Category:Letter type:CNRO
MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00021, Confirmatory Order - Action H2015-11-0303 November 2015 Confirmatory Order - Action H CNRO-2015-00020, ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance2015-09-23023 September 2015 ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00003, RBS Security Confirmatory Order - Action C2015-02-0505 February 2015 RBS Security Confirmatory Order - Action C CNRO-2015-00007, ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments2015-01-30030 January 2015 ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00011, Notice Regarding Renewal of Lease2013-12-0303 December 2013 Notice Regarding Renewal of Lease CNRO-2013-00009, Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc2013-06-20020 June 2013 Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments 2022-05-26
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20091M3632020-03-31031 March 2020 Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. ML19072A2812019-03-13013 March 2019 Supplement 1 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-12-20020 December 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47918, Removal of the Table of Contents from the Technical Specifications2018-11-29029 November 2018 Removal of the Table of Contents from the Technical Specifications GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-18018 October 2018 Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 RBG-47883, Amendment 1 to License Renewal Application2018-08-0202 August 2018 Amendment 1 to License Renewal Application RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-10010 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-06-0707 June 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00008, (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-04-27027 April 2018 (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves2018-04-0202 April 2018 License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves RBG-47848, License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement2018-03-22022 March 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47830, License Renewal Application Update - Neutron Absorbing Material Monitoring Program2018-02-15015 February 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program RBG-47823, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling2018-01-29029 January 2018 Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-11-0303 November 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments RBG-47735, License Renewal Application - Appendices a Through D2017-05-31031 May 2017 License Renewal Application - Appendices a Through D ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application ML17153A2852017-05-25025 May 2017 License Renewal Application CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass2016-12-29029 December 2016 License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..2016-10-26026 October 2016 Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. GNRO-2016/00034, License Renewal Documents to Support Review of Application for Renewal2016-10-10010 October 2016 License Renewal Documents to Support Review of Application for Renewal RBG-47630, Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 12015-12-0303 December 2015 Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 1 GNRO-2015/00087, Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By..2015-12-0202 December 2015 Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By.. 2023-07-27
[Table view] Category:Technical Specification
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML18128A0522018-04-30030 April 2018 License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Evaluation of Proposed Changes ML18128A0532018-04-25025 April 2018 License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Radiological Effluent EAL Threshold Values, EP-CALC-RBS-1801, Rev. 0 GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RBG-47775, Revisions to the Technical Requirements Manual and the Technical Specification Bases2017-07-20020 July 2017 Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47605, Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation.2015-08-20020 August 2015 Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases2015-08-11011 August 2015 Revisions to the Technical Requirements Manual and the Technical Specifications Bases GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2014/00050, Correction of Technical Specification Typographical Error2014-07-31031 July 2014 Correction of Technical Specification Typographical Error RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update RBG-47300, Changes to Technical Specification 3.8.1; AC Sources - Operating2012-10-26026 October 2012 Changes to Technical Specification 3.8.1; AC Sources - Operating ML12277A0812012-10-0202 October 2012 Proposed Techincal Specification Changes 2023-07-27
[Table view] Category:Bases Change
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes ML18128A0522018-04-30030 April 2018 License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Evaluation of Proposed Changes ML18128A0532018-04-25025 April 2018 License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Radiological Effluent EAL Threshold Values, EP-CALC-RBS-1801, Rev. 0 GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals RBG-47775, Revisions to the Technical Requirements Manual and the Technical Specification Bases2017-07-20020 July 2017 Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases2015-08-11011 August 2015 Revisions to the Technical Requirements Manual and the Technical Specifications Bases GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update RBG-47300, Changes to Technical Specification 3.8.1; AC Sources - Operating2012-10-26026 October 2012 Changes to Technical Specification 3.8.1; AC Sources - Operating RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2011-08-0303 August 2011 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For....2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.... RBG-47146, Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance for Non Technical Specification Barrier Degradation.2011-06-10010 June 2011 Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance for Non Technical Specification Barrier Degradation. GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1019301002010-07-12012 July 2010 Bases Markups Related to License Amendment Request to Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 RBG-46985, Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles2009-12-0808 December 2009 Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 2023-07-27
[Table view] |
Text
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing 10 CFR 50.90 CNRO-2020-00009 February 26, 2020 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Application to Revise Technical Specifications to Adopt TSTF-501 "Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control,"
Revision 1 Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47
References:
- 1) Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications (STS) Change Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control"
- 2) U. S. Nuclear Regulatory Commission (NRC) Letter to TSTF, dated April 3, 2014, "Identification and Resolution of Issues Regarding Plant-Specific Adoption of Traveler TSTF-501, Revision 1, 'Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control' "
In accordance with Title 10 of the Code of Federal Regulations (CFR) Part 50, Section 50.90, "Application for amendment of license, construction permit, or early site permit," Entergy Operations, Inc. (Entergy) is submitting a request for an amendment to Renewed Facility Operating License, Appendix A, "Technical Specifications" (TS) for Grand Gulf Nuclear Station, Unit 1 (GGNS); and River Bend Station, Unit 1 (RBS).
