING CC-2-050-703-A43S F1.30 2 C -

864750 CC-2-AB-009-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-050-703-A43S D1.20 2 C -

865200 CC-2-AB-010-H2 F-A VT-3 NA STRUT CC-2-116-701-A43R F1.30 2 C -

X-207 865300 CC-2-AB-011-Hl F-A VT-3 NA STRUT CC-2-110-700-A43R Fl.30 2 C -

X-207 865800 CC-2-AB-011-H6 F-A VT-3 NA BOX CC-2-155-701-A43A FI.30 2 C -

X-194 865850 CC-2-AB-011-H6 D-A VT-I NA WELDED ATTACHMENT CC-2-155-701-A43A D1.20 2 C -

X-194

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 167 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I ~CALIBRATION BLOCK**

COMPONENT COOLING 866100 CC-2-AB-012-H3 F-A VT-3 NA STRUT CC-2-126-401-A43R F1.30 2 C -

866300 CC-2-AB-012-H5 F-A VT-3 NA STRUT CC-2-133-401-A43R F1.30 2 C -

866400 CC-2-AB-012-H6 F-A VT-3 NA BOX CC-2-133-700-A43A F1.30 2 C -

866450 CC-2-AB-012-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-133-700-A43A D1.20 2 C -

866800 CC-2-AB-012-H1O F-A VT-3 NA SNUBBER CC-2-158-407-A43K F1.30 2 C -

X-207 866850 CC-2-AB-012-HI0 D-A VT-i NA WELDED ATTACHMENT CC-2-158-407-A43K D1.20 2 C -

X-207 866900 CC-2-AB-012-HII F-A VT-3 NA SNUBBER CC-2-158-408-A43K F1.30 2 C -

X-207

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 168 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRDf ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGEE -------- -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 11 2 *CALIBRATION BLOCK" COMPONENT COOLING 866950 CC-2-AB-012-Hll D-A VT-2 NA WELDED ATTACHMENT CC-2-158-408-A43K DI.20 2 C - - - - -

X-207 871600 CC-2-AB-017-H12 F-A VT-3 NA BOX CC-2-008-719-A33A F1.30 2 - X R174 800AB 871650 CC-2-AB-017-HI2 D-A VT-i NA WELDED ATTACHMENT CC-2-008-719-A33A D1.20 2 - X - -

R174 800AB 872000 CC-2-AB-018-H3 F-A VT-3 NA BOX CC-2-040-403-A33R F1.30 2 - - - X -

RI80 800AB 872050 CC-2-AB-018-H3 D-A VT-I NA. WELDED ATTACHMENT CC-2-040-403-A33R D1.20 2 - - X - - -

RI80 800AB 872100 CC-2-AB-018-H4 F-A VT-3 NA STRUT CC-2-040-404-A33R F I.30 2 - - X -

R180 800AB 872150 CC-2-AB-018-H4 D-A VT-i NA WELDED ATTACHMENT CC-2-040-404-A33R DI.20 2 - - X -

R180 800AB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 169 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I

-OUTAGEINSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH t12 123 1 2 I *CALIBRATION BLOCK**

COMPONENT COOLING 872200 CC-2-AB-018-H5 F-A VT-3 NA STRUT CC-2-048-401-A33R F1.30 2 - - - X -

R170 800AB 872900 CC-2-AB-018-H12 F-A VT-3 NA SPRING CC-2-048-410-A33S F1.30 2 - - X -

R180 800AB 876200 CC-2-AB-026-H2 F-A VT-3 NA BOX CC-2-057-014-A33A F1.30 2 - X - - - -

RI80 800AB 876250 CC-2-AB-026-H2 D-A VT-1 NA WELDED ATTACHMENT CC-2-057-014-A33A D1.20 2 - X - - -

R180 800AB 876700 CC-2-AB-027A-H4 F-A VT-3 NA SNUBBER CC-2-043-714-A33K F1.30 2 - X - - -

R180 800AB 876750 CC-2-AB-027A-H4 D-A VT-I NA WELDED ATTACHMENT CC-2-043-714-A33K D1.20 2 - - X - - - -

RI80 800AB 877100 CC-2-AB-027A-H8 F-A VT-3 NA BOX CC-2-066-700-A33A F1.30 2 - - X - - - -

R180 800AB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 170 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL -_ PLAN STATUS_ _ _PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I---- ----------- ---------- I

SUMMARY

EXAMINATION AREA CATGY NDE - ---------- 0 U T A G E------ -- . INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 *CALIBRATION BLOCK--

COMPONENT COOLING 8771S0 CC-2-AB-027A-H8 D-A VT-1 NA WELDED ATTACHMENT CC-2-066-700-A33A D1.20 2 - X -

R180 800AB 877200 CC-2-AB-027A-H9 F-A VT-3 NA BOX CC-2-068-700-A33A Fl.30 2 - X - - - -

R180 800AB 877250 CC-2-AB-027A-H9 D-A VT-i NA WELDED ATTACHMENT CC-2-068-700-A33A D1.20 2 - X - - - -

R180 800AB 878700 CC-2-AB-032-H9 F-A VT-3 NA U-BOLT CC-2-011-708-A63R F1.30 2 - - - X -

X-241 879800 CC-2-AB-033-H5 F-A VT-3 NA STRUT CC-2-007-010-A63R F1.30 2 - - - - X - -

X-241 879850 CC-2-AB-033-HS D-A VT-i NA WELDED ATTACHMENT CC-2-007-010-A63R Dl.20 2-° - - - X - -

X-241 880200 CC-2-AB-033-H9 F-A VT-3 NA STRUT CC-2-007-017-A63R Fl.30 2 - - - X X-241

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 171 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI -----------.-----------.-----------

SUMMARY

EXAMINATION AREA CATGY NDE - - 0O-------

U T A G E .--.-.-.-.- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I *CALIBRATION BLOCK--

COMPONENT COOLING 880250 CC-2-AB-033-H9 D-A VT-i NA WELDED ATTACHMENT CC-2-007-017-A63R D1.20 2 - - - X - -

X-241 880700 CC-2-AB-038-H3 F-A VT-3 NA SPRING CC-2-164-403-A53S F1.30 2 - - - - X 880750 CC-2-AB-038-H3 D-A VT-i NA WELDED ATTACHMENT CC-2-164-403-A53S D1.20 2 - - - X 881000 CC-2-AB-038-H6 F-A VT-3 NA SNUBBER CC-2-164-407-A63K F1.30 2 - - - X - -

X-235 882900 CC-2-AB-039-H9 F-A VT-3 NA STRUT CC-2-156-710-A53R F1.30 2 - - X -

X-194 882950 CC-2-AB-039-H9 D-A VT-1 NA WELDED ATTACHMENT CC-2-156-710-A53R D1.20 2 - - - X -

X-194 883000 CC-2-AB-049-HI F-A VT-3 NA SNUBBER CC-2-007-001-A73K F1.30 2 - - X -

X-245

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 172 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL- PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI OUTAGE --- ----------

SUMMARY

EXAMINATION AREA CATGY NDE II INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 -- CALIBRATION BLOCK**

COMPONENT COOLING 883050 CC-2-AB-049-HI D-A VT-1 NA WELDED ATTACHMENT CC-2-007-001-A73K D1.20 2 - - X -

X-245 883400 CC-2-AB-050-H1 F-A VT-3 NA STRUT CC-2-011-001-A63R F1.30 2 - - - x - - -

X-241 883450 CC-2-AB-050-H1 D-A VT-1 NA WELDED ATTACHMENT CC-2-011-001-A63R D1.20 2 - - - X -

X-241 883600 CC-2-AB-0S0-H3 F-A VT-3 NA STRUT CC-2-011-003-A73R F1.30 2 - - x -

X-245 883650 CC-2-AB-050-H3 D-A VT-I NA WELDED ATTACHMENT CC-2-011-003-A73R DI.20 2 - - X - - -

X-245 885100 CC-2-EC-001-H7 F-A VT-3 NA SPRING CC-2-035-709-E33S F1.30 2 - - - X X-115B 885150 CC-2-EC-001-H7 D-A VT-I NA WELDED ATTACHMENT CC-2-035-709-E33S D1.20 2 - - - - X X-115B

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 173 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL - PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE II --- - ---- -OUTAGE INSTRUCTIONS NUM1ER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I *CALIBRATION BLOCK**

COMPONENT COOLING 885400 CC-2-EC-001-H10 F-A VT-3 NA BOX CC-2-035-714-A33A F1.30 2 - - - X - -

X-180 885450 CC-2-EC-001-HIO D-A VT-I NA WELDED ATTACHMENT CC-2-035-714-A33A D1.20 2 - - - X - -

X-180 886300 CC-2-EC-003A-H1 F-A VT-3 NA STRUT CC-2-107-700-E23R F1.30 2 - - X -

X-115B 887000 CC-2-EC-004-H1 F-A VT-3 NA STRUT CC-2-105-401-E23R F1.30 2 - - - X - -

X-115B 887050 CC-2-EC-004-H1 D-A VT-1 NA WELDED ATTACHMENT CC-2-105-401-E23R D1.20 2 - - - X - -

X-115B 888300 CC-2-FB-002-H1 F-A VT-3 NA SNUBBER CC-2-126-004-F43K F1.30 2 - - - - X - -

891200 CC-2-RB-046-H2 F-A VT-3 NA BOX CC-2-204-407-C53A F1.30 2 - - X - - -

2-155E

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 174 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I -----------. ----......

SUMMARY

EXAMINATION AREA CATGY NDE I1 2.....OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 12 3 1 2 *-CALIBRATION BLOCK**

COMPONENT COOLING 891250 CC-2-RB-046-H2 D-A VT-i NA WELDED ATTACHMENT CC-2-204-407-C53A DI.20 2 - - - X -

2-155E 891600 CC-2-RB-046-H6 F-A VT-3 NA STRUT CC-2-204-421-C53R F1.30 2 - - - X -

2-15SE 891650 CC-2-RB-046-H6 D-A VT-I NA WELDED ATTACHMENT CC-2-204-421-C53R D1.20 2 - - X - -

2-155E 892000 CC-2-RB-086-H2 F-A VT-3 NA STRUT CC-2-246-423-C53R F1.30 2 - - - X -

2-155D 892050 CC-2-RB-086-H2 D-A VT-i NA WELDED ATTACHMENT CC-2-246-423-CS3R D1.20 2 - - -X -

2-155D 892200 CC-2-RB-084-H4 F-A VT-3 NA STRUT CC-2-249-404-C53R F1.30 2 - -- - -

2-155D 892250 CC-2-RB-084-H4 D-A VT-i NA WELDED ATTACHMENT CC-2-249-404-C53R D1.20 2 - - - -

2-155D

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 175 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. xI I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE -- ----- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METm I 1 2 1 2 3 12 i "CALIBRATION BLOCK" COMPONENT COOLING 892900 CC-2-RB-085-H6 F-A VT-3 NA STRUT CC-2-204-420-CS3R F1.30 - -X -

2-155E 892950 CC-2-RB-085-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-204-420-C53R D1.20 2 - X -

2-155E

'93600 CC-2-RB-086-H4 F-A VT-3 NA STRUT CC-2-246-419-C53R F1.30 2 - - X -

2-155D 893650 CC-2-RB-086-H4 D-A VT-i NA WELDED ATTACHMENT CC-2-246-419-CS3R D1.20 2 - - -X -

2-15SD 893800 CC-2-RB-086-H6 F-A VT-3 NA BOX CC-2-246-422-C53A P1.30 2 - - - x -

2-155D 893850 CC-2-RB-086-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-246-422-CS3A D1.20 2 - - - -

2-155D 894000 CC-2-RB-097-H1 F-A VT-3 NA STRUT CC-2-201-402-CS3R F1.30 2 - - - X -

2-155G

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 176 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __ PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD I ASME I PERIOD PERIOD PERIOD I SEC. XI OUTAGE --- ---------

SUMMARY

EXAMINATION AREA CATOY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~CALIBRATION BLOCK--

COMPONENT COOLING 894050 CC-2-RB-097-H1 D-A VT-I NA WELDED ATTACHMENT CC-2-201-402-C53R D1.20 2 - - X -

2-155G 894100 CC-2-RB-097-H2 F-A VT-3 NA STRUT CC-2-201-404-C53R F1.30 2 - - X - - -

2-155G 894150 CC-2-RB-097-H2 D-A VT-_1 NA WELDED ATTACHMENT CC-2-201-404-C53R D1.20 2 - - X -

2-155G 894700 CC-2-SB-034B-H1 F-A VT-3 NA STRUT CC-2-008-406-S33R F1. 30 2 - - - X - -

2-070 894750 CC-2-SB-034B-HI D-A VT-1 NA WELDED ATTACHMENT CC-2-008-406-$33R D1.20 2 - - - - X 2-070 894900 CC-2-SB-034B-H3 F-A VT-3 NA STRUT CC-2-030-401-S33R FI.30 2 - - - x 2-070 895600 CC-2-SB-035-H4 F-A VT-3 NA BOX CC-2-028-428-$33R F1.30 2 - - - X - -

2-070

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 177 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ PLAN STATUS PRESERVICE YEAR IRST SECOND THIRD ASME P :RIOD PERIOD PERIOD SEC. XI l .

- - -OUTAGE-------------

SUMMARY

EXAMINATION AREA CATGY NDE -" - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NOMETH 1 2 1 2 3 1 2 I CALIBRATION BLOCK" COMPONENT COOLING 895650 CC-2-SB-035-H4 D-A VT-I NA WELDED ATTACHMENT CC-2-028-428-$33R D1.20 2 - - - X -

2-070 895700 CC-2-SB-035-H5 F-A VT-3 NA BOX CC-2-031-409-S33R F1.30 2 - - - X - -

2-070 995750 CC-2-SB-035-HS D-A VT-i NA WELDED ATTACHMENT CC-2-031-409-$33R D1.20 2 - - - X -

2-070 896600 CC-2-SB-036-H3 F-A VT-3 NA STRUT CC-2-028-417-$33R F1.30 2 - - - X -

2-071 896650 CC-2-SB-036-H3 D-A VT-I NA WELDED ATTACHMENT CC-2-028-417-S33R D1.20 2 - - - X -

2-071 896700 CC-2-SB-036-H4 F-A VT-3 NA STRUT CC-2-028-422-$33R F1.30 2 - - X - - -

2-071 896750 CC-2-SB-036-H4 D-A VT-1 NA WELDED ATTACHMENT CC-2-028-422-$33R D1.20 2 - - X -

2-071

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 178 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE I- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 1 2 I CALIBRATION BLOCK--

