AECM-83-0252, RO 83-023/0:on 830312,two Smoke Detectors in Standby Gas Treatment Filter Train Room,Zone 2-19 Covered During Welding Activities to Prevent Actuation.Similar Event Occurred on 830315.Detector Operability to Be Restored by 830315

From kanterella
Jump to navigation Jump to search
RO 83-023/0:on 830312,two Smoke Detectors in Standby Gas Treatment Filter Train Room,Zone 2-19 Covered During Welding Activities to Prevent Actuation.Similar Event Occurred on 830315.Detector Operability to Be Restored by 830315
ML20073R202
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/25/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0252, AECM-83-252, RO-83-023-0, RO-83-23, NUDOCS 8305030562
Download: ML20073R202 (1)


Text

l MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O . B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 April 25, 1983 w

JAMES P. McGAUGHY. JR C.O  :

vece reasiosnt Office of Inspection & Enforcement 3 [j U. S. Nuclear Regulatory Commission ro :O Region II y 101 Marietta St., N.W., Suite 2900 3 c,;

Atlanta, Georgia 30303 ;g3 r Attention: Mr. J. P. O'Reilly, Regional Administrator _, t N

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-023/0 -

Smoke Detectors Covered During Welding Activities AECM-83/0252 On March 12, 1983, two smoke detectors in the Standby Gas Treatment filter train room, zone 2-19, were covered while welding activities were conducted. Similarly, on March 15, 1983, a smoke detector in the Auxiliary Building, zone 2-8, at elevation 166 feet was also covered.

The detectors were covered to prevent actuation due to welding. Fire watches were established in accordance with Technical Specification 3.3.7.9.

The detectors are expected to be restored to operability by May 15, 1983.

This is submitted as a Special Report pursuant to Technical Specification 6.9.2, since the 14 day LCO time limit was exceeded.

Yours truly, JPM: sap jc o jy 7, p 4 (7 ygg cc: Mr. J. B. Richard Mr. R. B. McGehee Mr. T. B. Conner Mr. G. B. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 . .

' " ,, g x M , W ]

Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 _C_E o2.M F305030562 830425 lember Middle South utilities System PDR ADDCK 05000416 0 PDR