CNRO-2020-00009 Page 2 of 3 Entergy proposes to adopt Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" (Reference 1) into the GGNS and RBS TS.
The proposed changes revise GGNS and RBS TS 3.8.3, "Diesel Fuel Oil, Lube Oil, and Starting Air" by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TS and placing them in the TS Bases so that they may be modified under licensee control. The TS are also revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator at GGNS and RBS. Corresponding Surveillance Requirements (SR) and TS Bases are also revised to reflect the above changes.
The proposed changes are consistent with TSTF-501, Revision 1. The availability of this TS improvement was announced in the Federal Register on May 26, 2010 (75 FR 2595881) as part of the consolidated line item improvement process (CLIIP).
The Enclosure to this letter provides a description and assessment of the proposed changes. Attachments 1.a and 1.b provide the existing TS pages for GGNS and RBS, respectively, marked-up to show the proposed changes. Attachments 2.a and 2.b provide revised (clean) TS pages. Attachments 3.a and 3.b provide, for information only, marked-up versions of existing TS Bases pages that reflect the proposed changes. provides a list of regulatory commitments which are based on an NRC letter to the TSTF dated April 14, 2014 (Reference 2), regarding issues associated with plant-specific adoption of TSTF-501, Revision 1.
In accordance with 10 CFR 50.91, Entergy is providing notification of this LAR by transmitting a copy of this letter and enclosure to the designated State Officials.
Approval of the proposed amendment is requested by March 29, 2021. Once approved, the amendment shall be implemented within 90 days.
CNRO-2020-00009 Page 3 of 3 If there are any questions or if additional information is needed, please contact Ron Gaston, Director, Nuclear Licensing at (601) 368-5138.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 26, 2020.
Sincerely, Ron Gaston RWG/jls
Enclosure:
Evaluation of the Proposed Change Attachments to
Enclosure:
1.a. Markup of Technical Specification (TS) Pages - Grand Gulf Nuclear Station, Unit 1 1.b. Markup of Technical Specification (TS) Pages - River Bend Station, Unit 1 2.a. Clean Technical Specification (TS) Pages - Grand Gulf Nuclear Station, Unit 1 2.b. Clean Technical Specification (TS) Pages - River Bend Station, Unit 1 3.a. Markup of Technical Specification (TS) Bases Pages - For Information Only-Grand Gulf Nuclear Station, Unit 1 3.b. Markup of Technical Specification (TS) Bases Pages - For Information Only- River Bend Station, Unit 1
- 4. List of Regulatory Commitments cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector - River Bend Station, Unit 1 NRC Project Manager - Entergy Fleet State Health Officer, Mississippi Department of Health Louisiana of Department of Environmental Quality
Enclosure to CNRO-2020-00009 Evaluation of the Proposed Change Application to Revise Technical Specifications to Adopt TSTF-501 "Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control," Revision 1 Grand Gulf Nuclear Station, Unit 1 River Bend Station, Unit 1 (6 Pages) 1.0 Description 2.0 Proposed Changes 3.0 Background 4.0 Technical Analysis 4.1 Applicability of Published Safety Evaluation 4.2 Variations 5.0 Regulatory Safety Analysis 5.1 No Significant Hazards Determination 5.2 Applicable Regulatory Requirements/Criteria 5.3 Conclusions 6.0 Environmental Consideration 7.0 References
Enclosure to CNRO-2020-00009 Page 1 of 6 EVALUATION OF THE PROPOSED CHANGE
1.0 DESCRIPTION
Entergy Operations, Inc. (Entergy) requests adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" (Reference 7.1), which is an U.S. Nuclear Regulatory Commission (NRC)-approved change to the Improved Standard Technical Specifications (ISTS), into the Grand Gulf Nuclear Station, Unit 1 (GGNS), and River Bend Station, Unit 1 (RBS)
Technical Specifications (TS).
The proposed changes revise GGNS and RBS TS 3.8.3, "Diesel Fuel Oil, Lube Oil, and Starting Air," by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TS and placing them in the TS Bases so that they may be modified under licensee control.
The TS are also revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator at GGNS and RBS.
Corresponding Surveillance Requirements (SR) and TS Bases are also revised to reflect the above changes.
2.0 PROPOSED CHANGE
S Specifically, the proposed changes modify GGNS and RBS TS 3.8.3, "Diesel Fuel Oil, Lube Oil, and Starting Air;" as described below Condition A in the Action Table is revised. Currently, Condition A is entered when the stored diesel fuel oil numerical volume requirement is not met. As discussed in the current TS Bases, the numerical volume requirements for GGNS and RBS are based on volumes less than a 7-day supply, but greater than a 6-day supply. The proposed TS revision incorporates the volumetric requirements from the TS into the TS Bases. In addition, the GGNS and RBS TS are revised so that Condition A is entered when the stored diesel fuel oil inventory is less than a 7-day supply, but greater than a 6-day supply.
Condition B in the Action Table for GGNS and RBS is revised. Currently, Condition B is entered when the stored lube oil numerical volume requirement is not met. As discussed in the current TS Bases, the numerical volume requirements are based on volumes less than a 7-day supply, but greater than a 6-day supply. The revision incorporates the volumetric requirements from the TS into the TS Bases.
The TS are revised such that Condition A is entered when the stored lube oil inventory is less than a 7-day supply, but greater than a 6-day supply.
SR 3.8.3.1 is revised. Currently, SR 3.8.3.1 verifies that the stored diesel fuel oil numerical volume requirements are met. As discussed in the current TS Bases, the numerical volume requirements of SR 3.8.3.1 are based on maintaining at least a 7-day supply. The revision incorporates the volumetric requirements from the TS into the TS Bases. The TS are modified so that SR 3.8.3.1 verifies that the stored
Enclosure to CNRO-2020-00009 Page 2 of 6 diesel fuel oil inventory is greater than or equal to a 7-day supply for each diesel generator at GGNS and RBS.
SR 3.8.3.2 is revised. Currently, SR 3.8.3.2 verifies that the stored lube oil numerical volume requirements are met. As discussed in the current TS Bases, the numerical volume requirements of SR 3.8.3.2 are based on maintaining at least a 7-day supply. The revision incorporates the volumetric requirements from the TS into the TS Bases. The TS are modified so that SR 3.8.3.2 verifies that the stored lube oil inventory is greater than or equal to a 7-day supply for each diesel generator at GGNS and RBS.
Proposed revisions to the TS Bases are also included in this application, for information only.
Adoption of the TS Bases associated with TSTF Traveler-501, Revision 1 is an integral part of implementing this TS amendment. The changes to the affected TS Bases pages will be incorporated in accordance with the TS Bases Control Program upon approval of the license amendment.
The reference to Appendix B of ANSI N195-1976, "Fuel Oil Systems for Standby Diesel-Generators," in the GGNS and RBS TS Bases is deleted. As a result, the only reference will be to ANSI N195-1976.
The proposed TS and TS Bases changes are consistent with NRC-approved Revision 1 to TSTF-501. The availability of this TS improvement was announced in the Federal Register on May 26, 2010 (75 FR 2595881) as part of the consolidated line item improvement process (CLIIP).
3.0 BACKGROUND
The background for this application is addressed by the model safety evaluation referenced in the NRCs Notice of Availability published on May 26, 2010 (75 FR 2595881) and TSTF-501, Revision 1.
