Category:Letter type:CPSES
MONTHYEARCPSES-201001000, Operator Licensing Examination Data, Form 5362010-07-28028 July 2010 Operator Licensing Examination Data, Form 536 CPSES-200901377, Operator Licensing Examination Data2009-09-29029 September 2009 Operator Licensing Examination Data CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.2007-11-15015 November 2007 Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-10-22022 October 2007 Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0909 October 2007 Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0202 October 2007 Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data2007-08-29029 August 2007 Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)2007-08-22022 August 2007 Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20082007-08-0303 August 2007 Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 CPSES-200701284, (Cpses), Operator Licensing Examination Data2007-08-0202 August 2007 (Cpses), Operator Licensing Examination Data CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 72007-07-20020 July 2007 Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-07-18018 July 2007 Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)2007-07-17017 July 2007 Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-06-21021 June 2007 Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-0092007-06-19019 June 2007 (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 CPSES-200701059, Submittal of Startup Report, Cycle 132007-06-13013 June 2007 Submittal of Startup Report, Cycle 13 CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves2007-05-22022 May 2007 License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability2007-05-0707 May 2007 Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report2007-04-30030 April 2007 Transmittal of Year 2006 Radioactive Effluent Release Report CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change2007-04-18018 April 2007 Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700691, Core Operating Limits Report, Cycle 132007-04-0404 April 2007 Core Operating Limits Report, Cycle 13 CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 20062007-03-30030 March 2007 Transmittal of the Annual Radiological Environmental Operating Report for 2006 CPSES-200700607, Property Damage Insurance2007-03-29029 March 2007 Property Damage Insurance CPSES-200700606, Decommissioning Report2007-03-29029 March 2007 Decommissioning Report CPSES-200700573, Request to Withdraw Relief Request A-72007-03-22022 March 2007 Request to Withdraw Relief Request A-7 CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)2007-03-19019 March 2007 Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-03-0909 March 2007 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data2007-02-28028 February 2007 Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports2007-02-22022 February 2007 Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)2007-02-22022 February 2007 Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2007-02-0202 February 2007 Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-01-30030 January 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2007-01-29029 January 2007 Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)2007-01-24024 January 2007 Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-01-18018 January 2007 License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature2007-01-10010 January 2007 Annual Report of Changes in Peak Cladding Temperature CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.2006-12-19019 December 2006 License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.2006-12-19019 December 2006 License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. 2010-07-28
[Table view] |
Text
~A~7 TxU Power IXU PGwer M~ike Bleviris Carnan&e Peak Steam Senior Vice President &
Electric Station Chief rM.ucfeair Officer P' 0.. Box 1002 (EGI)
Glen, Rose,. TX 76043~
Td'- 2,54 897 52f39 Ref. # I10CFR50.55a lFax.- 254. 897 6652 rrke~btevfrns@xu-cor CPSES-2007001 27 Log # TXX-07008 January 24, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-446 SUBMITTAL OF UNIT 2 NINETH REFUELING OUTAGE (2RF09)
INS ERVICE INSPECTION (ISI)
SUMMARY
REPORT (UNJT2: 1998 EDITION OF ASME CODE SECTION XI, THROUGH 2000 ADDENDA, INTERVAL START DATE -
AUGUST 3, 2004, SECOND INTERVAL)
Dear Sir or Madam:
This letter forwards the Inservice Inspection Summary Report for the nineth refueling outage of CPSES Unit 2. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code, Section Xl, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon . Palo Verde
-A DY7
TXX-07008 Page 2 of 2 This communication contains no new licensing basis commitments regarding Comanche Peak Steam Electric Station (CPSES) Unit 2.
If you have any questions or need additional informnation regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.
Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC, Its General Partner Mike Blevins By: A6LjQ(7?jk
/Fred W. Madden Director, Oversight & Regulatory Affairs JCLI Enclosure c- B. S. Mallett, Region IV (dlo)
M. C. Thadani, NRR (dlo)
Resident Inspectors, CPSES (dlo)
T. Parks, Chief Inspector, TDLR
ENCLOSURE to TXX-07008 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number rPSFS WI7RF09 Owner TXU Power P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)
Plant Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)
Unit No. 2 Commercial service August 3, 1993 Refueling outage no. 9 date Current inspection interval 2 (15t, 2 nd, 3rd) 4 th, other)
Current inspection period 1 list, 2nd, 3 rd)
Edition and Addenda of Section XI applicable to the inspection plan 1998 Edition, 2000 Addenda Date and revision of inspection plan CPSES ISI Progiram Plan, Int. 2. Rev. 2. July 14. 2006 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan. Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization N/A Expira N/A Signed (if applicable) I~C!)?Its Dt O0wner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION i, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province Texas and employed by Hartford Steam Boiler I and I Co. of CT of Hartford, CT have inspected the items described in this Owner's ActivityReport, during the period July 1, 2005 to January 15, 2007 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacement, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his mployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or conneceted ith his pection.