COMPONENT COOLING 896900 CC-2-SB-037-H2 F-A VT-3 NA SPRING CC-2-077-403-$43S FI.30 2 - - - X - - -

2-069 896950 CC-2-SB-037-H2 D-A VT-1 NA WELDED ATTACHMENT CC-2-077-403-S43S D1.20 2 - - X -

2-069

.897200 CC-2-SB-037-H5 F-A VT-3 NA SPRING CC-2-077-406-S435 F1.30 2 - - X -

2-069 897250 CC-2-SB-037-H5 D-A VT-i NA WELDED ATTACHMENT CC-2-077-406-S435 D1.20 2 - - X - - -

2-069 897400 CC-2-SB-038-HI F-A VT-3 NA SNU3BER CC-2-031-401-S33K F1.30 2C -

2-069 897450 CC-2-SB-038-HI D-A VT-i NA WELDED ATTACHMENT CC-2-031-401-S33K D1.20 2 C -

2-069 897600 CC-2-SB-038-H3 F-A VT-3 NA SPRING CC-2-031-407-S43S F1.30 2 C -

2-069

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 179 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ _ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I---- ----------- ---------- I

SUMMARY

EXAMINATION AREA CATGY NDE -- ------- UT A GE---- -- ------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 1 2 1 2 3 1 2 I "*CALIBRATION BLOCK--

COMPONENT COOLING 897650 CC-ý-SB-038-H3 D-A VT-1 NA WELDED ATTACHMENT CC-2-031-407-S43S D1.20 2 C -

2-069 898200 CC-2-SB-039-H2 F-A VT- 3 NA STRUT CC-2-028-409-$33R F1.30 2C -

2-063 898250 CC-2-SB-039-H2 D-A VT-I NA WELDED ATTACHMENT CC-2-028-409-S33R D1.20 2 C -

2-063 898400 CC'2-SB-039-H4 F-A VT-3 NA SNUBBER CC-2-028-411-S33K F1.30 2 C -

2-063 898450 CC-2-SB-039-H4 D-A VT-I NA WELDED ATTACHMENT CC-2-028-411-$33K D1.20 2 C -

2-063 898500 CC-2-SB-039-H5 F-A VT-3 NA SNUBBER CC-2-028-412-$33R F1.30 2 C -

2-064 898550 CC-2-SB-039-HS D-A VT-i NA WELDED ATTACHMENT CC-2-028-412-S33R D1.20 2 C -

2-064

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 180 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I--------- OUTAGE

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 I CALIBRATION BLOCK" COMPONENT COOLING 898600 CC-2-SB-039-H6 F-A VT-3 NA STRUT CC-2-028-413-S33R F1.30 2 C -

2-064 898650 CC-2-SB-039-H6 D-A VT-1 NA WELDED ATTACHMENT CC-2-028-413-S33R D1.20 2C -

2-064 898700 CC-2-SB-039-H7 F-A VT-3 NA STRUT CC-2-028-414-S33R F1.30 2 C -

2-065 898750 CC-2-SB-039-H7 D-A VT-i NA WELDED ATTACHMENT CC-2-028-414-$33R D1.20 2 C -

2-065 899300 CC-2-SB-040-H5 F-A VT-3 NA SPRING CC-2-065-411-S43S F1.30 2 C -

2-068 899350 CC-2-SB-040-H5 D-A VT-I NA WELDED ATTACHMENT CC-2-065-411-S43S D1.20 2 C -

2-068 900200 CC-2-SB-042-HS F-A VT-3 NA BOX CC-2-065-402-$33R F1.30 2 C -

2-070

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 181 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD I SEC. XI - . . ..

SUMMARY

EXAMINATION AREA CATGY NDE I- -.-.--- OUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 ~*CALIBRATION BLOCK*

COMPONENT COOLING 900250 CC-2-SB-042-HS D-A VT-i NA WELDED ATTACHMENT CC-2-065-402-$33R D1.20 2 C -

2-070 900300 CC-2-SB-042-H6 F-A VT-3 NA STRUT CC-2-065-404-$33R F1.30 2 C -

2-068

.q00350 CC-2-SB-042-H6 D-A VT-i NA WELDED ATTACHMENT CC-2-065-404-S33R D1.20 2 C -

2-068 900500 CC-2-SB-042-H8 F-A VT-3 NA STRUT CC-2-078-401-$33R FI.30 2 C -

2-070 900550 CC-2-SB-042-H8 D-A VT-I NA WELDED ATTACHMENT CC-2-078-401-S33R D1.20 2 C -

2-070 902500 CC-2-SB-047-H2 F-A VT-3 NA STRUT CC-2-008-402-$33R F1.30 2 - - - X -

R063 800AB 902550 CC-2-SB-047-H2 D-A VT-i NA WELDED ATTACHMENT CC-2-008-402-$33R D1.20 2 - - X -

R063 800SB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 182 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -- - - - - .

SUMMARY

EXAMINATION AREA CATGY NDE If G E-- ----- I -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 II *-CALIBRATION BLOCK--

COMPONENT COOLING 903100 CC-2-SB-048-H3 F-A VT-3 NA STRUT-With App RR D-i CC-2-159-409-S53R F1.30 2 - - - X - -

R088 839SB 903150 CC-2-SB-048-H3 D-A VT-1 NA WELDED ATTACHMENT-App RR D-1 CC-2-159-409-SS3R D1.20 2 - - - - X -

R088 839SB 903800 CC-2-SB-052-H3 F-A VT- 3 NA STRUT-with APP RR D-1 CC-2-155-408-$53R F1.30 2 - - - X R088 839SB 903850 CC-2-SB-052-H3 D-A VT-I NA WELDED ATTACHMENT-App RR D-1 CC-2-155-408-S53R DI.20 2 - - - -X R088 839SB 904000 CC-2-SB-052-H5 F-A VT-3 NA BOX CC-2-202-401-$53A F1.30 2 - - -X -

2-088 904050 CC-2-SB-052-H5 D-A VT-i NA WELDED ATTACHMENT CC-2-202-401-S53A D1.20 2 - - - -X -

2-088 907750 CC-2-SB-063-H4 D-A VT-1 NA WELDED ATTACHMENT CC-2-146-405-$43R D1.20 2 - - x - - -

2-086

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 183 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I- ---- -OUTAGE - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 2 2 123 1 2 I ~CALIBRATION BLOCK" COMPONENT COOLING 908100 CC-2-SB-063-H8 F-A VT-3 NA STRUT CC-2-167-402-S43R F1.30 2 - - - X -

2-086 908150 CC-2-SB-063-H8 D-A VT-I NA WELDED ATTACHMENT CC-2-167-402-S43R D1.20 2 - - - X - - -

2-086 DIESEL OIL 910600 DO-2-DG-018-H2 F-A VT-3 NA BOX DO-2-056-402-D53A F1.30 2 - X - - -

R085 838DG 910650 DO-2-DG-018-H2 D-A VT-i NA WELDED ATTACHMENT DO-2-056-402-D53A D1.20 2 - X R085 838DG 910900 DO-2-DG-020-H2 F-A VT-3 NA BOX DO-2-053-402-D53A F1.30 2 - - X - -

R085 838DG 910950 DO-2-DG-020-H2 D-A VT-1 NA WELDED ATTACHMENT DO-2-053-402-D53A D1.20 2 - X -

R085 838DG MAIN STEAM 912800 MS-2-SB-001-HI F-A VT-3 NA BOX MS-2-415-001-S23R F1.30 2 - - X 2-074

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 184 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _PLAN STATUS _PRESERVICE YEAR I

FIRST SECOND THIRD I I

ASME PERIOD PERIOD PERIOD I i

SEC. XI I--------- OUTAGE------------

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 123 12 -- CALIBRATION BLOCK**

