MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00021, Confirmatory Order - Action H2015-11-0303 November 2015 Confirmatory Order - Action H CNRO-2015-00020, ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance2015-09-23023 September 2015 ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00003, RBS Security Confirmatory Order - Action C2015-02-0505 February 2015 RBS Security Confirmatory Order - Action C CNRO-2015-00007, ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments2015-01-30030 January 2015 ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00009, Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc2013-06-20020 June 2013 Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2013-03-25025 March 2013 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications 2022-05-26
[Table view] |
Text
Entergy Operations, Inc.
Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, New York 10601 Tel: 914-272-3370 John F. McCann Vice President, Regulatory Assurance CNRO-2015-00021 November 3, 2015 Mr. Marc L. Dapas Regional Administrator - Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Blvd.
Arlington, TX 76011-4511
SUBJECT:
RBS Security Confirmatory Order - Action H River Bend Station Docket No. 50-458 License No. NPF-47
REFERENCE:
NRC Letter Entergy Operations, Inc., Confirmatory Order, Notice of Violation, and Civil Penalty - NRC Special Inspection Report 05000458/2014407 and NRC Investigation Report 4-2012-022 - River Bend Station, dated December 3, 2014 (ADAMS Accession No. ML14339A167)
Dear Mr. Dapas:
The referenced letter documents the Confirmatory Order and actions resulting from the Alternate Dispute Resolution (ADR) between the NRC and Entergy Operations, Inc.
pertaining to a security issue at River Bend Station (RBS). Actions to be taken by Entergy Operations, Inc. and Entergy Nuclear Operations, Inc. (collectively known as Entergy) are documented in Sections III and V of the referenced letter and further clarified in its attachment.
Action H of the Confirmatory Order states:
Within 4 months from the date of this Confirmatory Order, Entergy will prepare a presentation describing the event that formed the basis for this violation. The presentation will be delivered to the Nuclear Security Working Group and the National Nuclear Security Conference (subject to acceptance of the conference-organizing committees). This presentation will include, among other subjects, the subjects covered by the non-public Attachment to this Confirmatory Order. Prior to making the presentation, Entergy will provide its proposed presentation to the NRC for its review.
The NRC will communicate to Entergy any concerns regarding the presentation within 30 days of submittal. Entergy will deliver the presentation within 12 months of this Confirmatory Order.
Entergy developed the presentation specified in Action H and delivered it to the Nuclear Security Working Group on September 16, 2015. However, Entergy did not deliver the presentation at the National Nuclear Security Conference (NNSC), which was held the week of June 9, 2015. In order to present at the conference, the organizers required all agenda
CNRO-2015-00021 Page 2 of 2 items to be submitted by May 22. However, Entergy failed to accomplish this action in time to be considered for the conference agenda.
A distraction that contributed to this failure was an organization change within the Corporate Security department. Specifically, during the timeframe for developing and submitting the presentation to the NRC (March - April 2015), Entergy Corporate Security was conducting turnover between the outgoing and incoming Security Directors. The change management plan associated with this action did not account for the tight timeline set on the Action H due dates in relation to scheduled timing of the NNSC. In addition, the persons involved failed to adequately review the upcoming activities to ensure they were being appropriately addressed.
It wasnt until the time of the NNSC that Entergy recognized the activity to deliver the presentation to the NNSC would not be met.
Entergy is taking compensatory measures based on the inability to deliver the presentation at the NNSC. These measures involve presenting the information during the industry regional security groups periodic conference calls. The lessons-learned presentation details were communicated to the Region III, I, and IV groups on September 23, 2015, October 14, 2015, and October 21, 2015, respectively. Entergy will deliver the presentation to the Region II group on or before the current Order due date of December 3, 2015.
Because Entergy did not deliver the lessons-learned presentation at the 2015 NNSC, we are proposing to deliver it during the 2016 conference. In order to support this effort, Entergy requests the current due date for this activity be extended to September 1, 2016.
If you have any questions pertaining to the presentation, please contact Mr. Guy Davant at (601) 368-5756.
This letter contains one new commitment, which is identified in the attachment to this letter.
Sincerely, JFM/BSF/ghd
Attachment:
List of Regulatory Commitments cc: Mr. J. S. Forbes (ECH)
Mr. T. G. Mitchell (ECH)
Ms. D. Jacobs (ECH)
Mr. J. A. Kowalewski (ECH)
Mr. E. W. Olson (RBS)
Document Control Desk, USNRC
CNRO-2015-00021 bcc: Mr. J. A. Clark (RBS)
Mr. B. S. Ford (ECH)
Mr. J. Laplante (ECH)
Mr. D. J. Berkanpas (ECH)
Mr. T. Santy (ECH)
ATTACHMENT CNRO-2015-00021 LIST OF REGULATORY COMMITMENTS
Attachment to CNRO-2015-00021 Page 1 of 1 LIST OF REGULATORY COMMITMENTS This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRCs information and are not commitments.
