AECM-83-0539, RO 83-075/0:on 830722,smoke Detector N603A Relocated to Conform W/Electrical Raceway Drawings.Action Statements Entered & Fire Watch Established.Detector Returned to Normal Operation 830827

From kanterella
Jump to navigation Jump to search
RO 83-075/0:on 830722,smoke Detector N603A Relocated to Conform W/Electrical Raceway Drawings.Action Statements Entered & Fire Watch Established.Detector Returned to Normal Operation 830827
ML20085H728
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/02/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0539, AECM-83-539, RO-83-075-0, RO-83-75, NUDOCS 8309120398
Download: ML20085H728 (2)


Text

_ _ - _ _ _ _ _ _ _

e ,.

A h'o n, o: c MISSISSIPPI POWER & LIGHT COMPANY Helping Build _Mjsgissippi ' d i: -Q, EuRMMaddB P. O. D 0 X 16 4 O. J A C K S O N. WIfBy I S S I P P 1 3 9 2 0 5 September 2, 1983 4g, NUCLE AR Pno00CTioN DEFARTMENT [

l U. S. Nuclear Regulatory Commission l Region II

( 101 Marietta St., N.W., Suite 2900 l

Atlanta, Georgia 30303 I

Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Rcilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-075/0 -

Smoke Detector Inoperable as a Result of Planned Maintenance Activities AECM-83/0539 On July 22, 1983, smoke detector N603A in Zone 2-18 on Elevation 119 feet of the Aoxiliary Building was relocated to conform with the electrical raceway drawings. The action statements of Technical Specification 3.3.7.9 were entered and an hourly fire watch was conducted while the planned maintenance activity was performed. The detector was not restored to operability within fourteen (14) days, therefore, this report is being submitted as a Special Report pursuant to Technical Specification 6.9.2.

The detector was relocated on August 27, 1983, and the system was returned to normal operation. The event had no affect on the health and safety of the public and did not constitute a threat to plant safety. This report is a final report.

Yours truly, L. F. Dale Manager of Nuclear Services EBS/SHH: sap cc: (See Next Page) 8309120390 830902 f' PDR ADOCK 05000416 S PDR 43 f' p(

i M Member Middle South Utilities System 0

i .. 6

  • AECM-83/0539 MIL 21MIPPI POWER Q LIGHT COMPANY cc: Mr. J. B. Richard

.Mr. R. B. McGehee Mr. T. B. Conner Mr. G. B. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555

__g