Special Rept 97-02:on 970916,during Routine Monthly Surveillance Run,Jacket Water Leak Developed at Dresser Coupling Joint.Jacket Water Leak Repaired & EDG Sucessfully Retested & Returned to Operable Status
ML20211P231
Person / Time
Site: Grand Gulf 
Issue date: 10/16/1997
From: Hughey W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-97-00100, GNRO-97-100, NUDOCS 9710200107
Download: ML20211P231 (8)


Text

.

O D

y r: lions, Inc.

C7/

Pm1 Gitsm. M3 33150 Td (014374470 W.K.Hughey wa rw ou, October 16, 1997 i

U. S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF 29 Special Report 97-002 Valid Failure of Division 2 Emergency Diesel Generator Due to a Jacket Water Leak GNRO-97/00100 Gentlemen:

On September 16,1997, operators performed a routine monthly surveillance run on the Division 2 Emergency Diesel Generator (EDG). Shortly before completion of the surveillance run, a jacket water leak developed at a Dresser Couplingjoint. The leak was estimated to be about half a gallon per minute, lt wasedeterphined that the half gallon per minute leak would prevent the EDG from compisting its design seven day run without operator action. As a result, the Jacket water leak was declared a valid failure of the Division 2 EDG.

The jacket water leak was repaired and the EDG was successfully retested and returned to operable status, in addition, a ifferent design will be installed on the Division 1 and 2 EDGs to address jacket water leaks.

1 h

i\\

9710200107 971016 PDR ADOCK 05000416 S

PDR

GNRO-97/00000 Page 2 of 3 The valid failure of the Division 2 EDG was the second valid failure in the last 25 valid tests and the third valid failure in the last 100 valid tests. The EDG was

- unavailable for 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> and 55 minutes. This failure is being reported pursuant to Grand Gulf Technical Requirements Manual sect'on 7.7.2.2 Yours truly, 7

WKH/JEO cc:

Ms. J. L. Dixon Herrity, GGNS Senior Resident (w/a)

Mr. N. S. Reynolds (w/a)_

Mr. L. J. Smith (Wise Carter) (w/a)

Mr. H. L. Thomas (w/o)

Mr. J. W. Yelverton (w/a)

Mr. J. N. Donehew, Project Manager (w/2)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mall Stop 13H3 Washington, D. C. 20555 Mr. E. W. Merschoff (w/a)

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011

______m_.________

t GNhtO-97/00000 Page 3 of 3 bec:

Mr. R. E. Brinkman (w/a)

Mr. C. W. Elissesser (wla)

Mr. D. R. Franklin (w/a)

Ms. C. W. Gunn (wla)/(2)

Mr. J. E Owens (w/a)

Mr. C. H. Quick (w/a)

Mr. C. D. Stafford (w/a)

Mr. G. D. Swords (w/a)

Mr. T. H. Thurmon (w/a)

Required Reading Coordinator (w/a)

File (LCTS/RPTS) (w/a)

File (NS&RA)(w/a)

File (Central)(w/a)(8 )

INPO Records Center (wla) 700 Galleria Parkway Atlanta, Georgia 30339-5957 s

r i

CONCURRENCE REVIEW FORM SECTION 1 RESPONSE DUE: 10/16/97 ONRO 97/00100 (NRC Required)

SU11 JECT:

Valid Failure of Emergency Diesel 12 Due to a Jacket Water Leak gst Y 10/14/97 Drew Bottemiller 10/14/97 James Owens NRC Document Preparer /Date Responsible Sect., Supt./Date Commitment Concurrence SECTION 11 LOCATIONS COMMITMENT PRIMARYlSECONDARY DUE DATE Page 1 Replace Dresser Couphngs using new design Maintenance Paragraph 2 h-30-78 This letter contains commitments requiring procedural implementation YES ( ) NO (X)

UFSAR Potential Impact Classification SECTION 111 UFSAR impact:

No X Yes IfYes:

A)

List UFSAR sections / tables / figures affected and describe nature of UFSAR impact.