4.0 TECHNICAL ANALYSIS
4.1 Applicability of Published Safety Evaluation Entergy has reviewed the NRC Safety Evaluation (SE) for TSTF-501, Revision 1. This included a review of the NRC SE, as well as the information provided in TSTF-501. Entergy has concluded that the justifications presented in TSFT-501 and the NRC SE are applicable to GGNS and RBS and justify this amendment for the incorporation in the changes to each plant's TS.
Additionally, Entergy has reviewed the April 3, 2014 NRC letter to the TSTF (Reference 7.2) regarding the resolution of issues related to the plant-specific adoption of TSTF-501. In that implementation of TSTF-501 relies on the use of an NRC-approved diesel generator fuel oil calculation methodology to determine the run-duration equivalent diesel fuel oil volume, the
Enclosure to CNRO-2020-00009 Page 3 of 6 NRC determined that the NRC-approved calculation methodology must be described in the Final Safety Analysis Report (FSAR).
Accordingly, Entergy is providing a regulatory commitment to verify that the FSARs for GGNS and RBS describe, in a level of detail consistent with that specified in Reference 7.2, the NRC-approved calculation methodology for diesel generator fuel oil volumes necessary to ensure run-duration requirements, and to include any resulting revisions in the next FSAR update following NRC issuance of the requested license amendment.
4.2 Variations Entergy is not proposing any variations from the TS changes described in TSTF-501, or the applicable parts of the NRC SE dated May 26, 2010 for GGNS and RBS.
5.0 REGULATORY EVALUATION
5.1 No Significant Hazards Consideration Analysis Entergy Operations Inc. (Entergy) proposes changes to the Technical Specifications (TS) for Grand Gulf Nuclear Station, Unit 1 (GGNS) and River Bend Station, Unit1 (RBS). The proposed changes would adopt U. S. Nuclear Regulatory Commission (NRC)-approved Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control."
The proposed changes revise TS by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TS and incorporating them into the TS Bases so that it may be modified under licensee control. The current diesel fuel oil and lube oil numerical volume requirements are based on a 7-day supply for GGNS and RBS. The TS are modified so that the stored diesel fuel oil and lube oil inventory will require that a 7-day diesel fuel oil and lube supply be available at GGNS and RBS.
Entergy has evaluated the proposed changes to the TS using the criteria in 10 CFR 50.92, "Issuance of Amendment," and has determined that the proposed changes do not involve a significant hazards consideration, as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed changes remove the volume of diesel fuel oil and lube oil required to support 7-day operation of each diesel generator at GGNS and RBS and places them under licensee control.
The specific volume of fuel oil equivalent to a 7-day and 6-day supply for GGNS and RBS are calculated using the NRC-approved methodology described in Regulatory Guide 1.137, Revision 1, "Fuel-Oil Systems for Standby Diesel Generators," and ANSI N195-1976, "Fuel Oil Systems for Standby Diesel Generators." The specific volume of lube oil equivalent to a
Enclosure to CNRO-2020-00009 Page 4 of 6 7-day and 6-day supply is based on the diesel generator manufacturer's consumption values for the run-time of the diesel generators.
Because the requirement to maintain a 7-day supply of diesel fuel oil and lube oil at GGNS and RBS is not changed and is consistent with the assumptions of the accident analyses for each unit, and the actions taken when the volume of fuel oil and lube oil are less than a 6-day supply have not changed, neither the probability nor consequences of any accident previously evaluated will be affected.
Therefore, these changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No These changes do not involve a physical alteration of the plants (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. These changes do not alter assumptions made in the safety analysis but ensures that each diesel generator operates as assumed in the accident analysis. The proposed changes are consistent with the safety analysis assumptions. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore, these changes do not create the possibility of a new or different kind of accident from an accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed changes revise the TS by removing the current stored diesel fuel oil numerical volume requirements from the TS and replacing them with diesel operating time requirements. The numerical values will be placed in the TS Bases so that they may be modified under licensee control. As the bases for the existing limits on diesel fuel oil, and lube oil are not changed, no change is made to the accident analysis assumptions and no margin of safety is reduced as part of these changes. Therefore, the proposed change does not involve a significant reduction in a margin of safety. Therefore, these changes do not involve a significant reduction in a margin of safety.