MAIN STEAM 912850 MS-2-SB-001-H1 D-A VT-2 NA WELDED ATTACHMENT MS-2-415-001-S23R D1.20 2- x - -

2-074 912900 MS-2-SB-001-H2 F-A VT-3 NA STRUT MS-2-416-401-S33R F2.30 2 - - - x - -

2-074 913600 MS-2-SB-002-H1 F-A VT-3 NA STRUT MS-2-416-405-S43R F1.30 2 - - - x - -

2-082 913650 MS-2-SB-002-H1 D-A VT-i NA WELDED ATTACHMENT MS-2-416-405-S43R D1.20 2 - - - - X 2-082 SERVICE WATER 915800 SW-2-AB-003-Hl F-A VT-3 NA STRUT SW-2-004-001-A33R F1.30 2 - x R175 800AB 915900 SW-2-AB-003-H2 F-A VT- 3 NA STRUT SW-2-004-002-A33R F1.30 2 - x R175 800AB q16100 SW-2-AB-003-H4 F-A VT-3 NA STRUT SW-2-004-005-A33R F1.30 2 - - X R175 800AB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 185 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR l

FIRST SECOND THIRD l

ASME PERIOD PERIOD PERIOD l

SEC. XI I----------- ------------ ----------- ll

SUMMARY

EXAMINATION AREA CATCY NDE ----

- - -OUTAGE ----------- INSTRUCTIONS I

NUMBER IDENTIFICATION ITEM NO METH I1 2 1 2 3 1 2 -*CALIBRATION BLOCK**

SERVICE WATER 916200 SW-2-AB-003-H5 F-A VT-3 NA STRUT SW-2-004-006-A33R F1.30 2 - X - - - -

R175 800AB 917200 SW-2-AB-005-H3 F-A VT-3 NA STRUT SW-2-102-020-A43R F1.30 2 - - X -

R204 817AD 917250 SW-2-AB-005-H3 D-A VT-1 NA WELDED ATTACHMENT SW-2-102-020-A43R D1.20 2 - - X -

R204 817AB 918600 SW-2-AB-006-H7 F-A VT-3 NA STRUT SW-2-173-022-A43R F1.30 2 - X - - -

R207 810AB 918650 SW-2-AB-006-H7 D-A VT-I NA WELDED ATTACHMENT SW-2-173-022-A43R D1.20 2 - X - - - -

R207 810AB 919700 SW-2-AB-007-H2 F-A VT-3 NA SNUBBER SW-2-012-022-F33K Fl.30 2 - - - X RFBSW787AB 919750 SW-2-AB-007-H2 D-A VT-1 NA WELDED ATTACHMENT SW-2-012-022-F33K D1.20 2 - - - - X - -

RFBSW787AB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE- 186 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD I ASME I PERIOD PERIOD PERIOD I SEC. XI I--------- OUTA E--- ----------- I

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 12 I **CALIBRATION BLOCK*

SERVICE WATER 920600 SW-2-AB-008-H2 F-A VT-3 NA SNUBBER SW-2-010-002-A33K F1.30 2 - X - - - -

R175 787AB 921600 SW-2-AB-008-H13 F-A VT-3 NA SNUBBER SW-2-129-004-A33K F1.30 2 - - -x -

R175 787AB 921650 SW-2-AB-008-H13 D-A VT-I NA WELDED ATTACHMENT SW-2-129-004-A33K D1.20 2 - - - X -

R175 787AB 924500 SW-2-AB-010-H14 F-A VT-3 NA STRUT SW-2-129-025-A43R F1.30 2 - - X - - - -

R207 787AB 924550 SW-2-AB-010-H14 D-A VT-i NA WELDED ATTACHMENT SW-2-129-025-A43R D1.20 2 - - X -

R207 787AB 925650 SW-2-AB-012-H1 D-A VT-1 NA WELDED ATTACHMENT SW-2-132-006-A43R D1.20 2 - - - - -X X-207 927000 SW-2-AB-012-H15 F-A VT-3 NA STRUT SW-2-132-021-A43R F1.30 2 - - -- -X X-207

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE - 187 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD I SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I- ------ OUTAGE --- - ---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 2 1 2 3 1 2 -CALIBRATION BLOCK--

SERVICE WATER 927050 SW-2-AB-012-H15 D-A VT-I NA WELDED ATTACHMENT SW-2-132-021-A43R D1.20 2 - - - - -X X-207 931300 SW-2-FB-001-H7 F-A VT-3 NA STRUT SW-2-001-021-F33R F1.30 2 - - - - - -X 931350 SW-2-FB-001-H7 D-A VT-1 NA WELDED ATTACHMENT SW-2-0O1-021-F33R D1.20 2 - - - - - -X 934000 SW-2-FB-004-H8 F-A VT-3 NA SNUBBER SW-2-012-024-F33K F1.30 2 - - X X-FBSWT 934050 SW-2-FB-004-H8 D-A VT-I NA WELDED ATTACHMENT SW-2-012-024-F33K D1.20 2 - - X X-FBSWT 934500 SW-2-SB-013-Hi F-A VT-3 NA BOX SW-2-102-429-S43A F1.30 2 - - X 2-082 934550 SW-2-SB-013-Hl D-A VT-i NA WELDED ATTACHMENT SW-2-102-429-S43A D1.20 2 - - - - -

2-082

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PACE: 188 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRDf ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE -- 0 U T A G E --- - ------ ---INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~CALIBRATION BLOCK-SERVICE WATER 934700 SW-2-SB-013-H3 F-A VT-3 NA STRUT SW-2-102-431-S43R F1.30 2 - - - X 2-082 934750 SW-2-SB-013-H3 D-A VT-i NA WELDED ATTACHMENT SW-2-102-431-S43R D1.20 2 - - - - -

2-082

.934900 SW-2-SB-013-HS F-A VT-3 NA STRUT SW-2-102-433-S43R F1.30 2 - - - - -X 2-082 934950 SW-2-SB-013-H5 D-A VT-I NA WELDED ATTACHME*NT SW-2-102-433-S43R D1.20 2 - - - - - -

2-082 935100 SW-2-SB-013-H7 F-A VT-3 NA STRUT SW-2-102-435-S43R F1.30 2 - - - - -X 2-082 935150 SW-2-SB-013-H7 D-A VT-I NA WELDED ATTACHMENT SW-2-102-435-S43R D1.20 2 - - - - -x 2-082 935300 SW-2-SB-013-H9 F-A VT-3 NA STRUT SW-2-102-437-S43R FI.30 2 - - - - - -

2-082

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 189 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL. -_ PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE G ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 112 1 2 3 12 I -- CALIBRATION BLOCK**

SERVICE WATER 935350 SW-2-SB-013-H9 D-A VT-i NA WELDED ATTACHMENT SW-2-102-437-S43R D1.20 2 - - - - -X 2-082 935800 SW-2-SB-014-H5 F-A VT-3 NA BOX SW-2-129-445-S43A F1.30 2 - - - - X 2-082 935850 SW-2-SB-014-H5 D-A VT-i NA WELDED ATTACHMENT SW-2-129-445-S43A D1.20 2 - - - -- -X 2-082 936500 SW-2-SB-018-H1 F-A VT-3 NA STRUT SW-2-100-401-S33R F2.30 2 - - - - - -X 2-070 936550 SW-2-SB-018-H1 D-A VT-i NA WELDED ATTACHMENT SW-2-100-401-S33R D1.20 2 - - - - -X 2-070 936700 aW-2-SB-019-H2 F-A VT-3 NA STRUT SW-2-102-439-S43R F1.30 2 - - - - -X 2-082 936750 SW-2-SB-019-H2 D-A VT-1 NA WELDED ATTACHMENT SW-2-102-439-S43R D1.20 2 - - X 2-082

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 190 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ___ PLAN STATUS_ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SOUTAGE.------------

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 ~*CALIBRATION BLOCK..

