Updated RO 83-023/1:on 830312,two Smoke Detectors in Standby Gas Treatment Filter Train Room (Zone 2-19) Covered While Conducting Welding Activities.Fire Watches Established. Detectors Should Be Operable by 830901
ML20072M955
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/08/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0379, AECM-83-379, RO-83-023-1, RO-83-23-1, NUDOCS 8307150144
Download: ML20072M955 (2)


Text

_ _ _ _ _ __

9 E MISSISSlP&lh0WER & LIGHT COMPANY

Helping Build Mississippi

( hT't M '

l P. O. B O X 164 0. J A C K S O N, MIS SIS SIP PI 3 9 2 05 JAMES P MCG AUGHY, JR 83 E 17 ^9 O 8- 983 v Ce ent StDasey Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region Il 101 Marietta St. , N.W. , Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station l Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-023/1 -

Update Report - Smoke Detectors Covered During Welding Activities AECM-83/0379 l This is an update to a previous report submitted on April 25, 1983. The event for which the report was submitted occurred on March 12, 1983, when two emoke detectors in the Standby Gas Treatment filter train room (zone 2-19) were covered while welding activities were conducted. Similarly, on March 15, 1983, a smoke detector in the Auxiliary Building (zone 2-8), at elevation 166 feet, was also covered. Fire watches were established in accordance with Technical Specification 3.3.7.9. This was reported as a Special Report pursuant to Technical Specification 6.9.2, since the 14 (fourteen) day LCO time limit was exceeded.

The detectors were covered to prevent actuation due to welding. In our previous report we estimated the detectors would be restored to operability by May 15, 1983. Presently, the work is physically complete but the work package is still in the review cycle. The detectors are now expected to be restored to operability by September 1, 1983.

Yours truly,

<t b~

JPM: sap -

cc: (See Next Page) 8307150144 830708 PDR ADOCK 05000416 S PDR pg.

Oyy1CIAL AD Member Middle South Utilities System 6

AECM-83/0379 age 2 MISSISSIPPI POWER O Ll2HT COMPANY cc: Mr. J. B. Richard Mr. R. B. McGehee Mr. T. B. Conner t Mr. G. B. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I