(Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009
ML071770137
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 06/19/2007
From: Blevins M, Madden F
TXU Generation Co, LP, TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200700951, EA-03-009, TXX-07091
Download: ML071770137 (2)


Text

f TXU w6' Power TlW Power 00lm Elvis CoacePeak Steam Senkor Vice President &

aCef Nuear Officer P. 0. Box 1002 (EDl)

Glen Rwpa TX 7W043 Tet 254 897 52C9 Fax: 254 89786652 mike.b~eviins~tLxuccm CPSES-200700951 Log # TXX-07091 June 19, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 UNIT 1 PRESSURIZER WELD OVERLAY 60 DAY REPORT AND UPDATE FOR UNIT 1 REACTOR PRESSURE VESSEL HEAD REPLACEMENT REGARDING REVISED ORDER EA-03-009 REF: 1. TXU Power letter, logged TXX-07013, from Mike Blevins to the NRC dated January 30, 2007

2. TXU Power letter, logged TXX-07079, from Mike Blevins to the NRC dated April 5, 2007
3. NRC Letter dated February 20, 2004, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors

Dear Sir or Madam:

By means of Reference 1, TXU Generation Company LP (TXU Power) committed to submit a report with the results of future inspections or mitigation of Pressurizer Alloy 82/182 butt weld locations within 60 days of startup from the outage during which they were performed.

Pressurizer Alloy 82/182 butt weld structural weld overlay was completed for Unit 1 during refueling outage 1RF 12 which ended April 20, 2007. Reference 2 submitted the required information on April 5, 2007. No further action is required for Unit 1 Pressurizer Alloy 82/182 butt welds.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance A-110 Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • South Texas Project ° Wolf Creek

TXX-07091 Page 2 of 2 During Unit 1 refueling outage 1RF12 the reactor pressure vessel head was replaced.

Per Reference 3, no inspections were required during this outage. The type and frequency of future inspections will be performed as required by Section IV.C.(4) of Reference 3 for a replaced reactor pressure vessel head.

This communication contains no new or revised licensing basis commitments for CPSES.

If you have any questions or need additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.

Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC, Its General Partner Mike Blevins By: ~/re W. Madden Director, Oversight and Regulatory Affairs JCH c- B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES