AECM-90-0138, Special Rept:On 900627,fire Detection Instrumentation Declared Inoperable & Firewatch Established as Required by Tech Spec 3.3.7.9.Detectors Restored to Svc

From kanterella
Jump to navigation Jump to search
Special Rept:On 900627,fire Detection Instrumentation Declared Inoperable & Firewatch Established as Required by Tech Spec 3.3.7.9.Detectors Restored to Svc
ML20056A530
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/31/1990
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-90-0138, AECM-90-138, NUDOCS 9008080122
Download: ML20056A530 (2)


Text

h h l '

O " " '

. w-f"O 7 Sk QS Port Gour.lM3 39150 4

Tei 601.37 6408 q

W. T. Cottle 'i July 31,~1990 [j"'

cm cou.w swu,  :

U.S. Nuclear Regulatory Commission i Mail Station P1-137 l Washington, D.C. 20555 Attention: . Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 i License No. NPF-29 Inoperability of Fire Detection Instrumentation AECM-90/0138 On June 27, 1990, eleven Auxiliary Building smoke detectors located in Fire Zone 2-2 (Corridor 1A211) were removed from service to perform a Plant

' Service Water (PSW) design change. Plastic coverings were placed over the detectors to-prevent' alarms due to welding and grinding in the area. The-detectors.were declared inoperable at 0050 and a hourly firewatch was i established in the area as required by GGNS Technical Specification 3.3.7.9.

After completion of'PSW modifications, the detectors were restored to service. The detectors were declared operable at 1823 on July 20, 1990.

-This Special Report is being submitted pursuant to' Technical Specifications L 3.3.7.9 and 6.9.2.

! Yours truly, t o V-  ;

WTC:tkm M '

WC40TTim t' 4 4 #,

cc: (See Next Page) j t

900soso'132 900732 gDR fDOCK 05o00416 roc ggh

-.SR90002/SCMPFLR - 1 9

T.

i t

.AECM-90/0138 Page 2 e- <

cc: Mr. D.EC. Hintz (w/o) '

Mr. ,T. H. Cloninger (w/o)

Mr.N.R.

Mr. S. B. McGehee Reynolds (w/o (w/o))

Mr. H. L. Thomas (w/o)

Mr. H. O. Christensen (w/o)

Mr. Stewart 0. Ebneter (w/o)

Regional Administrator U.S. Nuclear Regulatory Comission P Region II 101 Marietta St., N.W.,-Suite 2900 Atlanta, Georgia 30323 1

Mr. L. L. Kintner, Project Manager _(w/o)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission .l Maf1 Stop 11021 Washington, D.C.- 20555  !

i l

i i

i o

1 L

SR90002/SCMPFLR - 2

__