Updated RO 83-025/1:on 830322,fire-rated Penetrations Opened to Implement Design Change Packages.Hourly Fire Watches Established.Work Tasks to Be Completed by 831015
ML20076L891
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/07/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0545, AECM-83-545, RO-83-025-1, RO-83-25-1, NUDOCS 8309190117
Download: ML20076L891 (3)


Text

.. ,

s nllsy;"o v: .

MISSISSIPPI POWER & LIGHT COMPANWfe;;

Helping Bl.ild Mississippi ' w G j;,

EulkhBaliddB P. O. B O X 16 4 0, J A C K S O N , M I S S (5,S I39205 September 7, 1983 /3 4 -

NUCLEAR PRODUCTON DEPARTMENT 0 U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-025/1 -

Update Report - Fire Rated Penetrations Opened to Implement Design Change Packages AECM-83/0545 This is an update to a previous report submitted on April 28, 1983, for the following event. Beginning on March 22, 1983, the fire rated penetrations listed on the attached page were opened to implement design change packages.

Ilourly fire watches were established within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and will be maintained for the duration of the planned maintenance activities in accordance with Technical Specification 3.7.7. The purpose of this update is to provide a revised estimated completion date.

This condition has no affect on the health and safety of the public and does not constitute a threat to plant safety. The work tasks are expected to be completed by October 15, 1983. This is reported as a Special Report pursuant to Technical Specificatiot B.9.2.

Yours truly, AN for L. F. Dale Manager of Nuclear Services EBS/SHH: sap Attachment cc: (See Next Page) 8309190117 830907 i PDR ADOCK 05000416 m.TICIAL COW -

S PDR ghL Member Middle South Utilities System l l

t

,- ,. AECM-83/0545

. Page 2 Mlagt;,rgppg POWER O LI2HT COMPANY cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document' Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I

t .

l 1

I

)- '

Attachm:nt to

'Beginning on. March 22, 1983, the following fire rated penetrations were opened to implement design ~ change packages. The revised estimated completion date for the work tasks'is October 15, 1983.

Penetrations Incident Report #

AE-414C 83-03-101 CE-93D 83-03-101 LE-230DA 83-03-101 AE-436C 83-03-103

-CE-80D 83-03-103 CE-202DA 83-03-103 CE-363G 83-03-114 CE-361G 83-03-114 CE=355C 83-03-114 CE-354G 83-03-114 CE-21E 83-03-119 CE-20E 83-03-119 CE-28E 83-03-120 CE-32E_ 83-03-120 Cable Tray Cover 1AETWI23 83-03-101 1AETWI27 83-03-101 1AETWI29 83-03-101 1AETM171 83-03-103 1AETOT07 83-03-103 Fire Dams LA45/LO62- 83-03-116 LA50/LO62 83-03-116 LA12/LO92 83-03-117 LA8/LO92 83-03-117 LA13/LO79/LA8 83-03-118 LA45/LO77/LA50 83-03-118