B13222, Forwards Fire Hazard Analysis & 10CFR50,App R,Compliance Review

From kanterella
Jump to navigation Jump to search
Forwards Fire Hazard Analysis & 10CFR50,App R,Compliance Review
ML20245E823
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/28/1989
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245E828 List:
References
B13222, NUDOCS 8905020160
Download: ML20245E823 (2)


Text

.__ _

j f' ; .

l g ,

\

N UTILPFIES conor.i Omc.. . seio n sir..t e.riin. Conn.ciicut 1 9 .isna .us.cmsmi nuciam"'*"

P.O. BOX 270 I .< nom ..na ro.ia caea"'

HARTFORD. CONNECTICUT 06141-0270 k ' J a $NEvco,E (203) 665-5000 l.

1

April 28, 1989

]

Docket No. 50-213 B13222 j Re: 10CFR50, Appendix R ISAP Topic 1.14 a

U.S. Nuclear Regulatory Commission Attention: Document Control Desk l Washington, DC 20555 l

j Gentlemen: y 1

Haddam Neck Plant F 10CFR50, Appendix R, Compliance Review i Fire Hazard Analysis i

l The Connecticut Yankee Atomic Power Company (CYAPC0) hereby submits the I enclosed shutdown system availability and fire protection evaluation for the j Haddam Neck Plant entitled, " Connecticut Yankee Atomic Power Company,10CFR50, Appendix R, Compliance Review," and " Connecticut Yankee Atomic Power Company, Fire Hazard Analysis." These documents delineate the Haddam Neck Plant's l- shutdown system availability in the event of a fire and fire area evaluations.

I In a letter dated August 25, 1986,(I) the NRC granted CYAPC0 a schedular

.!- exemption from 10CFR50.48. This exemption extended CYAPC0's commitment to

' comply with the requirements of 10CFR50, Appendix R, until start-up from the l Cycle 15 refueling outage. In responding to acnieve compliance with 10CFR50, '

j Appendix R, CYAPC0 is constructing a new switchgear building in order to resolve a number of Appendix R issues. This new building and associated new i equipment will be operational prior to start-up from the Cycle 15 outage. The

! enclosed Appendix R Compliance Review addresses CYAPCO's compliance to Appen-

! dix R, crediting the new switchgear building as of the start-up from Cycle 15.

The Fire Hazard Analysis provides a current evaluation of plant fire areas and will be revised to include the new switchgear building after the ISB9 refuel-

! ing outage. '

l &Db

'l (1) H. R. Denton letter to J. F. Opeka, " Fire Protection Exemption--Haddam Neck Plant," dated August 25, 1986.

8905020160 890428 PDR. ADOCK0500g3 l

F l

i

7-l .. .

Y U.S. Nuclear Regulatory Commission B13222/Page 2 April 28, 1989 We trust the Staff will find this information satisfactory, and we remain available to discuss any questions you may have.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY l C M$ta/s E.J/MFoczka g/