Based upon the reasoning presented above, Entergy concludes that the requested changes involve no significant hazards consideration, as set forth in 10 CFR 50.92(c), Issuance of Amendment."
Enclosure to CNRO-2020-00009 Page 5 of 6 5.2 Applicable Regulatory Requirement/Criteria A description of the proposed TS changes and the relationship to applicable regulatory requirements were published in the Federal Register Notice of Availability on May 26, 2010 (75 FR 2595881). Entergy has reviewed the NRC staffs model SE referenced in the Consolidated Line Item Improvement Process (CLIIP) Notice of Availability and concluded that the regulatory evaluation section is applicable to GGNS and RBS.
5.3 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20, and would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
Enclosure to CNRO-2020-00009 Page 6 of 6
7.0 REFERENCES
7.1 Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications (STS) Change Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" (ADAMS Accession No. ML100850094) 7.2. USNRC Letter to Technical Specifications Task Force (TSTF), dated April 3, 2014, Identification and Resolution of Issues Regarding Plant-Specific Adoption of Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" (ADAMS Accession No. ML14084A512)
ATTACHMENTS Attachments to
Enclosure:
1.a. Markup of Technical Specification (TS) Pages - Grand Gulf Nuclear Station, Unit 1 1.b. Markup of Technical Specification (TS) Pages - River Bend Station, Unit 1 2.a. Clean Technical Specification (TS) Pages - Grand Gulf Nuclear Station, Unit 1 2.b. Clean Technical Specification (TS) Pages - River Bend Station, Unit 1 3.a. Markup of Technical Specification (TS) Bases Pages - For Information Only - Grand Gulf Nuclear Station, Unit 1 3.b. Markup of Technical Specification (TS) Bases Pages - For Information Only - River Bend Station, Unit 1
- 4. List of Regulatory Commitments
Enclosure, Attachment 1.a CNRO-2020-00009 Grand Gulf Nuclear Station Unit 1 (GGNS)
GGNS TS Pages 3.8-22 3.8-24
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY: When associated DG is required to be OPERABLE.
ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each DG.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> fuel oil level less than a within limits.
7 day supply and greater than a 6 day supply.:
- 1. For DG 11 or 12,
< 68,744 gal and 59,173 gal; and
- 2. For DG 13,
< 44,616 gal and 38,280 gal.
B. One or more DGs with B.1 Restore lube oil inventory 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory less to within limits.
than a 7 day supply.:
- 1. For DG 11 or 12,
< 410 gal and 350 gal; and
- 2. For DG 13, < 202 gal and 173 gal.
(continued)
GRAND GULF 3.8-22 Amendment No. 147, 149
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains > a 7 day In accordance with supply of fuel.: the Surveillance Frequency Control
- a. 68,744 gal of fuel for DGs 11 and 12; and Program
- b. 44,616 gal of fuel for DG 13.
SR 3.8.3.2 Verify lube oil inventory is > a 7 day supply.: In accordance with the Surveillance
- a. 410 gal for DGs 11 and 12; and Frequency Control Program
- b. 202 gal for DG 13.
SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance with tested in accordance with, and maintained within the the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each required DG air start receiver pressure is: In accordance with the Surveillance
- a. 160 psig for DGs 11 and 12; and Frequency Control Program
- b. 175 psig for DG 13.
SR 3.8.3.5 Check for and remove accumulated water from each In accordance with fuel oil storage tank. the Surveillance Frequency Control Program (continued)
GRAND GULF 3.8-24 Amendment No. 147, 149, 219 Next page is 3.8-26
Enclosure, Attachment 1.b CNRO-2020-00009 Proposed Technical Specification (mark-up)
River Bend Station, Unit 1 (RBS)
RBS TS Pages 3.8-21 3.8-23
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY: When associated DG is required to be OPERABLE.
ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each DG.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> fuel oil level < 45,495 within limits.
gal and 38,996 gal.
less than a 7 day supply and greater than a 6 day supply.