SERVICE WATER 937000 SW-2-SB-019-HS F-A VT-3 NA STRUT SW-2-102-443-S43R F1.30 2 - - x 2-082 937050 SW-2-SB-019-H5 D-A VT-I NA WELDED ATTACHMENT SW-2-102-443*S43R D1.20 2 - - - - - X 2-082 938500 SW-2-SB-021-Hg F-A VT-3 NA STRUT SW-2-132-416-S43R P1.30 2 - - -- x 2-082 938550 SW-2-SB-021-HG D-A VT-1 NA WELDED ATTACHMENT SW-2-132-416-S43R D1.20 2 - - x 2-082 938800 SW-2-SB-021-H9 F-A VT-3 NA STRUT SW-2-132-443-S33R F1.30 2 - -- x 2-070 938850 SW-2-SB-021-H9 D-A VT-1 NA WELDED ATTACHMENT SW-2-132-443-S33R D1.20 2 - - - - - -x 2-070 939200 SW-2-SB-022-H4 F-A VT-3 NA BOX SW-2-173-410-S43A FI.30 2 - - - X

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 191 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD I ASME PERIOD PERIOD PERIOD I SEC. XI I--------- OUTAGE

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1*2 123 12 I **CALIBRATION BLOCK-SERVICE WATER 939250 SW-2-SB-022-H4 D-A VT-1 NA WELDED ATTACHMENT SW-2-173-410-S43A D1.20 2 - - - - - -X 939700 SW-2-SB-023-H5 F-A VT-3 NA BOX SW-2-132-439-S43A F1.30 2 - - - - - -X 2-082 939750 SW-2-SB-023-HS D-A VT-i NA WELDED ATTACHMENT SW-2-132-439-S43A D1.20 2 - - X 2-082 943150 SW-2-YD-005-H17 D-A VT-i NA WELDED ATTACHMENT SW-2-173-704-S33R D1.20 2 - X 2-070 943200 SW-2-YD-005-H18 F-A VT-3 NA BOX SW-2-173-705-Y33A F1.30 2 - - - - -X 2-085D 943250 SW-2-YD-005-H18 D-A VT-1 NA WELDED ATTACHMENT SW-2-173-705-Y33A D1.20 2 - - - - - -X 2-085D 943900 SW-2-YD-006-H6 F-A VT-3 NA BOX SW-2-132-428-Y33R F1.30 2 - X - -

R08SD800YD

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 192 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS _ PRESERVICE YEAR I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE -.-.-- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 11 2 1 2 3 12 I ~CALIBRATION BLOCK**

SERVICE WATER 943950 SW-2-YD-006-H6 D-A VT-I NA WELDED ATTACHMENT SW-2-132-428-Y33R D1.20 2 - X - - - -

R085D800YD 945000 SW-2-YD-006-H17 F-A VT-3 NA BOX SW-2-132-701-Y33A F1.30 2 -

R085D800YD 945050 SW-2-YD-006-H17 D-A VT-i NA WELDED ATTACHMENT SW-2-132-701-Y33A D1.20 2 - - X - - -

R085D800YD 946950 SW-2-YD-007-H18 D-A VT-i NA WELDED ATTACHMENT SW-2-102-471-S33R D1.20 2 - - - - - -X 2-070 947100 SW-2-YD-007-H20 F-A VT-3 NA STRUT SW-2-102-482-Y33R F1.30 2 - - - - -X 2-085D 947150 SW-2-YD-007-H20 D-A VT-I NA WELDED ATTACHMENT SW-2-102-482-Y33R D1.20 2 - - X 2-085D SW-2-YD-007-H21 "47200 SW-2-YD-007-H21 F-A VT-3 NA BOX SW-2-102-700-Y33A F1.30 2 - X 2-085D

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 193 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRDf ASME PERIOD PERIOD PERIOD SEC. XI I . . .. .. ..-

SUM*MARY EXAMINATION AREA CATGY NDE - .-------- 0 U T A G E -- ----- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 -- CALIBRATION BLOCK--

SERVICE WATER 947250 SW-2-YD-007-H21 D-A VT-I NA WELDED ATTACHMENT SW-2-102-700-Y33A D1.20 2 - - - - - -X 2-085D 948150 SW-2-YD-008-H8 D-A VT-i NA WELDED ATTACHMENT SW-2-129-456-Y33R D1.20 2 - - X 2-085D 948950 SW-2-YD-008-H16 D-A VT-i NA WELDED ATTACHMENT SW-2-129-464-Y33R D1.20 2 - - X 2-085D AUXILIARY FEEDWATER 4-AP-2-104-2003-3 950000 AF-2-SB-055B-MR1 F-A VT-3 NA MOMENT RESTRAINT, S2-0688-10 CP2-AFSSMR-01 F1.40 2 - - -X -

R100A861SB AUXILIARY FEEDWATER 4-AF-2-107-2003-3 950200 AF-2-SB-027B-MR3 F-A VT-3 NA MOMENT RESTRAINT, S2-0688-12.

CP2-AFSSMR-03 F1.40 2 - X REPLACES SW-2-SI-004-PS1,-PS2, R100A861SB AND -PS3. REFER TO SECTION 6.0 OF THE ISI PROGRAM PLAN.

COMPONENT COOLING WATER CP2-CCAPCC-01 951400 CC-2-AB-001-PS1 F-A VT-3 NA BASE. DWG FP-1421067417 CCW PUMP SUPPORTS F1.40 2 - X -

R205 810AB

DATE: 07/08/06 COMANCHE PEAK UNIT 2 PAGE: 194 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS PRESERVICE YEAR I FIRST SECOND THIRD I ASME j PERIOD PERIOD PERIOD SEC. XI I -----------

SUMMARY

EXAMINATION AREA CATGY NDE - -------- OUTAGE ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 1 2 1 2 3 1 2 I **CALIBRATION BLOCK-COMPONENT COOLING WATER CP2-CCAHHX-01 951600 CC-2-AB-005-HXS1 F-A VT-3 NA DWG 2-74-06-32467D3 CCW HX SUPPORT F1.40 2 - - x R174 790AB 951700 CC-2-AB-005-HXWS1 D-A VT-I NA SADDLES. DWG 2-74-06-32467D3 CCW HX SUPPORT WELDED D1.10 2 - - x ATTACHMENT R174 790AB COMPONENT COOLING WATER CP2-CCATST-01 952000 CC-2-AB-045-TS1 F-A VT-3 NA DWG N-2640-359 CCW SURGE TANK SUPPORTS F1.40 2 - - - - - -x R245 873AB 952100 CC-2-AB-045-TWS1 D-A VT-1 NA SADDLE. DWG N-2640-359 CCW SURGE TANK SUPPORTS WELDED D1.10 2 - - - - -x ATTACH.

R245 873AB CHEMICAL & VOLUME CONTROL TCX-CSAHLD-01 952200 CS-2-SB-104-HXS1 F-A VT-3 NA DWG 5665 LETDOWN HX SUPPORTS F1.40 2 - X R81 790SB 952300 CS-2-SB-104-HXWS1 D-A VT-i NA SADDLE. DWG 5665 LETDOWN HX SUPPORTS WELDED D1.10 2 - X ATTACHMENTS R81 790SB

APPENDIX A APPENDIX A RELIEF REQUESTS It is impractical within the limitations of the CPSES plant design, geometry and accessibility for TXU Energy to meet certain requirements of Articles IWA, IWB, IWC, JWD and IWF of the Code. Compliance with these requirements would result in hardships or unusual difficulties without a compensating increase in the level of plant quality or safety. Therefore, pursuant to 10CFR50.55a(g) (5) (iii), the relief requested from the Inservice Inspection requirements of IOCFR50.55a(g) (4) (I) is discussed in detail in this appendix. Relief is requested for the first 120 month interval of the CPSES inservice inspection program.

