MONTHYEARML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19017A2222019-05-29029 May 2019 Letter Transmitting Draft Safety Evaluations of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition ML19028A2852019-02-21021 February 2019 Final SEs of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Transmittal Letter) TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2019-01-17017 January 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML19007A2252019-01-15015 January 2019 Letter Transmitting Final SEs of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. ML18284A3772018-12-31031 December 2018 Incorporation of Technical Specifications Task Force (TSTF) Traveler TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases, Into the Next Revision of the Standard Technical Specifications TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.2018-12-20020 December 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. 2023-09-21
[Table view] |
Text
April 3, 2014 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
IDENTIFICATION AND RESOLUTION OF ISSUES REGARDING PLANT-SPECIFIC ADOPTION OF TRAVELER TSTF-501, REVISION 1, "RELOCATE STORED FUEL OIL AND LUBE OIL VOLUME VALUES TO LICENSEE CONTROL"
Dear Members of the TSTF:
The purpose of this letter is to inform the TSTF of issues that the U.S. Nuclear Regulatory Commission (NRC) staff has recently identified during a review of a plant-specific license amendment requesting adoption of the subject Traveler.
The availability of Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control," (TSTF-501) was published in the Federal Register on May 26, 2010 [75 FR 259881]. TSTF-501 relocates the Emergency Diesel Generator (EDG) fuel oil volume and lube oil volume requirements (gallons) from the Standard Technical Specifications (STSs) to the STS Bases and the EDG run duration (days) from the STS Bases to the STS. Because the energy contained in a gallon of EDG fuel oil can vary due to the specific diesel fuel oil composition, one of the intents of the traveler was to allow a licensee to modify the relocated fuel oil volume requirement by relocating the current stored diesel fuel oil numerical volume requirements from the Technical Specification (TS) to the TS Bases. This relocation would allow the licensee to modify the fuel oil volume necessary to meet the required EDG run duration in accordance with the TS Bases Control Program.
During the NRC staff review of a recent license amendment requesting adoption of TSTF-501, it was identified that relocation of the current fuel oil volume requirements (gallons of fuel oil) from the licensee TS to the TS Bases could imply that the diesel fuel oil volume requirements remains in effect but are relocated to the TS Bases. This implication is contrary to the regulation at Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(a)(1) which states:
Each applicant for a license authorizing operation of a production or utilization facility shall include in his application proposed technical specifications in accordance with the requirements of this section. A summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application, but shall not become part of the technical specifications [emphasis added].
To resolve the issue for the license amendment request, the NRC staff revised the wording in the license amendment safety evaluation (SE) by removing all use of the word relocate, or
TSTF relocated, when used in the context of relocating a current TS requirements to the TS Bases, and replaced it with removed or removed and replaced with ... as applicable. Additionally, statements made in regard to TS Bases run duration values (days) being relocated to the TS were deleted. The NRC staff considers the revised SE wording a resolution to this issue and, therefore, a change to the Traveler as announced for availability in the Federal Register is not necessary.
During the resolution of the above TS to TS Bases relocate issue, the NRC staff further reviewed TSTF-501 for any other TS Bases requirements identified by the TSTF-501. The NRC staff noted that TSTF-501 requires the licensee to identify the NRC-approved EDG fuel oil volume calculation methodology, used to calculate the volume of fuel oil necessary to support the operation of the EDGs for the TS run duration, in the TS Bases. As stated in 10 CFR 50.36(a)(1) above, the TS Bases shall not become part of the TSs. Furthermore, 10 CFR 50.36(b) states:
Each license authorizing operation of a production or utilization facility of a type described in § 50.21 or § 50.22 will include technical specifications. The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to
§ 50.34. The Commission may include such additional technical specifications as the Commission finds appropriate.
In light of the cited 10 CFR 50.36 requirements and importance of utilizing an NRC-approved EDG fuel oil calculation methodology to determine the run-duration equivalent diesel fuel oil volume, the NRC staff has determined that the licensee must identify the NRC-approved calculation methodology in the Final Safety Analysis Report (FSAR). Therefore, current and future license amendments requesting adoption of TSTF-501 will need to provide a regulatory commitment consistent with the following to ensure an acceptable and consistent fuel oil calculation methodology is maintained.
[LICENSEE NAME] is providing a regulatory commitment to verify the inclusion or to revise the [PLANT NAME] [FSAR] with the following information and to submit the revised description with the next
[FSAR] update:
The specific Emergency Diesel Generator (EDG) fuel oil volumes contained in the diesel fuel oil storage tank(s) necessary to ensure that EDG run-duration requirements are calculated using Section 5.4 of American National Standards Institute (ANSI) N195- 1976, Fuel Oil Systems for Standby Diesel-Generators, and are based on applying the conservative assumption that the EDG is operated continuously at rated capacity. This fuel oil calculation methodology is one of the two approved methods specified in Regulatory Guide (RG) 1.137, Revision 1, Fuel Oil Systems for Standby Diesel Generators," Regulatory Position C.1.c.
TSTF Licensees using an NRC-approved fuel oil calculation methodology that differs from the above TSTF-501 described methodologies will need to verify inclusion or revise the FSAR to include a description of the methodology consistent with the level of detail identified in the above description.
It is the NRC staffs position that identification of the EDG fuel oil calculation methodology in the FSAR will provide adequate controls to future license changes, as any deviation from the NRC-approved EDG fuel oil calculation methodology that affects the EDG TS duration-based requirements described above requires the licensee to perform an evaluation pursuant to the provisions of 10 CFR 50.59 to determine whether the calculation methodology change requires prior NRC approval. Therefore, the NRC staff considers the regulatory commitment to include the EDG fuel oil calculation methodology in the FSAR a resolution to this issue and a change to TSTF-501 as announced for availability in the Federal Register is not necessary.
If you have concerns with the staff disposition of the issues related to TSTF-501 described herein, the NRC staff would consider working with the industry to resolve your concerns.
If you have any questions please contact Michelle Honcharik of my staff at 301-415-1774 or Michelle.Honcharik@nrc.gov.
Sincerely,
/Holly Cruz for RA/
Anthony J. Mendiola, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 753 cc: See next page
ML14084A512; *concurred via memo (ML14063A216) NRR-106 OFFICE PLPB/PM PLPB/LA STSB/BC* PLPB/BC NAME MHoncharik DBaxley RElliott (HCruz for)
AMendiola DATE 03/25/2014 04/03/2014 03/10/2014 04/03/2014 Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Brian Mann E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com Richard A. Loeffler Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 E-mail: richard.loeffler@xenuclear.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com