BECO-90-148, Forwards Revised Pages 1 & 219 of Proposed Tech Spec Change Submitted on 901108

From kanterella
(Redirected from BECO-90-148)
Jump to navigation Jump to search
Forwards Revised Pages 1 & 219 of Proposed Tech Spec Change Submitted on 901108
ML20065M936
Person / Time
Site: Pilgrim
Issue date: 12/03/1990
From: Gina Davis
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065M940 List:
References
BECO-90-148, NUDOCS 9012110260
Download: ML20065M936 (2)


Text

_._ __ . _ _ _ _ . _ _ . . _ . _ _ _ . . . . - _ -_ . _ _ . _ . . . . _ _ _ . _ . _ . - . . _ . . _ _ _ . _

10CFR50.90

. O BOSTON EOISON Pilgrim Nuclear Power Station Rocky Hdi Road Plymouth, Massachusetts o230o 1

George W. Davis sener vice President - Nuc6 ear December 3, 1990 BECo 90-148 U.S. Nuclear Regulatory Commission Document Control Desk Hashington, D.C. 20555 t

License DPR Docket 50-293 t

-MINOR REVISIONS TO PROPOSED TECHNICAL SPECIFICATION CHANGE CONCERNING FUEL PARAMETERS Boston Edison Company (BECo) submitted a proposed change to Pilgrim Nuclear

  • Power Station's (PNPS) Technical Specifications concerning fuel parameters by BECo letter 90-135 dated November 8, 1990.

The attachment to this letter consists of two pages from that submittal revised for clarity. Revision to page 1 deletes the sentence "It shall be administratively controlled by the licensee" from definition "D. Car _t ODeratina limits Reoort". The revision to page 219 deletes "...as amended" .

from the end of.section 6.9.A.4.b and substitutes "...(the approved version at the time the reload analyses are performed shall be identified in the Core-Operating Limits Report)".

These page revisions are minor and administrative in nature and are encompassed by the " Determination of No Significant Hazards Considerations" of the November 8, 1990-proposed change. Please substitute the attached pages 1 and 219 in Attachment D of the November 8,1990 letter.

H Attachment PHK/ rec /5137

?9012110260-901203 PDR. ADOCK 0500C293 PDC l p,- _,

P .

i BOSTON EDISON C' 4!PANY b.S. Nuclear Regulatory Commission Page 2 i

I cc: Mr. R. Eaton, Project Manager i Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14D1 .

U. S. Nuclear Regulatory Commission .

~

1 White Flint North  !

11555 Rockville Pike -

I Rockville, MD -20852 i

U. S. Nuclear Regulatory Commission -

Region I 475-Allendale Road King of Prussia, PA 19406 4

Senior NRC Resident Inspector Pilgrim Nuclear Power Station d Mr. Robert H. Hallisey. Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, MA 02111 1

1-8 i

4 3..

l t

i

.,0..,...,._.._.._ . .. . .,m.. ... . . _ _ . . _ . . , . , . . _ .._, , , , , , , , . , , , , . . , . _ , _ , _ ,