Appendix A - Page I of 2

APPENDIX A STATUS OF CPSES UNIT 2 ISI PLAN / RELIEF REQUESTS (UNIT2:1998 EDITION OF ASME CODE SECTION XI TO 2000 ADDENDA INTERVAL START DATE - AUGUST 3,2004, SECOND INTERVAL)

REVISION/

RELIEF SUBJECT SUBMITTED TO NRC APPROVAL OR DENIAL REQUEST ISSUED Revision 0 Unit 2 ISI Program Plan TXX-04 131, 07/28/2004 0 CPSES-200401770 Revision I Unit 2 ISI Program Plan TXX-05137, 08/23/2005 CPSES-200501743 Revision 2 Unit 2 ISI Program Plan TXX-06128 2 CPSES-200601367 A-I Re-submittal of the Relief Request for alternative TXX-05204, 12/15/2005 RI-ISI examinations for selected class I and 2 CPSES-200502480 piping welds ( ASME Code Categories B-F, B-J, TXX-06101, 6/28/2005 C-F-I, and C-F-2) CPSES-200601 B-I Relief is requested to allow the use of Code Case TXX-04165, 09/15/2004 Approved N-566-2 for leakage at bolted connections CPSES-2004021 10 NRR- 10435,4/29/2005 B-2 Relief is requested for a reduction in examination Pending issuance of TXX letter coverage (>10%) for a RC pipe to valve weld. SMF-2006-000648 (TCX- 1-4105-6)

C-i Relief is requested for a reduction in examination TXX-05203, 12/01/2005 coverage (>10%) for the Excess Letdown Heat CPSES-200502474 Exchanger head to flange weld.

(TCX-2-1 110-1)

General Notes:

I/ A revision to the ISI Plan is usually issued after completion of the each refueling outage and prior to the next refueling outage. ISI Plan revisions include items such as rescheduled exams and updated drawings. A request for relief from the ASME Code is requested separately from Plan revisions. A relief request is assigned a unique identifier, which consists of a letter representing the Code Subsection, followed by a sequential number. (e.g., B-6 is assigned as the sixth request for relief from a requirement in Subsection IWB.)

2. Copies of the IS!Program Plan Revisions are forwarded to the a) NRC Document Control Desk, b) NRC Region IV, c) NRC Resident Inspectors, d) NRR Project Manager, and e) Texas Department of Licensing and Regulation (TDLR) and f) authorized Nuclear Inservice Inspector (ANII).

Appendix A Page 2 of 2

Appendix B (OPEN)

APPENDIX C APPENDIX C ADOPTED CODE CASES NRC APPROVAL CODE CASE SUBJECT DOCUMENT A N-416-3 Alternative Pressure Test Requirement for Welded R.G.l.147 Rev. 14 Repairs or Installation of Replacement Items by Welding B N-435-1 Alternative Examination Requirements for Vessels with R.G.1.147 Rev. 14 Wall Thicknesses 2 inches or less C N-457 Qualification Specimen Notch Location for Ultrasonic R.G.l.147 Rev. 13 Examination of Bolts and Studs D N-460 Alternative Examination Coverage for Class I and Class R.G.l.147 Rev. 14 2 Welds E N-461-1 Alternative Rules for Piping Calibration Block R.G.l.147 Rev. 13 Thickness F N-481 Alternative Examination Requirements for Cast R.G.l.147 Rev. 14 Austenitic Pump Casing G N-491-2 Alternative Rules for Examination of Class 1, 2, 3 and R.G.l.147 Rev. 14 MC Component Supports of Light-Water Cooled Power Plants H N-498-4 Alternative Requirements for 10-Year System R.G.1.147 Rev. 14 Hydrostatic Testing for Class 1, 2 and 3 Systems Alternative Rules for Repair of Class 1, 2, and 3 I N-504-2 R.G.1.147 Rev. 14 Austenitic Stainless Steel Piping J N-522 Pressure Testing of Containment Isolation Piping R.G.1.147 Rev. 14 K N-524 Alternative Requirements for Longitudinal Welds in R.G.l.147 Rev. 13 Class I and 2 Piping L N-526 Alternative Requirements for Successive Inspections of R.G.1.147 Rev. 14 Class I and 2 Vessels M N-528-1 Purchase, Exchange, or Transfer of Material Between R.G.1.147 Rev. 14 Nuclear Plant Sites N N-532-1 Alternative Requirements for Repair and Replacement R.G.1.147 Rev. 14 Documentation Requirements and In-service Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000 0 N-533-1 Alternative Requirements for VT-2 Visual Examination R.G.1.147 Rev. 14 of Class 1, 2 and 3 Insulated Pressure-Retaining Bolted Connections Appendix C - Page I of 2

APPENDIX C ADOPTED CODE CASES NRC APPROVAL CODE CASE SUBJECT DOCUMENT P N-552 Alternative Methods - Qualification of Nozzle Inside R.G.I.147 Rev. 14 Radius Section From the Outside Surface Q N-566-2 Corrective Action for Leakage Identified at Bolted Pending - NRC Connections Approval Required; R.G.1.147 Rev. 14 R N-573 Transfer of Procedure Qualification Records Between R.G.1.147 Rev. 13 Owners S N578 Risk Informed Requirements for Class 1, 2, and 3 Pending - NRC Piping, Method B Approval Required; RR required T N-597 Requirements for Analytical Evaluation of Pipe Wall NRC Letter 08/13/01 Thinning U N-616 Alternative Requirements for VT-2 Visual Examination R.G.l.147 Rev. 14 of Classes 1,2, 3 Insulated Pressure Retaining Bolted Connections V N-639 Alternative Calibration Block Material R.G.l.147 Rev. 14 W N-648-1 Alternative Requirements for Inner Radius Examination R.G.1. 147 Rev. 14 of Class 1 Reactor Vessel Nozzles X N-649 Alternative Requirements for IWE-5240 Visual R.G.1.147 Rev. 14 Examination NOTES:

Code Cases used in 2RF08 - (B,D,L,M,N,O,U)

Code Cases proposed for use in 2RF09 - (B,D,L,MN,O,U,X)

Appendix C - Page 2 of 2

APPENDIX D N\

APPENDIX P ULTRASONIC CALIBRATION BLOCKS Calibration Block Size System/

Block No. Pia Scthedule Component TBX-1 12.25"L x 6.00"W x 3.50"T SA-533 Gr. B Pressurizer Class-I C.S.

Reactor TBX-2 8.00"L x 3.00"W x 3.00"T A351 CF8M Coolant Pipe (1982)

TBX-3 3" sch. 160 A376 Type-316 Piping 4"1 sch. 160 A376 Type-304 Control Rod Drive TBX-4 Mech. Housings TBX-5 6" sch. 160 A376 Type-304 Piping TBX-6 6" sc. 40S A376 Type-304 Piping TBX-7 8" sch. 40S A376 Type-304 Letdown Reheat Heat Exchanger TBX-8 8" sch. 140 A376 Type-316 Excess Letdown Heat Exchanger TBX-9 10" sch. 140 A376 Type-304 Regenerative Heat Exchanger TBX-10 10" sch. 40S A312 Type-316 Piping TBX-11 12" sch. 40S A312 Type-316 Piping TBX-12 12" sch. 140 A376 Type-304 Piping TBX-13 14" sch. 140 A376 Type-316 Piping TBX-14 14" sch. 40 A358 Type-316 Piping TBX-15 16" sch. 40S A312 Type-304 Piping TBX-16 9.00"L x 4.00"W x .468"T A240 Type-304 Seal Water Heat Exchanger TBX-17 8" sch. 80 A106 Grade-B C.S. Piping TBX-18 8" sch. 160 A312 Type-304 Piping TBX-19 14" sch 160 A312 Type-304 Piping Appendix D - Page I of 5

