AECM-83-0345, RO 83-045/0 on 830515,Fire Doors OC501 & OC503 on East Side of Control Room Blocked Open to Allow Routing of Hoses to Seal fire-rated Penetrations in Control Room.Fire Watch Established.Completion Expected by 830725

From kanterella
Jump to navigation Jump to search
RO 83-045/0 on 830515,Fire Doors OC501 & OC503 on East Side of Control Room Blocked Open to Allow Routing of Hoses to Seal fire-rated Penetrations in Control Room.Fire Watch Established.Completion Expected by 830725
ML20072E841
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/17/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
83-045-0, 83-45, AECM-83-0345, AECM-83-345, NUDOCS 8306270165
Download: ML20072E841 (2)


Text

.-

p ..

P MiGSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi

( P. O. BOX 1640 J ACKSON MISSISSIPPI 392 June 17, 1983

"* i 7.78SU*

  • v

$ DC

- Lo Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission h-d70 Region II C -g 101 Marietta St., N.W., Suite 2900 m Atlanta, Georgia 30303 > d LD 00 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-045/0 - Fire Doors OC501 and Oc503 Blocked Open to Allow Performance of a Planned Maintenance Activity flCM-83/0345 On May 15, 1983, fire doors OC501 and OC503 on the east side of the Control Room were blocked open to allow the routing of hoses into the Control Room for the sealing of fire rated penetrations. A fire watch was established at the start of the planned maintenance activity and will be maintained for the duration in accordance with Technical Specification 3.7.7.

The doors were not closed by the seven day time limit of the action statement, therefore, this is being submitted as a Special Report pursuant to Technical Specification 6.9.2. The condition has no affect on the health and l safety of the public and does not constitute a threat to plant safety. The planned maintenance a :tivity is expected to be completed by July 25, 1983.

Yours truly,

,s 1.x a m JPM: sap cc: (See Next Page)

~

OFFICIAL COPyh 8306270165 830617 PDR ADOCK 05000416 S PDR Tg3 Member Middle South Utilities System g

~

14 - i .

AECM-83/0345

MISSISSIPPI POWER Q LIRHT COMPANY Page 2 4

L

";: i: ": **"":'

=Mr. T. B. Conner Mr. G. B. Taylor Mr. Richard C. DeYoung, Director

' Office of Inspection & Enforcement

< U. S. Nuclear Regulatory Commission Washington, D. C. 20555-P Document Control Desk l U. S. Nuclear Regulatory Commission Washington,-D.-C. 20555 i

l I

f i

l l

I i-I i

i I'

I

_