RO 83-037/0:on 830421,Fire Doors 1A214 & 1A210 Opened to Route Air Hoses Into Adjacent Motor Control Ctr Div I Switchgear Rooms for Planned Maint During Scheduled Electrical Outage.Doors Secured on 830509
ML20071N644
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/25/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0300, AECM-83-300, RO-83-037-0, RO-83-37, NUDOCS 8306070142
Download: ML20071N644 (2)


Text

'

1 i

i s a

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 May 25, 1983 JAMES P. McGAUGHY JR. CD y m......., c.a g Office of Inspection & Enforcement f_ T-@

U. S. Nuclear Regulatory Commissieu d D Region II - 30 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 o  ;@

15 5 mM Attention: Mr. J. P. O'Reilly, Regional Administrator en $$

a.,

"" 5 "'

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Decket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-037/0 - Fire Doors 1A214 and 1A210 Opened to Allow Routing of Air lloses AECM-83/0300 On April 21, 1983, fire doors 1A214 and 1A210 were opened to allow the routing of air hoses into the adjacent Motor Control Center Division I switchgear rooms to perform a planned nr.intenance activity (cleaning of Division I Motor Control Center's) during the planned Division I electrical outage. All fire rated doors are required to be closed at all times by Technical Specification 3.7.7 and since the doors were not closed by the LCO time limit of 7 days this is being submitted as a Special Report pursuant to Technical Specification 6.9.2.

The doors were secured on May 9, 1983, at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />. The event had no affect on the health and safety of the public and did not constitute a threat to plant safety. This is a final report.

Yours truly, JPM: sap cc: (See Next Page) 8306070142 830525 6MtN'M. '

PDR ADOCK 05000416

$5,$% h Member Middle South Utilities System i 0

. AECM-83/0300 M12OISSIPPI POWER FJ LICHT COMPANY #88' cc: Mr. J. B. Richard Mr. R. B. McGehee Mr. T. B. Conner Mr. G. B. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I