CPSES-200700573, Request to Withdraw Relief Request A-7
| ML070880733 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/22/2007 |
| From: | Blevins M, Flores R TXU Generation Co, LP, TXU Power |
| To: | Document Control Desk, NRC/NRR/ADRO |
| References | |
| 10010, CPSES-200700573, TXX-06053, TXX-07066 | |
| Download: ML070880733 (2) | |
Text
ow TXU "4k"4 Power TXU P*sMr Conwhm Peak Slteamn ecftife Station P-O Box 1l100 (E01)
GiLn Rose-TX 76043 Telt 254 897 5209 Fa: 254 897 6652 mnebýLei@mxbuLcorm Mike Blevins Senior Vice President &
Chief Nuclear Officer Ref: 10CFR50.55 CPSES-200700573 Log # TXX-07066 File#
10010 March 22, 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
REQUEST TO WITHDRAW RELIEF REQUEST A-7 REF:
Letter TXX-06053, "RELIEF REQUEST A-7 TO THE UNIT 1 INSERVICE INSPECTION (ISI) PROGRAM PLAN FROM THE 1998 EDITION OF ASME CODE, SECTION XI, THROUGH 2000 ADDENDA (INTERVAL START DATE - AUGUST 13, 2000, SECOND INTERVAL)" from Mike Blevins to USNRC, dated May 18, 2006.
Dear Sir or Madam:
TXU Power requests to withdraw the relief request submitted in the referenced letter.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Jack C. Hicks at 254-897-6725.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project e Wolf Creek 4c47
TXX-07066 Page 2 of 2 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By: :Z" JO)
Rafaealores Site Vice President RAS c -