AECM-83-0812, Updated RO 83-096/1:on 830926,Fire Door OC313 Reported Inoperable.Caused by Heavy Use.Parts to Repair Door Ordered. Completion Expected by 840228.Fire Watch Established

From kanterella
Jump to navigation Jump to search
Updated RO 83-096/1:on 830926,Fire Door OC313 Reported Inoperable.Caused by Heavy Use.Parts to Repair Door Ordered. Completion Expected by 840228.Fire Watch Established
ML20083G933
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/30/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: O Reilly J, James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0812, AECM-83-812, RO-83-096-1, RO-83-96-1, NUDOCS 8401060477
Download: ML20083G933 (2)


Text

,,,

+4'[

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 gg4 Ali".epgr 30, 1983 NUCL EAN PRODUCTION DEPARTME NT U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-096/1 -

Update Report - Fire Door OC313 Inoperable AECM-83/0812 This is an update to a previous report submitted October 26, 1983, for the event described below. The purpose of this update is to provide a revised estimated completion date.

On September 26, 1983, fire door OC313, which is the double door to the main entrance of the lobby in the Control Building, was reported to be inoperable. The door had been damaged as a result of heavy use and would no longer secure. In accordance with Technical Specification 3.7.7.a. a fire watch was established. Because the door could not be returned to an operable status within seven days, the details concerning this event are being submitted as a Special Report pursuant to Technical Specification 6.9.2.

The parts necessary to repair the door are presently on order and the repairs are now expected to be complete by February 28, 1984 The fire watch will be maintained until the door is restored to an operable status. This condition has no effect on the health and safety of the public and does not constitute a threat to plant safety.

Yours tru y,

/

B401060477 031230 PDR ADOCK 05000416 S PDR L. F. Dale nager of Nuclear Services EBS/SHH: sap cc: (See Next Page)

r. ,

SkW Member Middle South Utilities System  ;

7

!. b AECM-83/0812 MISSISSIPPI POWER O LIGHT COMPANY Page 2 cc: Mr. J. B. Richard Mr. R. B. McGehee Mr. T. B. Conner Mr. C. B. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555