B. One or more DGs with B.1 Restore lube oil inventory 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory less to within limits.
than a 7 day supply and greater than a 6 day supply.:
- 1. For DG 1A or 12B
< 367 gal and 350 gal, and
- 2. For DG 1C,
< 295 gal and 265 gal.
C. One or more DGs with C.1 Restore fuel oil total 7 days stored fuel oil total particulates to within limit.
particulates not within limit.
(continued)
RIVER BEND 3.8-21 Amendment No. 81,
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains a 7 day In accordance supply of fuel.45,495 gal of fuel. with the Surveillance Frequency Control Program SR 3.8.3.2 Verify lube oil inventory is a 7 day supply.: In accordance with the
- a. 367 gal for DGs 1A and 1B; and Surveillance Frequency
- b. 295 gal for DG 1C. Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil In accordance are tested in accordance with, and maintained with the Diesel within the limits of, the Diesel Fuel Oil Testing Fuel Oil Testing Program. Program SR 3.8.3.4 Verify each DG air start receiver pressure is: In accordance with the
- a. 160 psig for DGs 1A and 1B; and Surveillance Frequency
- b. 200 psig for DG 1C. Control Program SR 3.8.3.5 Check for and remove accumulated water from In accordance each fuel oil storage tank. with the Surveillance Frequency Control Program RIVER BEND 3.8-23 Amendment No. 81 91, 160, 196,
Enclosure, Attachment 2.a CNRO-2020-00009 Revised (clean) Technical Specification Pages Grand Gulf Nuclear Station Unit 1 (GGNS)
GGNS TS Pages 3.8-22 3.8-24
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY: When associated DG is required to be OPERABLE.
ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each DG.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> fuel oil level less than a within limits.
7 day supply and greater than a 6 day supply.
B. One or more DGs with B.1 Restore lube oil inventory 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory less to within limits.
than a 7 day supply.
(continued)
GRAND GULF 3.8-22 Amendment No. 147, 149
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains > a 7 day In accordance with supply of fuel. the Surveillance Frequency Control Program SR 3.8.3.2 Verify lube oil inventory is > a 7 day supply. In accordance with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance with tested in accordance with, and maintained within the the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each required DG air start receiver pressure is: In accordance with the Surveillance
- a. 160 psig for DGs 11 and 12; and Frequency Control Program
- b. 175 psig for DG 13.
SR 3.8.3.5 Check for and remove accumulated water from each In accordance with fuel oil storage tank. the Surveillance Frequency Control Program (continued)
GRAND GULF 3.8-24 Amendment No. 147, 149, 219 Next page is 3.8-26
Enclosure, Attachment 2.b CNRO-2020-00009 Revised (clean) Technical Specification Pages River Bend Station, Unit 1 (RBS)
RBS TS Pages 3.8-21 3.8-23
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY: When associated DG is required to be OPERABLE.
ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each DG.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> fuel oil level less than a within limits.
7 day supply and greater than a 6 day supply.
B. One or more DGs with B.1 Restore lube oil inventory 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory less to within limits.
than a 7 day supply and greater than a 6 day supply.
C. One or more DGs with C.1 Restore fuel oil total 7 days stored fuel oil total particulates to within limit.
particulates not within limit.
(continued)
RIVER BEND 3.8-21 Amendment No. 81,
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains a 7day In accordance supply of fuel. with the Surveillance Frequency Control Program SR 3.8.3.2 Verify lube oil inventory is a 7 day supply. In accordance with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil In accordance are tested in accordance with, and maintained with the Diesel within the limits of, the Diesel Fuel Oil Testing Fuel Oil Testing Program. Program SR 3.8.3.4 Verify each DG air start receiver pressure is: In accordance with the
- a. 160 psig for DGs 1A and 1B; and Surveillance Frequency
- b. 200 psig for DC 1C. Control Program SR 3.8.3.5 Check for and remove accumulated water from In accordance each fuel oil storage tank. with the Surveillance Frequency Control Program RIVER BEND 3.8-23 Amendment No. 81 91, 160, 196,
Enclosure, Attachment 3.a CNRO-2020-00009 Proposed Technical Specification Bases Changes (mark-up)
For Information Only Grand Gulf Nuclear Station, Unit 1 (GGNS)
GGNS TS Bases Pages B 3.8-44 B 3.8-46 B 3.8-49
Insert 1 (GGNS TS Bases 3.8.3, page B 3.8-44)
The fuel oil level equivalent to a 6 day supply for DG 11 or DG 12 is 59,173 gallons and for DG 13 is 38,280 gallons.