APPENDIX D ULTRASONIC CALIBRATION BLOCKS Cailbration Block Size System/

BX-k2S Pi1e Schedule Material omnentm TBX-20 16" sch. 80 A106 Grade-B C.S. Piping TBX-21 18" sch. 80 A106 Grade-B C.S. Piping TBX-22 24" sch. 80 A106 Grade-B C.S. Piping TBX-23 1.50 sch. 160 A376 Type-316 Piping TBX-24 2" sch. 160 A376 Type-316 Piping TBX-25 7" Lg. Stud SA-540 C.S. R.V. Stud & R.C. Pump Bolting (1982)

TBX-26 22.10"L x 6.00"W x 6.30"T SA-533 Grade-A Reactor Vessel Class-1 C.S. Bottom Head TBX-27 20.8"L x 6.00"W x 4.00"T SA-533 Grade-A Steam Generator Class-I C.S. Secondary Side TBX-28 19.10"L x 6.00"W x 5.45"T SA-508 Grade-A Steam Generator Channel Class-2 C.S. Head to Tubesheet TBX-29 30.10"L x 6.00"W x 8.60"T SA-533 Grade-A Reactor Vessel Class-] C.S. Closure Head TBX-30 13.00"L x 4.00"W x 1.00"T SA-240 Type-304 Residual Heat Exchanger TBX-31 9.00"L x 4.00"W x .625"T SA-240 Type-304 Horizontal Letdown Heat Exchanger TBX-32 9.00"L x 4.00"W x .312"T SA-240 Type-304 Volume Control Tank TBX-33 32'x 1.25"T SA-106 Grade-B C.S. 32" Main Steam TBX-34 6" sch. 120 SA-333 Grade-6 C.S. Piping TBX-35 6" sch. 80 SA-333 Grade-6 C.S. Piping TBX-36 6" sch. 160 SA-106 Grade-B C.S. Piping TBX-37 8" sch. 160 SA-106 Grade-B C.S. Piping Appendix D - Page 2 of 5

APPENDIX D ULTRASONIC CALIBRATION BLOCKS Calibration Block Size System/

Block No. PieShdl Material Piping TBX-38 18" sch 140 SA-106-Grade-B C.S.

SA-106 Grade-B C.S. Piping TBX-39 24" sch. 100 TBX-40 13.00"L x 4.00"W x 1.502"T SA-515-74B Grade-70 Pressurizer Skirt Weld TBX-41 12' sch. 30 SA-106 Grade-B C.S. R.C. Drain Tank Heat Exchanger TBX-42 8" sch. 40S SA-333 Grade-7 C.S. Excess Letdown Heat Exchanger TBX-43 12" sch. 20 A-312 Type-304 R.C. Drain Tank Heat Exchanger TBX-44 3" sch. 80 SA-312 Type-304 Piping TBX-45 4" sch. 80 SA-312 Type-304 Piping TBX-46 14" sch. 40 SA-312 Type-304 Piping TBX-47 14"x .500"T SA-312 Type-304 Piping TBX-48 16" sch. 30 SA-312 Type-304 Piping TBX-49 18" x .375"T SA-312 Type-304 Piping TBX-50 24" sch. 20 SA-312 Type-304 Piping TBX-51 12" sch. 80 SA-312 Type-304 Piping TBX-52 24"L x 6.812" dia. SA-540 Gr. B24 RPV Stud (1993)

TBX-53 9.25L x 2.125" dia. SA-193 Gr. B7 SI Pump Stud TBX-54 35"L x 4.5" dia. SA-540 Gr. B24 RC Pump Stud (1993)

TBX-55 5.5" x 4.5" x 5.8" SA-508 Cl. 2 Pr Spr Nozzle IR TBX-56 1 " x 4.5" x 9.93" SA-508 Cl. 2 SG FW Nozzle IR TBX-57 12" x 12" x 2.7" A-351 Gr. CF8M Reactor Coolant Pipe (1993)

Appendix D - Page 3 of 5

APPENDIX D ULTRASONIC CALIBRATION BLOCKS Calibration Block Size System/

Block No. PieSchedul TBX-58 7-1/2" x 7" x 8' SA-508 CI.2 Pr Surge Nozzle IR TBX-59 7"x7"x7" SA-508 C1.2 Pr.Sfty/Rlf Nozzle IR TBX-RV-1 45.00" x 11.00"W x I 1.00"T SA-533 Gr. B Cl. 1 Basic I "

RPV Block TBX-RV-2 36.00"L x 9.00"W x 9.00"T SA-533 Gr. B Cl. 1 Basic 9" RPV Block TBX-RV-3 28.00"L x 6.00"W x 7.00"T SA-533 Gr. B Cl. 1 Basic 7" RPV Block TBX-RV-4 20.00"L x 6.00"W x 5.00"T SA-533 Gr. B Cl. I Basic 5" RPV Block TBX-RV-5 33.00"L x 11.00"W x 11.00"T SA-533 Gr. B Cl. I RPV Flange Ligament TBX-RV-6 10.00"L x 6.00"W x 3.00"T SA-503 Cl. 2 RPV Safe End TBX-RV-7 41.50"L x 7.00"W x 15.25"T ASTM A508 Cl. 2 RPV Shell TCX-RV-1 45.00"L x 11.00"W x I 1.00"T SA-533 Gr. B. Cl. 1 Basic 11" RPV Block TCX-RV-2 36.00"L x 9.00"W x 9.00"T SA-533 Gr. B Cl. 1 Basic 9" RPV Block TCX-RV-3 28.00"L x 6.00"W x 7.00"T SA-533 Gr. B Cl. I Basic 7" RPV Block TCX-RV-4 20.00"L x 6.00"W x 5.00"T SA-533 Gr. B Cl. I Basic 5" RPV Block TCX-RV-5 33.00"L x 11.00"W x 11.00"T SA-533 Gr. B Cl. 1 RPV Flange Ligament TCX-RV-6 10.00"L x 6.00"W x 3.00"T SA-503 Cl. 2 RPV Safe End SS-CB-1 '/"T to 3"T x 3"W step SA-312 Type 304 Stainless Steel Alt Block CS-CB-1 1/2"T to 3"T x 3"W step SA-516 Gr. 70 Carbon Steel Alt Block DM-CB-1 9"L x 4"W x 2"T SA-312/SA-516 Dissimilar Metal Alt Blk Appendix D - Page 4 of 5

APPENDIX D ULTRASONIC CALIBRATION BLOCKS Calibration Block Size System/

Material PDI-01 14.00"L x 2.00"W x 14.00"T A-508 Cl. 2 RPV Block PDI-02 9.5"L x 2.00"W x 4 Steps SA-516 Gr.70 C.S Piping Alt. Block PDI-03 9.5"L x 2.00"W x 4 Steps SA-312 Type 304 S.S Piping Alt Block PDI-04 9.5"L x 2.00"W x 4 Steps SA-312 Type 316 S.S Piping Alt. Block SAP 10294 6.797"dia x 57.687" long SA-540 Gr. B24 RPV Closure Stud SG-IR 12.00"L x 12.00"W x 1.5"T Lucite Steam Generator Inner Radius Appendix D - Page 5 of 5