B)

UFSAR revision affected:

Current Future C)

Additional comments:

\\

d 1

l SECTION IV Concurrence Review-Required Y

N

()

(X)

VP, Operations GGNS/Date

()

(X)

General Manager, Plant Operations /Date

()

(X)

Director, Design Engineering /Date (X)

(-)

8/3

/

Director, Nuclear Safety &

Regylat Affairs /Date (X)

()

i J

Idedager, Performance &

l System Engineering /Date IXi Qk- - =[

6 Manager, Maintenance /Date 0

r/PA fl0-t'l"ly V

l l

l l

l

~

t

)

VERIFICATION / CERTIFICATION FORM A.

Description SR 97-002:

Valid Failure on Emergency Diesel Generator 12 Due to a Jacket Water Leak B.

Verification The undersigned acknowledges that the technical content of the information described in section A above has been verified to be accurate and complete by review of the subject information and supporting material as listed below:

(A) CR 1997-085100 & 01 (B) - CR 1997 0899 (C) Work Order #s 191757,191701, and 194338 (D) GI Al 'l7[O/f 2 o.

Signature 18

/d84V

/ October 7,1997

/

Submittal Originator / Date Peer Concurrence Review rformed by:

Date: October,1997 bb'

.. /d"IN7 b[f J./s /r/

Signature / O/erations Signature / P&SE

_m k

\\O-N T Mnature / NS&RA C.

Certification Date: October.1997 The undersigned certifies that a verification review has been performed to confirm that the technical content of the information :ontained in this submittal is accurate and complete.

Signature

' 0'N M 3 Subtrittal Originator

GRA)ND GULr NUCLEAR PfATION SURVEILLANCE PROCEDURE b

06-OP-1P15-v-0011 R;visign 100 Attachment V Page 1 of 2 Page RTYPE B6.61 XRef DIESEL GENERATOR START IDG DIESEL 100t SEEET sa..n mELaw.u For All Diesel Generator Failures D b I 2-5.5.1 Diesel Generator No. :

5.5.2 Sequential start No.:

80 7 5.5.3 Type of failure (valid, invalid):

Ya fib 5.5.4 Failures in last 25 valid tests:

1 l

Failures in last 100 valid tests:

3 5.5.5 Cause cf fai,}ure:

3 a tkt 4 WoheY' leak cd- (Irr CS 6 C Coup lina A 4-4e p 0 + P n a r n e.

nn Nec4h

2. 5 /nc h li ne no, n n in C ombkwo%

& c b/ v.

(he M x.

A ne1\\ % oce mina k h J

Indke F Wh IMk rePdWd w,%

CorrebtivI 433A. ra dak n 5.5.6 measures t aio so1 Rtm *k oc,1 J-ses p e r4e rm, a +o co rrurm fcA K re Daired.

(LL n # t12 - 106 5

  • Ma ct'.9 -IL 'ti / cM OT E,+e p ; 9-l6-92 / 20 4 5 w ets w ri He n

~fe d eewmewt-DN G D/ C T N o r +e 6 Tuke+-wW'J6 awd.

e Imk Length of time diesel generator unavailable:

I 9 E rn e'n.

5.0.7 5.5.8 Current surveillance test intervals blb At>\\

5.5.9 Test interval in conformance with Tech Spec 3.8.1-1:

YE 6 l

5.5.10 Data Sheet III attached for each failure during troubleshooting:

N/4 Notify'the surveillance Coordinator if the AfM

/

periodicity needs to be changed.

Who Notified Date If failure is >/= 7 in last 100 valid tests, coroplete 5.5.11 through 5.5.14:

5.5.11 Corrective measures, taken or planned, to increase reliability of the diesel generators d/k H i \\T ECh_PU D\\ P ROC ED\\ 06 \\0 P 7 5V11. 7.5

e SURVEILIANCE PROCEDURE (MAND GULF NUCLEAR STATION a'

06-OP-1P15-V-0011 R:visien 100 Attachment V Page 2 of 2 Page RTYPE B6.61 XRef DIESEL m m ahTCR START LOG DIESEL 1016 SMEET sAnars smaA1=u 5.5.12 Assessment of existing reliability of electric power t E F c7uipment:

5.5.13 Basis for continued plant operation, if planned:

A.I[k 5.5.14 Data sheets attached documenting last 100 valid tests:

N M.

5.5.15 Completed by (name/date): (b

/ 9"/[' 97 o

(