AECM-83-0546, Updated RO 83-028/1:on 830329,fire-rated Penetrations,Listed on Encl,Opened to Implement Design Change Packages W/Hourly Fire Watches Established.Revised Completion Date of 831016 Established for Penetrations Not Restored

From kanterella
Jump to navigation Jump to search
Updated RO 83-028/1:on 830329,fire-rated Penetrations,Listed on Encl,Opened to Implement Design Change Packages W/Hourly Fire Watches Established.Revised Completion Date of 831016 Established for Penetrations Not Restored
ML20076L874
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/07/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0546, AECM-83-546, RO-83-028-1, RO-83-28-1, NUDOCS 8309190109
Download: ML20076L874 (3)


Text

.

4 MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi teMMdidd5 P. O. B OX 164 0, J AC K S O N, MIS SIS SIP PI 3 9 2 05 83 SEP14 Al0 : 35 NUCLEAR PRODUCT 10N DEPARTMENT September 7, 1983 U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Ret,fonal Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit i Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-028/1 - Update Report - Fire Rated Penetrations Opened to Implement Design Change Packages AECM-83/0546 This is an update to a previous report submitted on May 4, 1983, for the following event. Beginning on March 29, 1983, the fire rated penetrations, as listed on the attached page, were opened to implement design change packages.

Hourly fire watches were established within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and will be maintained for the duration of the planned maintenance activities in accordance with Technical Specification 3.7.7. The purpose of this update is to provide a revised estimated completion date for the fire rated penetrations that have not been restored.

These conditions have no affect on the health and safety of the public and do not constitute a threat to plant safety. The remainder of the work tasks are now expected to be completed by October 15, 1983. This is reported as a Special Report pursuant to Technical Specification 6.9.2.

Yours truly, fg L. F. Dale Manager of Nuclear Services EBS/SHH:rg Attachment cc: See next page 8309190109 830907 PDR ADOCK 05000416 cdh V

S pyg gy Member Middle South Utilities System Mk

8

' AECM-83/0546 MIMI;!!PPI POWER O LI2HT COM'PANY

] cc: Mr. J. B. Richard (w/a) i Mr. R. B. McGehee (w/o)

- Mr. T. B. Conner (w/o)

I Mr. G.'B., Taylor (w/o).

f Mr. Richard C. DeYoung, Director (w/a) j Office of Inspection & Enforcement i

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555 Document Control Desk (w/a)

- U. S. Nuclear Regulatory Commission

}-

Washington, D. C. 20555 i

i i

g:

(-

I t

E i

1 s

e l'

i 1

1

. - . . - - - - - . _ , _m_,,,.., , , , . . . , _ , _ , _ _ _ , , , , _ . , _ , . , ,

1

.-w-Attachment to

.-g AECM-83/0546 Page 1 of 1 Beginning on March-29, 1983, the following fire rated penetrations were opened to implement design change packages. A restoration date is listed for penetra-tions which have been' restored. The remainder are expected to be restored by October 15,t1983.

PENETRATIONS INCIDENT REPORT ~f DATE RESTORED CE-15E 83-03-126 CE-211D-02 83-03-128 07/06/83 CE-240D-12 83-03-128 07/06/83 CE-1E 83-04-03 CE-3E 83-04-03 CE-4E 83-04-03 CE-7E 83-04-03 CE-360F 83-04-11

, CE-359F 83-04-11 CE-358F 83-04-11 83-04-10 Between Auxiliary Building elevation 139 Area 8 and Control Building elevation 148 AE-63E ,

83-4-18 CABLE TRAY COVER

f. 1AE136C 83-04-16 05/21/83 i

FIRE DAMS LO84/LA40 in U-733 83-04-04 LO89 83-04-09 LA8 04-09 LO94 83-04-09 LA25 83-04-09 LA23 83-04-09 LO81/LA24 83-04-13 7/12/83 LO82/LA24 83-04-13 7/12/83 LO85/LA24 83-04-13 7/12/83

. LO77/LA24 83-04-13 7/12/83 l LO80/LA24 83-04-13 7/12/83 LO77/LA13 83-04-13 7/12/83 LO79/LA13. 83-04-13 7/12/83 LO86/LA24: 83-04-13 7/12/83 LO90/LA24 83-04-13 -

7/12/83

LO91/LA24 83-04-13 7/12/83

, LO92/LA13- 83-04-13 7/12/83 LO59/LA48: 83-04-14 7/12/83 LO61/LA32 :83-04-14 7/12/83 LO64/LA41 83-04-14 7/12/83 LO65/LA32' 83-04-14 7/12/83 LO60/LA32 83-04-14 7/12/83 P10rgi