APPENDIX E APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX-- #REV#

TCX-1-1100 2 TCX-1-1 100A 2 TCX-1-1200 Sh. 1 1 TCX-1-1200 Sh. 2 1 TCX-1-1300 I TCX-1-1300A I TCX-1-1400 2 TCX-1-2100 I TCX-1-3100 1 TCX-1-4100 1 TCX-1-4101 I TCX-I-4102 3 TCX-1-4103 3 TCX-I-4104 I TCX-1-4105 I TCX-1.4106 I TCX-1-4107 2 TCX-1-4108 2 TCX-1-4109 1 TCX-1.4110 I TCX-1-4200 1 TCX-1-4201 3 TCX-1-4202 4 TCX-1-4203 3 TCX-1-4204 1 TCX-1-4205 2 TCX-1-4206 1 TCX-1-4207 1 TCX-1-4300 1 TCX-1-4301 2 TCX-1-4302 2 TCX-1-4303 4 Appendix E - Page I of 5

APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TC'X# REV#

TCX-1-4304 I TCX-1,-4305 1 TCX-1-4306 1 TCX-1-4307 1 TCX-1-4308 1 TCX-1-4400 1 TCX-1-4401 1 TCX-1-4402 2 TCX-1-4403 2 TCX-1-4404 2 TCX-1-4405 1 TCX-1-4406 1 TCX-1-4407 2 TCX-1-4408 1 TCX-1-4409 1 TCX-1-4500 2 TCX-1-4501 1 TCX-1-4502 1 TCX-1.-4503 1 TCX-1-4504 1 TCX-1-4505 4 TCX-1-4506 4 TCX-1.-4507 2 TCX-1-4600 2 TCX-1-5100 1 TCX-1-5100A 1 TCX-2-1 100 1 TCX-2-1110 1 TCX-2-1120 1 TCX-2-1130 1 TCX-2-1140 1 Appendix E - Page 2 of 5

APPENDIX E TCX ISOMETRIC DRAWINGS TAB3LE TCX REV#

TCX-2-1 150 I TCX-2-1180 2 TCX-2-2100 3 TCX-2-2101 2 TCX-2-2102 2 TCX-2-2103 1 TCX-2-2200 3 TCX-2-2201 2 TCX-2-2202 I TCX-2-2203 3 TCX-2-2204 2 TCX-2-2300 3 TCX-2-2301 2 TCX-2-2302 3 TCX-2-2303 3 TCX-2-2400 3 TCX-2-2401 2 TCX-2-2402 2 TCX-2-2403 2 TCX-2-2500 3 TCX-2-2501 3 TCX-2-2520 2 TCX-2-2521 I TCX-2-2530 2 TCX-2-2531 I TCX-2-2532 I TCX-2-2533 2 TCX-2-2534 2 TCX-2-2535 2 TCX-2-2536 2 TCX-2-2537 I TCX-2-2538 1 Appendix E - Page 3 of 5

APPENDIX E TCX ISOMETRIC DRAWINGS TABLE

=#RE TCX-2-2538A I TCX-2-2539 I TCX-2-2539A I TCX-2-2540 2 TCX-2-2541 2 TCX-2-2542 1 TCX-2-2550 I TCX-2-2551 1 TCX-2-2560 3 TCX-2-2561 2 TCX-2-2562 2 TCX-2-2563 I TCX-2-2564 1 TCX-2-2565 1 TCX-2-2566 2 TCX-2-2566A 1 TCX-2-2567 I TCX-2-2568 1 TCX-2-2569 I TCX-2-2570 I TCX-2-2571 I TCX-2-2572 I TCX-2-2573 1 TCX-2-2574 I TCX-2-2575 2 TCX-2-2576 2 TCX-2-2577 2 TCX-2-2578 2 TCX-2-2579 2 TCX-2-2580 2 TCX-2-2581 2 TCX-2-2582 2 Appendix E - Page 4 of 5

APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX REV-TCX-2-2583 2 TCX-2-2584 1 TCX-2-2585 I TCX-2-2586 1 TCX-2-3100 I TCX-2-3 110 1 TCX-2-3140 1 Appendix E- Page 5 of 5

APPENDIX F APPENDIX F RECORD OF REVISIONS Revision 0 - Original issue Revision 1 - Added adopted Code Cases in Appendix C and corrected the typographical error in the ISI Summary Table of Section 4.0.(There is no Attachment I to Appendix F.)

Revision 2 - Identified owner as Owner/Designated Agent in Sections 1.3 and 1.10

- Added information relative to RI-ISI for selected class I and 2 piping welds

- Added information relative to drawings in Section 2.2

- Revised section 4.3 for snubbers

- Revised section 5.3 for insulated bolted connections

- Revised section 4.0 for the Section XI Summary Table and Sections 4.1, 4.2, and 4.3 (ISI Examination Tables for class 1, 2, and 3 components) to reflect completed, rescheduled, removed, and added exams per 2RF09 and the RI-ISI evaluation/update for the third period of the first interval for Unit 2. The summary numbers (examination items) affected by this revision are listed in Attachment 2 to Appendix F of this Plan.

- Updated Appendix A to reflect the current status of relief requests

- Updated Appendix C to reflect the current list of approved, adopted Code Cases

- Updated Appendix F to add the record of revision and corresponding Attachment 2 to the Appendix for Plan revision 2.

Appendix F - Page 1 of I

Revision 2 - AFFECTED

SUMMARY

NUMBERS:

The following summary numbers identify examination items completed during the first refueling outage (2RF09) of the first period, second interval.

003100 669400 722100 862800 014400 669450 722200 862850 014500 669500 722300 863100 014800 669600 725300 863150 015300 669650 750000 863900 020200 669700 750400 863950 020900 669800 810500 864000 021000 669900 810550 864050 022550 671900 810700 864200 048800 672000 811800 864250 094244 672400 811850 864500 094249 683200 814000 864550 094282 683400 814050 864600 094300 683450 814800 864650 094400 696300 814850 864700 094800 697000 815000 864750 094900 706900 815050 865200 095300 710860 815100 865300 183900 713200 815150 865800 184000 713400 815500 865850 184500 713450 815550 866100 186100 713500 816600 866300 500700 713550 816650 866400 600000 713800 816800 866450 603600 713850 816850 866800 603700 714000 817100 866850 603800 714050 818600 866900 603900 714100 819000 866950 604100 714150 819500 897400 605400 714500 820000 897450 605500 714550 820100 897600 608800 716500 820200 897650 608900 716550 820250 898200 618800 718200 856600 898250 618900 718300 856650 898400 619200 718400 856700 898450 640530 718500 856750 898500 640540 718550 856800 898550 640550 718600 856850 898600 640560 718700 857050 898650 640570 718800 857100 898700 640580 718900 857200 898750 640830 719000 857300 899300 653400 719400 859250 899350 655400 719600 862300 900200 655700 719650 862350 900250 655800 719900 862500 900300 655900 719950 862550 900350 669200 721200 862700 900500 669300 721900 862750 900550 Appendix F Attachment 2 - Page I of 2

Revision 2 - AFFECTED

SUMMARY

NUMBERS:

The following summary numbers identify examination items that have been added to the schedule based on the RI-ISI Evaluation/Update for the third period, first interval:

108500 156800 215400 312921 108600 156900 215400 312937 108700 157000 216600 312947 124200 192200 216700 312948 124300 192300 217000 312951 124400 192900 217100 312952 141000 193000 221500 312960 141100 215200 221000 312961 141200 215300 221900 312976 The following summary numbers identify examination items that have been removed from the schedule based on the RI-ISI Evaluation'Update for the third period, first interval:

312911 312937 312944 312965 312914 312942 312947 312975 The following summary numbers identify examination items that have been rescheduled:

002800 094282 313100 751400 094244 096400 313200 952200 094249 313000 676600 952300 Appendix F Attachment 2 - Page 2 of 2