B16940, Forwards Revised Schedule for Completion of Commitment Re Corrective Action Plan for Training

From kanterella
Jump to navigation Jump to search
Forwards Revised Schedule for Completion of Commitment Re Corrective Action Plan for Training
ML20198A660
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/31/1997
From: Amerine D
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16940, CAL-1-97-10, NUDOCS 9801060051
Download: ML20198A660 (5)


Text

-_ _ _ _ _ _ _ .. _.

%, rerry na. (noot is6), wete, fora, er 06385

-J

  • Northeast Nuclear Energy ,%,, ,%,, p.,, s,,,,,,

Northeast Nuclear Energy Company P.o. Ikim 128 Waterfora, Cr 06385-0128 (860) 447-1791 Fax (860) 444 4277

  • na Nortleast Utilitice System December 31,1997 Docket Nos. 50 245 50-336 50-423 B16940 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstorie Nuclear Power Station, Units 1,2, and 3 Revised Schedule For A Commitment Corrective Action Plan For Trainina Reference (a): H. J. Miller and W. D. Travers, USNRC letter to B. O. Kenyon,

" Confirmatory Action Letter," dated March 7,1997 Reference (b): J. K. Thayer letter to USNRC, " Response to Initial Operator Licensing Examination Report No. 50-245/96-12," dated March 3,1997 Reference (c): J. K. Thayer letter to USNRC, "Results of Initial Review of Licertad Operators' Records," dated March 14,1997 Reference (d): J. K. Thayer letter to USNRC, " Response To Confirmatory Action Letter," dated March 31,1997 Reference (e): J. K. Thayer letter to USNRC, " Revised Corrective Action Plan for Operator Training," dated April 18,1997 Reference (f): D. B. Amerine letter to USNRC," Revised Corrective Action Plan for Operator Training," dated November 14,1997 Reference (g): D B. Amerine letter to USNRC, " Revised Schedule For A I Commitment," dated December 15,1997 I

.A hDDh)} /

j' 'lill 9801060051 971231 M - a Ill'Ill'a1l11'opi

. '1l""\lw.

H '

PDR- ADOCK 05000245 V PDR

U.S. Nucle:r Regul:tary Commission

. B18940\ Page 2 The purpose of _this letter is to prov;de our revised schedule for completion of a

. . cor6mitment that was previously submitted to the NRC. By letter dated March 7, 1997, the NRC Staff transmitted Confirmatory Action Letter 1-97-010 [ Reference (a))

regarding licensed operator training records'and programs at Millstone Station. The

, ~ letter confirmed the commitments that Northeast Nuclear Energy Company (NNECO) had made to ensure that weaknesses in the Licensed Operator Initial Training (LOIT) and Licensed Operator Upgrade Training (LOUT) programs would be corrected.

Ther ., commitments were noted in our letter dated March 3,1997 [ Reference (b)).

Sper fically, NNECO committed to complete a number of actions and to submit the results of expanded reviews by April 2.1997. The result of our initial reviews into ,

.these issues was provided in our letter dated March 14,1997 [ Reference (c)). Our

response to the commitments, including submittal of a " Corrective Action Plan For MP1 LOUT IRT Recommendations," was provided in our letter dated March 31,1997

[ Reference (d)) and as revised on April 18,1997 [ Reference (e)), November 14,1997

[ Reference (f)] and December 15,1997 [ Reference (g)). The revised corrective action plan detailed the actions to be taken with respect to the operator training programs for Millstone Units 1,2, and 3. Contained within our letter of March 31, 1997 was a commitment to complete the corrective actions by their associated due dates as noted in the Corrective Action Plan.

One of the commitments has been revised as follows:

Oriainal Commitment ES-Sa The ES 5 recommendation will be complete when corrective actions for weaknesses identified in "Self Assessment and Corrective Action Programs" have been completed (4.2.3A-4.2.3E).

Due Date: 1?J15/97 Bevised Commitment ES-Sa ' The ES-5 recommendation will be complete when corrective actions for weaknesses identified in "Self Assessment and Corrective Action Programs" have been completed (4.2.3A-4.2.3E).

Due Date: 2/28/98

l - U.S. Nuclxr Regul: tory Commiss:on B16940\ Page 3 Justification The ES-SA commitment is a rollup activity that was originally tied to SC-E-4 (due December 31,1997). With the addition of commitment SC-E-4a (due February 28, 1998) as revised in our December 15,1997 letter [ Reference (g)], the due date of the above commitment (ES-5A) should have been revised to coincide with the due date for the new commitment (SC-E-4a). The fact that the ES-Sa due date was not changed with the addition of the new commitment is an administrutWe oversight. Our intention was and still is to consider the f ollup activity complete when all of the supporting activities in "Self Assessment and Corrective Action Programs" are complete These activities are scheduled for completion on February 28,1998.

The revised commitment is provided in Attachment 1. The remaining commitments in our letters of November 14,1997 and December 15,1997 are unchanged.

Should you have any questions regarding this matter, please contact Mr. R. W.

Flanagan at (860) 437-5817.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/ 41th. rc w David B. Ameri6e, Vic6 President V Nuclear Engineering and Support Services Attachments (1) cc: H. J. Miller, Region I Administrator G. W. Meyer, Chief of Operator Licensing, NRC Region I F. J. Miraglia, Deputy Director, NRR W. D. Travers, Ph.D., Director, Special Projects Office W. D. Lanning, Deputy Director, inspections, Special Projects Office P. F. McKee, Deputy Director, Licensing and Oversight, Special Projects Office J. P. Durr, Branch Chief inspections, Special Projects Office S. Dembek, NRC Project Manager, Millstone Unit 1 T. A. Eastick, Senior Resident inspector, Millstone Unit 1 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit 2 J. W. Andersen, NRC Project Manager, Millstone Unit 3 A. C. Cerne, Senior Resident inspector, Millstone Unit 3 l

___j

Docket Nos. 50 245

- 50-336 50-423 B16940 1

Attachment 1 Millstone Nuclear Power Station, Units 1,2 anci 3 Revised Schedule For A Commitment Corrective Action Plan For Train:na December 1997

, U.S. Nuclacr Regulatory Commission B16940 \ Attachment 1 \ Page.1

. Enclosu'e List of Regulatory Commitments The following table identifies those actions committed to- by NNECO in this document. Please notify the Director, Regulato.y Affairs at the Millstone Nuclear ,

Power Station of any questions regarding this document or any associated regulatory i

- commitments.

Number Commitment Due ,

B16811 The ES-5 recommendation will be complete February 28, (Attachment 1, when corrective actions for weaknesses 1998 i- Page 2) identified in 'Self Assessment and Corrective Action Programs" have been completed (4.2.3A-4.2.3E).