Insert 2 (GGNS TS Bases 3.8.3, page B 3.8-44)
The lube oil equivalent to a 6 day supply for DG 11 or 12 is 350 gallons and for DG 13 is 173 gallons.
Insert 3 (GGNS TS Bases 3.8.3, page B 3.8-46)
The fuel oil level equivalent to a 7 day supply for DG 11 or 12 is 68,744 gallons and for DG 13 is 44,616 gallons when calculated in accordance with References 2 and 3. The required fuel storage volume is determined using the most limiting energy content of the stored fuel. Using the known correlation of diesel fuel oil absolute specific gravity or API gravity to energy content, the required diesel generator output, and the corresponding fuel consumption rate, the onsite fuel storage volume required for 7 days of operation can be determined. SR 3.8.3.3 requires new fuel to be tested to verify that its properties are within the range assumed in the diesel fuel oil consumption calculations.
Insert 4 (GGNS TS Bases 3.8.3, page B 3.8-46)
The lube oil level equivalent to a 7 day supply for DG 11 or DG 12 is 410 gallons and for DG 13 is 173 gallons and
Enclosure, Attachment 3.b CNRO-2020-00009 Proposed Technical Specification and Bases Changes (mark-up)
For Information Only River Bend Station, Unit 1 (RBS)
RBS TS Bases Pages B 3.8-41 B 3.8-43 B 3.8-45 B 3.8-49
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air BASES and Regulatory Guide 1.137 (Ref. 2)
BACKGROUND Each diesel generator (DG) is provided with a storage tank having a fuel oil capacity sufficient to operate that DG for a period of 7 days while the DG is supplying maximum post loss of coolant accident load demand (Ref. 1). The maximum load demand is calculated using the assumption that at least two DGs are available. This onsite fuel oil capacity is sufficient to operate the DGs for longer than the time to replenish the onsite supply from outside sources.
Fuel oil is transferred from each storage tank to its respective day tank by a transfer pump associated with each storage tank. Redundancy of pumps and piping precludes the failure of one pump, or the rupture of any pipe, valve, or tank to result in the loss of more than one DG. All outside tanks, pumps, and piping are located underground. The fuel oil level in the storage tank is indicated in the control room.
For proper operation of the standby DGs, it is necessary to ensure the proper quality of the fuel oil. Regulatory Guide 1.137 (Ref. 2) addresses the recommended fuel oil practices as supplemented by ANSI N195 (Ref.
3). The fuel oil properties governed by these SRs are the water and sediment content, the kinematic viscosity, specific gravity (or API gravity),
and impurity level.
The DG lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated DG under all loading conditions.
The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each engine oil sump contains an inventory capable of supporting a minimum of 7 days of operation. This supply is sufficient to allow the operator to replenish lube oil from outside sources.
Each DG has an air start system with adequate capacity for five successive attempts on the DG without recharging the air start receiver(s).
(continued)
RIVER BEND B 3.8-41 Revision No. 3-2
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES (continued)
ACTIONS The ACTIONS are modified by a Note indicating that separate Condition entry is allowed for each DG. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable DG subsystem. Complying with the Required Actions for one inoperable DG subsystem may allow for continued operation, and subsequent inoperable DG subsystem(s) are governed by separate Condition entry and application of associated Required Actions.
Insert 1 A.1 In this Condition, the 7 day fuel oil supply for a DG is not available.
However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply. These circumstances may be caused by events such as:
- a. Full load operation required after an inadvertent start while at minimum required level; or
- b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations.