TYPE SCHEDULED (Check one)
COMMITMENT COMPLETION DATE ONE-TIME CONTINUING (If Required)
ACTION COMPLIANCE Entergy will deliver the lessons-learned presentation to the Region II security group on 12/3/2015 or before the current Order due date of December 3, 2015.
Entergy Operations, Inc.
Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, New York 10601 Tel: 914-272-3370 John F. McCann Vice President, Regulatory Assurance CNRO-2015-00021 November 3, 2015 Mr. Marc L. Dapas Regional Administrator - Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Blvd.
Arlington, TX 76011-4511
SUBJECT:
RBS Security Confirmatory Order - Action H River Bend Station Docket No. 50-458 License No. NPF-47
REFERENCE:
NRC Letter Entergy Operations, Inc., Confirmatory Order, Notice of Violation, and Civil Penalty - NRC Special Inspection Report 05000458/2014407 and NRC Investigation Report 4-2012-022 - River Bend Station, dated December 3, 2014 (ADAMS Accession No. ML14339A167)
Dear Mr. Dapas:
The referenced letter documents the Confirmatory Order and actions resulting from the Alternate Dispute Resolution (ADR) between the NRC and Entergy Operations, Inc.
pertaining to a security issue at River Bend Station (RBS). Actions to be taken by Entergy Operations, Inc. and Entergy Nuclear Operations, Inc. (collectively known as Entergy) are documented in Sections III and V of the referenced letter and further clarified in its attachment.
Action H of the Confirmatory Order states:
Within 4 months from the date of this Confirmatory Order, Entergy will prepare a presentation describing the event that formed the basis for this violation. The presentation will be delivered to the Nuclear Security Working Group and the National Nuclear Security Conference (subject to acceptance of the conference-organizing committees). This presentation will include, among other subjects, the subjects covered by the non-public Attachment to this Confirmatory Order. Prior to making the presentation, Entergy will provide its proposed presentation to the NRC for its review.
The NRC will communicate to Entergy any concerns regarding the presentation within 30 days of submittal. Entergy will deliver the presentation within 12 months of this Confirmatory Order.
Entergy developed the presentation specified in Action H and delivered it to the Nuclear Security Working Group on September 16, 2015. However, Entergy did not deliver the presentation at the National Nuclear Security Conference (NNSC), which was held the week of June 9, 2015. In order to present at the conference, the organizers required all agenda
CNRO-2015-00021 Page 2 of 2 items to be submitted by May 22. However, Entergy failed to accomplish this action in time to be considered for the conference agenda.
A distraction that contributed to this failure was an organization change within the Corporate Security department. Specifically, during the timeframe for developing and submitting the presentation to the NRC (March - April 2015), Entergy Corporate Security was conducting turnover between the outgoing and incoming Security Directors. The change management plan associated with this action did not account for the tight timeline set on the Action H due dates in relation to scheduled timing of the NNSC. In addition, the persons involved failed to adequately review the upcoming activities to ensure they were being appropriately addressed.
It wasnt until the time of the NNSC that Entergy recognized the activity to deliver the presentation to the NNSC would not be met.
Entergy is taking compensatory measures based on the inability to deliver the presentation at the NNSC. These measures involve presenting the information during the industry regional security groups periodic conference calls. The lessons-learned presentation details were communicated to the Region III, I, and IV groups on September 23, 2015, October 14, 2015, and October 21, 2015, respectively. Entergy will deliver the presentation to the Region II group on or before the current Order due date of December 3, 2015.
Because Entergy did not deliver the lessons-learned presentation at the 2015 NNSC, we are proposing to deliver it during the 2016 conference. In order to support this effort, Entergy requests the current due date for this activity be extended to September 1, 2016.
If you have any questions pertaining to the presentation, please contact Mr. Guy Davant at (601) 368-5756.
This letter contains one new commitment, which is identified in the attachment to this letter.
Sincerely, JFM/BSF/ghd
Attachment:
List of Regulatory Commitments cc: Mr. J. S. Forbes (ECH)
Mr. T. G. Mitchell (ECH)
Ms. D. Jacobs (ECH)
Mr. J. A. Kowalewski (ECH)
Mr. E. W. Olson (RBS)
Document Control Desk, USNRC
CNRO-2015-00021 bcc: Mr. J. A. Clark (RBS)
Mr. B. S. Ford (ECH)
Mr. J. Laplante (ECH)
Mr. D. J. Berkanpas (ECH)
Mr. T. Santy (ECH)
ATTACHMENT CNRO-2015-00021 LIST OF REGULATORY COMMITMENTS
Attachment to CNRO-2015-00021 Page 1 of 1 LIST OF REGULATORY COMMITMENTS This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRCs information and are not commitments.
TYPE SCHEDULED (Check one)
COMMITMENT COMPLETION DATE ONE-TIME CONTINUING (If Required)
ACTION COMPLIANCE Entergy will deliver the lessons-learned presentation to the Region II security group on 12/3/2015 or before the current Order due date of December 3, 2015.