Commissions k/eI ( 47i/, Ir rlý I ector's Signature National Board, iState, Province and Endorsements Date - o This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300 OAR-i Page I of 5
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%)to Examination Required For The Credited for This Credited (%)for Date for the Category Interval Period* The Period-* Interval Remarks B-A 24 1 100 4 NOTE 3 B-B 8 2 100 25 B-D 36 10 100 27 B-G-1 165 0 0 0 NOTE4 B-G-2 19 4 100 21 NOTE 4 B-K 8 2 100 25 B-L-1 1 0 0 0 NOTES 1, 3 B-L-2 1 0 0 0 NOTES 1, 4 B-M-2 4 1 50 25 NOTES 1, 4, 9 B-N-i 3 1 100 33 NOTE 2 B-N-2 1 0 0 0 NOTE 3 B-N-3 1 0 0 0 NOTE3 B-0 4 0 0 0 NOTE 3 B-P NOTES5 NOTE S NOTES5 NOTE 5 NOTES 2, 5 B-Q NOTE 7 NOTE 7 NOTE 7 NOTE 7 NOTE 7 C-A 19 4 100 21 C-B 8 2 100 25 C-C 95 25 100 26 C-D 1 1 100 100 C-G 6 2 100 33 C-N NOTES NOTES NOTES5 NOTES5 NOTES5 0-A 140 41 100 29 0-B NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 F-A F1.10 87 18 100 21 F-A F1.20 253 60 100 24 F-A F1.30 168 54 100 32 F-A F1.40 98 32 106 33 NOTE 8 R-A 142 39 100 28 NOTE 6
- This column is interpreted to represent the cumulative number of exams performed to date in this period.
This column is interpreted to represent the cumulative percentage of scheduled exams for the interval which have been completed to date in this period.
OAR-i Page 2 of S
NOTES:
- 1. Examinations for pumps and valves are limited to components selected for examination under Examination Categories B-L-1, B-L-2, and B-M-2.
- 2. Examination Categories B-N-i and B-P do not have to follow the required percentages of Table IWB-241 2-i.
- 3. Examinations for Examination Categories B-A, B-L-i, B-N-2, B-N-3, and B-0 may be deferred to the end of the inspection interval.
- 4. Examinations for Examination Categories B-G-i1, B-G-2, B-L-2, and B-M-2 may be deferred until dissassembly of a component for maintenance, repair/ replacement, or volumetric examination.
- 5. Visual Examinations (VT-2) for system leakage tests are performed each fuel cycle, period, and interval, according to the requirements of IWA-2212 and IWA-5240. All required VT-2 examinations have been completed for this fuel cycle, except for portion of SI system in Work Orders 3-06-343649-01, scheduled for week of 2/11/07 and 3-06-343646-01, scheduled for the week of 2/5/07.
- 6. Examination Category R-A includes previous Examination Categories B-F, B-J, C-F-i, and C-F-2.
- 7. Examination Category B-Q, Steam Generator Tubing, is reported per the requirements of the Plant Technical Specifications. No examinations of the steam generator tubing occurred in 2RF09.
- 8. Exam TCX-2-3i00-ISi (RHR pump 01 support) is considered as three examinations; TCX-2-3100-1i-iWS, TCX-2-3i00-i-2WS, and TCX 3i00-3WS. Revision 3 of U2 ISI Program Plan will then change the required number of examinations from 98 to 100.
- 9. Exam TCX-i -4402-8956D-INT (Cat. B-M-2) had been rescheduled to 2RFiO0 (2nd period) per the revision 2 of the IS[ Program Plan. Table 4.0 in revision 3 of the Ui ISI Program Plan will then reflect this condition, with one exam scheduled and completed during the first period.
OAR-i Page 3 of 5
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Flaw or Relevant Condition Found Examination Item Item Description Characterization During Scheduled Section XI Category Number (IWA-3300) Examination or Test (Yes or No)
D-B3 D2.10 Leaks identified on Starting Air system for Diesel Generator.
System determined to be operable. SMF 2005-000951 written. Work Orders corrected most of leakage in 2RF08, with other minor leakage addressed and corrected in 2RF09.
I I I 1 1 4 4 4 4 4 4 4 4.
4 4 4 4 4 4 4 I 4- 4. 4 I 4- t I 4 4- 4. 4
.4. 4. 4- 4 4 + 4- 4 4 4 + 4 OAR-i Page 4 of 5
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair, During Scheduled Repair/
Replacement Section XI Replacement Code or Corrective Item Description Examination or Date Plan Class Measure Description of Work Test (Yes/No) Complete Number Repair Valve Rewelded leaking body-to-bonnet seaL weld No 10/18/06 2SI06-001 OAR-i Page 5 of 5