This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period.
i.e., , is not B.1 In this Condition, the 7 day With lube oil inventory less than required, sufficient lube oil to support 7 days of continuous DG operation at full load conditions may not be available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day supply. This restriction allows sufficient time for obtaining the requisite replacement volume. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration of the required volume prior to Insert 2 (continued)
RIVER BEND B 3.8-43 Revision No. 0
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS E.1 (continued)
With a Required Action and associated Completion Time not met, or the stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than addressed by Conditions A through D, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate inventory of fuel oil in the storage tanks to support each DG's operation for 7 days at maximum expected post LOCA loading. The 7 day period is sufficient time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsite location.
Insert 3 The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SR 3.8.3.2 Insert 4 This Surveillance ensures that sufficient lube oil inventory is available to support at least 7 days of maximum expected post LOCA load operation for each DG. This requirement is based on the DG manufacturer's consumption values for the run time of the DG. Implicit in this SR is the requirement to verify the capability to transfer the lube oil from its storage location to the DG when the DG lube oil sump does not hold adequate inventory for 7 days of maximum expected post LOCA load operation without the level reaching the manufacturer's recommended minimum level. Note, the LCO for diesel generators I, II, and III lube oil inventory is based on volumes in the sump while the particular diesel is running and does not include the volume that would drain back to the sump in standby conditions.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
(continued)
RIVER BEND B 3.8-45 Amendment No. 196
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES SURVEILLANCE SR 3.8.3.5 (continued)
REQUIREMENTS of the fuel oil by bacteria. Frequent checking for and removal of accumulated water minimizes fouling and provides data regarding the watertight integrity of the fuel oil system. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. This SR is for preventive maintenance. The presence of water does not necessarily represent a failure of this SR provided that accumulated water is removed during performance of the Surveillance.
REFERENCES 1. USAR, Section 9.5.4.
- 2. Regulatory Guide 1.137.
- 3. ANSI N195, Appendix B, 1976.
- 4. USAR, Chapter 6.
- 5. USAR, Chapter 15.
- 6. ASTM Standards: D4057-81; D975-81; D4176-82; D1522-79; D2622-82; D2276-78.
- 7. ASME, Boiler and Pressure Vessel Code,Section XI.
RIVER BEND B 3.8-49 Amendment No. 196
Insert 1 (RBS TS Bases 3.8.3, page B 3.8-43)
The fuel oil level equivalent to a 6 day supply for a DG is 38,996 gallons.
Insert 2 (RBS TS Bases 3.8.3, page B 3.8-43)
The lube oil equivalent to a 6 day supply for DG 1A or 1B is 350 gallons and for DG 1C is 265 gallons.
Insert 3 (RBS TS Bases 3.8.3, page B 3.8-45)
The fuel oil level equivalent to a 7 day supply for each DG is 45,495 gallons when calculated in accordance with References 2 and 3. The required fuel storage volume is determined using the most limiting energy content of the stored fuel. Using the known correlation of diesel fuel oil absolute specific gravity or API gravity to energy content, the required diesel generator output, and the corresponding fuel consumption rate, the onsite fuel storage volume required for 7 days of operation can be determined. SR 3.8.3.3 requires new fuel to be tested to verify that the absolute specific gravity or API gravity is within the range assumed in the diesel fuel oil consumption calculations.
Insert 4 (RBS TS Bases 3.8.3, page B 3.8-45)
The lube oil level equivalent to a 7 day supply for DG 1A or 1B is 367 gallons and is 265 gallons for DG 1C and
Enclosure Attachment 4 to CNRO-2020-00009 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
Type (check one)
One- Scheduled Commitment Continuing Time Completion Date Compliance Action Verify that the FSAR for GGNS describes in a level of detail consistent with that requested by Reference 2, the methodology for the calculation of the Prior to the next specific DG fuel oil volumes contained in FSAR update the diesel fuel oil storage tank(s) necessary to ensure DG run-duration following approval of the license requirements, and include any resulting amendment.
revisions in the next FSAR update following NRC issuance of the requested license amendment.
Verify that the FSAR for RBS describes in a level of detail consistent with that requested by Reference 2, the methodology for the calculation of the Prior to the next specific DG fuel oil volumes contained in FSAR update the diesel fuel oil storage tank(s) necessary to ensure DG run-duration following approval of the license requirements, and to includes any amendment.
resulting revisions in the next FSAR update following NRC issuance of the requested license amendment.