CPSES-201001000, Operator Licensing Examination Data, Form 536 | 28 July 2010 | Operator Licensing Examination Data, Form 536 | Generic Fundamentals Examination |
CPSES-200901377, Operator Licensing Examination Data | 29 September 2009 | Operator Licensing Examination Data | Generic Fundamentals Examination |
CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. | 15 November 2007 | Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. | Safe Shutdown High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Significance Determination Process Large early release frequency Earthquake Offsite Circuit |
CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits | 22 October 2007 | Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits | Offsite Circuit |
CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments | 9 October 2007 | Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments | |
CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments | 2 October 2007 | Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments | |
CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data | 29 August 2007 | Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data | Fitness for Duty |
CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt | 28 August 2007 | Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt | Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report License Renewal Fuel cladding Environmental Justice Power Uprate Stretch Power Uprate Affidavit |
CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) | 22 August 2007 | Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) | Weld Overlay Hydrostatic Nondestructive Examination Liquid penetrant Dissimilar Metal Weld DM weld |
CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits | 16 August 2007 | Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Earthquake Fuel cladding Power change Coast down |
CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. | 16 August 2007 | License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. | Safe Shutdown Anticipated operational occurrence |
CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 | 3 August 2007 | Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 | Weld Overlay Finite Element Analysis Dissimilar Metal Weld |
CPSES-200701284, (Cpses), Operator Licensing Examination Data | 2 August 2007 | (Cpses), Operator Licensing Examination Data | Generic Fundamentals Examination |
CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses | 31 July 2007 | Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses | Loop seal Stroke time Fuel cladding |
CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 | 20 July 2007 | Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 | |
CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits | 18 July 2007 | Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits | High winds Mission time Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Condition Adverse to Quality Offsite Circuit |
CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) | 17 July 2007 | Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) | VT-2 |
CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | 21 June 2007 | Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 | 19 June 2007 | (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 | Weld Overlay |
CPSES-200701059, Submittal of Startup Report, Cycle 13 | 13 June 2007 | Submittal of Startup Report, Cycle 13 | Stroke time |
CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves | 22 May 2007 | License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves | Stroke time Tornado Missile Tornado Generated Missile Turbine Missile |
CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability | 7 May 2007 | Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability | |
CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report | 30 April 2007 | Transmittal of Year 2006 Radioactive Effluent Release Report | Offsite Dose Calculation Manual |
CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 | 27 April 2007 | Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 | |
CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change | 18 April 2007 | Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change | Safe Shutdown Incorporated by reference Fuel cladding Fire Protection Program Stolen |
CPSES-200700719, Nuclear Liability Insurance | 10 April 2007 | Nuclear Liability Insurance | |
CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report | 10 April 2007 | License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report | Shutdown Margin Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Fuel cladding Power change |
CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses | 5 April 2007 | Evaluation of Pressurizer Weld Overlay Confirmatory Analyses | Weld Overlay Dissimilar Metal Weld DM weld |
CPSES-200700691, Core Operating Limits Report, Cycle 13 | 4 April 2007 | Core Operating Limits Report, Cycle 13 | Shutdown Margin |
CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 2006 | 30 March 2007 | Transmittal of the Annual Radiological Environmental Operating Report for 2006 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
CPSES-200700607, Property Damage Insurance | 29 March 2007 | Property Damage Insurance | |
CPSES-200700606, Decommissioning Report | 29 March 2007 | Decommissioning Report | |
CPSES-200700573, Request to Withdraw Relief Request A-7 | 22 March 2007 | Request to Withdraw Relief Request A-7 | |
CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) | 19 March 2007 | Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) | |
CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | 9 March 2007 | Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data | 28 February 2007 | Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data | Fitness for Duty |
CPSES-200700451, Annual Operating Report for 2006 | 28 February 2007 | Annual Operating Report for 2006 | |
CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports | 22 February 2007 | Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports | |
CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) | 22 February 2007 | Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) | Non-Destructive Examination Weld Overlay Hydrostatic VT-2 Liquid penetrant Through-Wall Leak |
CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds | 20 February 2007 | Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds | |
CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 | 8 February 2007 | Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 | Incorporated by reference |
CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. | 2 February 2007 | Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. | Weld Overlay |
CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds | 30 January 2007 | Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds | Boric Acid Weld Overlay Nondestructive Examination Pressure Boundary Leakage |
CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power | 29 January 2007 | Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power | |
CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) | 24 January 2007 | Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) | VT-2 |
CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits | 18 January 2007 | License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits | Safe Shutdown High winds Mission time Anticipated operational occurrence Probabilistic Risk Assessment Significance Determination Process Large early release frequency Offsite Circuit |
CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators | 18 January 2007 | License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators | Safe Shutdown High winds Mission time Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Large early release frequency Offsite Circuit |
CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature | 10 January 2007 | Annual Report of Changes in Peak Cladding Temperature | |
CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. | 19 December 2006 | License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. | |
CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. | 19 December 2006 | License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. | Safe Shutdown Offsite Circuit |