Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CPSES-201001000, Operator Licensing Examination Data, Form 53628 July 2010Operator Licensing Examination Data, Form 536Generic Fundamentals Examination
CPSES-200901377, Operator Licensing Examination Data29 September 2009Operator Licensing Examination DataGeneric Fundamentals Examination
CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.15 November 2007Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.Safe Shutdown
High winds
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Significance Determination Process
Large early release frequency
Earthquake
Offsite Circuit
CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits22 October 2007Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite CircuitsOffsite Circuit
CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments9 October 2007Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments
CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2 October 2007Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments
CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data29 August 2007Transmittal of First-Half 2007 Fitness-for-Duty Program Performance DataFitness for Duty
CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt28 August 2007Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 MwtShutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
License Renewal
Fuel cladding
Environmental Justice
Power Uprate
Stretch Power Uprate
Affidavit
CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)22 August 2007Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)Weld Overlay
Hydrostatic
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
DM weld
CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits16 August 2007Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating LimitsBoric Acid
Shutdown Margin
Loop seal
Stroke time
Anticipated operational occurrence
Earthquake
Fuel cladding
Power change
Coast down
CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..16 August 2007License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..Safe Shutdown
Anticipated operational occurrence
CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20083 August 2007Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008Weld Overlay
Finite Element Analysis
Dissimilar Metal Weld
CPSES-200701284, (Cpses), Operator Licensing Examination Data2 August 2007(Cpses), Operator Licensing Examination DataGeneric Fundamentals Examination
CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses31 July 2007Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA AnalysesLoop seal
Stroke time
Fuel cladding
CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 720 July 2007Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7
CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits18 July 2007Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite CircuitsHigh winds
Mission time
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Condition Adverse to Quality
Offsite Circuit
CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)17 July 2007Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)VT-2
CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.21 June 2007Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-00919 June 2007(Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009Weld Overlay
CPSES-200701059, Submittal of Startup Report, Cycle 1313 June 2007Submittal of Startup Report, Cycle 13Stroke time
CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves22 May 2007License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control ValvesStroke time
Tornado Missile
Tornado Generated Missile
Turbine Missile
CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability7 May 2007Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability
CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report30 April 2007Transmittal of Year 2006 Radioactive Effluent Release ReportOffsite Dose Calculation Manual
CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 200627 April 2007Submittal of the Annual Non-Radiological Environmental Operating Report for 2006
CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change18 April 2007Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name ChangeSafe Shutdown
Incorporated by reference
Fuel cladding
Fire Protection Program
Stolen
CPSES-200700719, Nuclear Liability Insurance10 April 2007Nuclear Liability Insurance
CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report10 April 2007License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits ReportShutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Fuel cladding
Power change
CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses5 April 2007Evaluation of Pressurizer Weld Overlay Confirmatory AnalysesWeld Overlay
Dissimilar Metal Weld
DM weld
CPSES-200700691, Core Operating Limits Report, Cycle 134 April 2007Core Operating Limits Report, Cycle 13Shutdown Margin
CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 200630 March 2007Transmittal of the Annual Radiological Environmental Operating Report for 2006Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
CPSES-200700607, Property Damage Insurance29 March 2007Property Damage Insurance
CPSES-200700606, Decommissioning Report29 March 2007Decommissioning Report
CPSES-200700573, Request to Withdraw Relief Request A-722 March 2007Request to Withdraw Relief Request A-7
CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)19 March 2007Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)
CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.9 March 2007Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data28 February 2007Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance DataFitness for Duty
CPSES-200700451, Annual Operating Report for 200628 February 2007Annual Operating Report for 2006
CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports22 February 2007Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports
CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)22 February 2007Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)Non-Destructive Examination
Weld Overlay
Hydrostatic
VT-2
Liquid penetrant
Through-Wall Leak
CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds20 February 2007Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds
CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20068 February 2007Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006Incorporated by reference
CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2 February 2007Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..Weld Overlay
CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds30 January 2007Inspection and Mitigation of Alloy 82/182 Pressurizer Butt WeldsBoric Acid
Weld Overlay
Nondestructive Examination
Pressure Boundary Leakage
CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power29 January 2007Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)24 January 2007Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)VT-2
CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits18 January 2007License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite CircuitsSafe Shutdown
High winds
Mission time
Anticipated operational occurrence
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Offsite Circuit
CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators18 January 2007License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel GeneratorsSafe Shutdown
High winds
Mission time
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Offsite Circuit
CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature10 January 2007Annual Report of Changes in Peak Cladding Temperature
CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.19 December 2006License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.
CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.19 December 2006License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.Safe Shutdown
Offsite Circuit